Plan Review Corrections
Plan Check :Date:
#BLD20090664 October 29, 2009
Project Name/Address:
Grout – 9531 Forest Dell Dr
Contact Person/Address/Fax:
Scottcraft Construction – scottcraftconstruction@msn.com
Jennifer CollinsDivision:Engineering
Reviewer:
During review of the subject submittal, it was found that the following information, corrections,
or clarifications would need to be addressed. Our handouts can be found online at the City of
Edmonds web site www.ci.edmonds.wa.us under City Government/Development
Services/Engineering Division.
Erosion Control:
1.OK
2.OK
Site Plan:
3.2/12/10 – Comment was addressed. However, it appears that the landscaped area between asphalt
edge and driveway differ between site plan and civils. Please redline or revise plans.
10/29/09 Comment: Driveway entrance must be a minimum12ft and shall not exceed 24ft in width per
City Standard Detail E2.26.
a.Site plan is showing 47ft width. Please revise all civil drawings and the site plan.
4.OK
5.OK
6.OK
7.OK
8.OK
9.OK
DATE MAILED/FAXED 2/12/2010 PAGE ____ OF ___
13
10.OK
11.OK
12.OK
Utilities:
13.2/12/10 Comment was partially addressed. Please show the location of the power and phone line
on the civil plan sheet C4.
10/29/09 Comment: Revise the title of sheet C4 to state Storm Drainage and Utility plan.
a.Please add and clearly label all proposed and existing utilities to sheet C4 (sewer, water, power,
phone, cable, and gas).
b.Please note that all new utilities must go underground.
14.OK
15.OK
16.OK.
17.OK
18.OK
19.OK
20.OK
21.OK
22.OK
23.OK
24.OK
25.OK
26.2/12/10 Comment was partially addressed. Please show 6” downspout drain pipe entering the
manhole and the invert elevation on Sheet C5, the Control Structure Detail.
10/29/09 Comment: Please note all rim and invert elevations at all catch basins and manholes.
27.OK
28.OK
Grading:
29.OK
Drainage/Detention Review comments from Storm Water Engineer, Jerry Shuster:
DATE MAILED/FAXED 2/12/2010 PAGE ____ OF ___
23
30.OK
Please refer to the attached document titled ‘Stormwater Management Review Checklist’ for review
comments from Jerry Shuster.
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.
DATE MAILED/FAXED 2/12/2010 PAGE ____ OF ___
33