Loading...
bld20090570-Tang-3.pdf City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check :Date: #2009-0570 October 13, 2009 th Project Name/Address: Tang 23311 76 Ave W sfr Contact Person/Address/Fax: Andy & Connie Tang Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. Our handouts can be found online at the City of Edmonds web site www.ci.edmonds.wa.us under City Government/Development Services/Engineering Division. Correction to the Oct 8, 2009 comments: In several comments I noted that the drainage water had to go into the infall side of the detention system. I spoke with the Stormwater Engineer and he told me that it is okay for the drainage areas to be connected at the outfall cb as well. Need to be sure that the invert is lower than the control structure in the cb. Footing drains still cannot be connected to the detention system. Thank you. JoAnne DATE MAILED/FAXED 10/13/2009 PAGE ____ OF ___ 12 Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE MAILED/FAXED 10/13/2009 PAGE ____ OF ___ 22