Loading...
bld20090498-Loring-1.doc City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Corrections Plan Check : Date: # bld20090498 July 31, 2009 Project Name/Address: Loring Deck Addition__ __227 Highland Dr Contact Person/Address/Fax: Shannon Ramey,PE Rampart Engineering ramparteng@hughes.net Reviewer: JoAnne Zulauf Division:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.ci.edmonds.wa.us under City Government / Development Services Department / Engineering Division then scroll down to Handouts: 1.How will drainage from the new impervious deck be handled? A couple of options are to drain to the system used by the existing structure or the deck could be drained to a drywell located at least 10ft from the structure. 2.Please add to the impervious surface calculations the square footage of the new walk/patio that will not be covered by the new deck. 3.The expired permit had included the existing driveway and walkway replacement. Was this work performed? If not, will that work be included in this permit? Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 7/3/2017 PAGE ___ OF __ 11