Loading...
bld20090731-Chateau_2.pdf City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check :Date: #BLD20090731 December 10, 2009 nd Project Name/Address: Chateau Construction – 8006-192 St SW Contact Person/Address/Fax: Chateau Const – michaelkerr1@verizon.net Jennifer LambertDivision:Engineering Reviewer: During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. Our handouts can be found online at the City of Edmonds web site www.ci.edmonds.wa.us under City Government/Development Services/Engineering Division. st Review – 11/20/09 1 nd 2 Review – 12/10/09 General: 1.12/10/09 – Comment was partially addressed. There are labels, notes, arrows, etc. shown on one plan, but not the other or removed from one plan and not the others. Each plan (Site/Utility, Grading, and Height plans) needs to be consistent with the other two plans. In addition, please revise all plans to show ONLY what pertains to the lot that will be developed. Information pertinent to the Site/Utility Plan must be shown on that plan sheet, etc. If items need to be shown on multiple plans, please make sure they are consistent between each of the plans. 11/20/09 Comment: Please remove any labels or notes on site plan that are no longer accurate or have nothing to do with the construction proposed for this permit such as line type-----------, etc. 2.OK 3.OK Erosion Control: 4.OK 5.OK DATE MAILED/FAXED 12/10/2009 PAGE ____ OF ___ 13 6.12/10/09 – Comment was partially addressed. Please extend rock construction entrance to back of sidewalk. 11/20/09 Comment: Please show rock construction entrance and add detail to plans. Must conform to City of Edmonds standard detail E1.2. 7.OK Utilities: 8.12/10/09 – Comment was not addressed. 11/20/09 Comment: Clearly label existing utilites both on site and within the right of way (installed with the subdivision). 9.12/10/09 – Comment was partially addressed. Locations of all utilities must be on the Site/Utility Plan. Also a note must be on plans stating that all new utilities will be underground. Please revise accordingly. 11/20/09 - Please add and clearly label all proposed utilities (sewer, water, power, phone, cable, and gas). a. Please note that all new utilities must go underground. 10.OK 11.12/10/09 – Comment was partially addressed. Please refer to comment #1 (utility information needs to be on the Site/Utility Plan). 11/20/09 Comment: Please show sewer easement for the portion that crosses the neighboring property to the west. 12.12/10/09 - Comment was partially addressed. Please refer to comment #1 (utility information needs to be on the Site/Utility Plan). 11/20/09 Comment:Please show that a 10’ separation will be maintained between the water service line and the side sewer. Grading: 13.12/10/09 – Comment was not addressed. 11/20/09 Comment: Show bottom of footing elevations on site plan for new home in order to verify grading calculations. 14.12/10/09 – Comment was not addressed. 11/20/09 Comment: Indicate if topos are existing (post short plat). If not please provide existing topos. 15.12/10/09 – Comment was not addressed. 11/20/09 Comment: Proposed topo line at the SW corner of property is showing grading to occur in neighboring lot. Please revise to showing grading occurring only on subject lot. DATE MAILED/FAXED 12/10/2009 PAGE ____ OF ___ 23 Drainage: 16.12/10/09 – Comment was partially addressed. Driveway drains must be located in the driveway. Please revise plans accordingly. 11/20/09 Comment: Clearly show footing and yard drains and their connections to the storm system that pertain to the proposed single family residence. 12/10/09 – Comment was partially addressedPlease refer to comment #1 (extra arrows, hatching, 17.. and lines shown). 11/20/09 - Please revise site plan to accurately depict the city storm system as it exists and short plat connections to the system. 12/10/09 – This comment was not addressed. 18. 11/20/09 Commnet: Indicate surface water runoff flows on the driveway and how the runoff will be collected a.12/10/09 – This comment was addressed. All runoff from the driveway must be collected and drained to the detention system. b.12/10/09 – Comment was partially addressed. Please show rim and invert elevations for storm stub. 11/20/09 Comment: Please note all rim and invert elevations at the driveway drain and storm stub. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE MAILED/FAXED 12/10/2009 PAGE ____ OF ___ 33