bld20090570-Tang-3.pdf
City of Edmonds
TH
121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORKS DEPARTMENT
Engineering Division
Plan Review Corrections
Plan Check :Date:
#2009-0570 October 13, 2009
th
Project Name/Address:
Tang 23311 76 Ave W sfr
Contact Person/Address/Fax:
Andy & Connie Tang
Reviewer: JoAnne ZulaufDivision:Engineering
During review of the subject submittal, it was found that the following information, corrections,
or clarifications would need to be addressed. Our handouts can be found online at the City of
Edmonds web site www.ci.edmonds.wa.us under City Government/Development
Services/Engineering Division.
Correction to the Oct 8, 2009 comments:
In several comments I noted that the drainage water had to go into the infall side of the detention system. I
spoke with the Stormwater Engineer and he told me that it is okay for the drainage areas to be connected at the
outfall cb as well. Need to be sure that the invert is lower than the control structure in the cb.
Footing drains still cannot be connected to the detention system.
Thank you.
JoAnne
DATE MAILED/FAXED 10/13/2009 PAGE ____ OF ___
12
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.
DATE MAILED/FAXED 10/13/2009 PAGE ____ OF ___
22