bld20090506-Weiner-1.doc
City of Edmonds
TH
121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORKS DEPARTMENT
Engineering Division
Plan Review Corrections
Plan Check : Date:
# 2009-0506 August 6, 2009
Project Name/Address:
Weiner 1012 Viewland Way Add
Contact Person/Address/Fax:
Fred Baxter fred@baxterarchitects.com
Reviewer: JoAnne ZulaufDivision:Engineering
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. Our handouts can be found online at the City of
Edmonds web site www.ci.edmonds.wa.us under City Government/Development
Services/Engineering Division.
General Comments:
existing
1.Impervious surface calculations need to list all impervious surface (house including eaves,
proposed
driveway, etc.) and the year they were built/installed. Then list the additional impervious
surface which also should include eaves. Impervious surfaces are surfaces that water can not penetrate
(asphalt, structures w/ eaves, concrete, etc.) Deck square footage is listed under impervious surface. It
does not appear impervious, is it covered or coated, or is there a concrete pad underneath it? If not,
please remove from impervious surface calcs. The concrete landings to be added at the rear of the home
and under the stairs are impervious and should be added to calculations. Please make appropriate
changes to impervious surface calculations. (Handout B#57 is an example of a site plan and shows how
to list impervious surface).
2.Please showing new concrete walk with dimensions on plan and add to proposed impervious
calculations.
3.Please show utilities on site plan. (water line from meter to hse, side sewer from property line to house,
etc..).
4.How will front porch and new concrete in front be tied into existing drainage system?
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.
DATE EMAILED 7/3/2017 PAGE ____ OF ___
11