City of Edmonds
TH
121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORKS DEPARTMENT
Engineering Division
Plan Review Corrections
Plan Check :Date:
#BLD20090731 December 10, 2009
nd
Project Name/Address:
Chateau Construction – 8006-192 St SW
Contact Person/Address/Fax:
Chateau Const –
michaelkerr1@verizon.net
Jennifer LambertDivision:Engineering
Reviewer:
During review of the subject submittal, it was found that the following information, corrections,
or clarifications would need to be addressed. Our handouts can be found online at the City of
Edmonds web site www.ci.edmonds.wa.us under City Government/Development
Services/Engineering Division.
st
Review – 11/20/09
1
nd
2 Review – 12/10/09
General:
1.12/10/09 – Comment was partially addressed. There are labels, notes, arrows, etc. shown on one
plan, but not the other or removed from one plan and not the others. Each plan (Site/Utility,
Grading, and Height plans) needs to be consistent with the other two plans. In addition, please
revise all plans to show ONLY what pertains to the lot that will be developed. Information
pertinent to the Site/Utility Plan must be shown on that plan sheet, etc. If items need to be shown
on multiple plans, please make sure they are consistent between each of the plans.
11/20/09 Comment: Please remove any labels or notes on site plan that are no longer accurate or have
nothing to do with the construction proposed for this permit such as line type-----------, etc.
2.OK
3.OK
Erosion Control:
4.OK
5.OK
DATE MAILED/FAXED 12/10/2009 PAGE ____ OF ___
13
6.12/10/09 – Comment was partially addressed. Please extend rock construction entrance to back of
sidewalk.
11/20/09 Comment: Please show rock construction entrance and add detail to plans. Must conform to
City of Edmonds standard detail E1.2.
7.OK
Utilities:
8.12/10/09 – Comment was not addressed.
11/20/09 Comment: Clearly label existing utilites both on site and within the right of way (installed
with the subdivision).
9.12/10/09 – Comment was partially addressed. Locations of all utilities must be on the Site/Utility
Plan. Also a note must be on plans stating that all new utilities will be underground. Please revise
accordingly.
11/20/09 - Please add and clearly label all proposed utilities (sewer, water, power, phone, cable, and
gas).
a.
Please note that all new utilities must go underground.
10.OK
11.12/10/09 – Comment was partially addressed. Please refer to comment #1 (utility information
needs to be on the Site/Utility Plan).
11/20/09 Comment: Please show sewer easement for the portion that crosses the neighboring property to
the west.
12.12/10/09 - Comment was partially addressed. Please refer to comment #1 (utility information
needs to be on the Site/Utility Plan).
11/20/09 Comment:Please show that a 10’ separation will be maintained between the water service line
and the side sewer.
Grading:
13.12/10/09 – Comment was not addressed.
11/20/09 Comment: Show bottom of footing elevations on site plan for new home in order to verify
grading calculations.
14.12/10/09 – Comment was not addressed.
11/20/09 Comment: Indicate if topos are existing (post short plat). If not please provide existing topos.
15.12/10/09 – Comment was not addressed.
11/20/09 Comment: Proposed topo line at the SW corner of property is showing grading to occur in
neighboring lot. Please revise to showing grading occurring only on subject lot.
DATE MAILED/FAXED 12/10/2009 PAGE ____ OF ___
23
Drainage:
16.12/10/09 – Comment was partially addressed. Driveway drains must be located in the driveway.
Please revise plans accordingly.
11/20/09 Comment: Clearly show footing and yard drains and their connections to the storm system that
pertain to the proposed single family residence.
12/10/09 – Comment was partially addressedPlease refer to comment #1 (extra arrows, hatching,
17..
and lines shown).
11/20/09 - Please revise site plan to accurately depict the city storm system as it exists and short plat
connections to the system.
12/10/09 – This comment was not addressed.
18.
11/20/09 Commnet: Indicate surface water runoff flows on the driveway and how the runoff will be
collected
a.12/10/09 – This comment was addressed.
All runoff from the driveway must be collected and
drained to the detention system.
b.12/10/09 – Comment was partially addressed. Please show rim and invert elevations for
storm stub.
11/20/09 Comment: Please note all rim and invert elevations at the driveway drain and storm
stub.
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.
DATE MAILED/FAXED 12/10/2009 PAGE ____ OF ___