bld20090447-WWTP-1.pdf
DATE: August 11, 2009
TO: Steve Koho
koho@ci.edmonds.wa.us
FROM: Jeanie McConnell, Engineering Program Manager
RE: Application #: bld20090447
Project: City of Edmonds WWTP
nd
Project Address: 200 2 Ave S
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised
plans/documents with a written response to each of the items below to Theresa Umbaugh.
City of Edmonds handouts, standard details and development code can be referenced on the City
website.
1.Please show where work materials, etc. will be staged on private property.
2.In the response letter to Leif Bjorback it was stated that irrelevant reference to other drawings
have been removed from drawing 050-S-011. However, sheet 050-S-011 was not resubmitted
so this cannot be verified. Please resubmit.
3.It appears from the key notes provided on Sheet 400-S-011 that the drainage from behind the
wall will be directed to the equipment pad. Where will the water be discharged to once it
reaches the pad?
Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have
specific questions regarding these plan corrections.
bld20090447-WWTP-1 Page 1 of 1