BLD20100151 Plan Review Comments #1.pdf
CE
ITY OF DMONDS
PLANREVIEWCOMMENTS
PLANNINGDIVISION
425.771.0220
DATE: March 24, 2010
TO: Phil King Designs
pkdphil@comcast.net
FROM: Kernen Lien, Associate Planner
RE: Plan Check BLD20100151
Addition/Remodel of a Single Family Residence at 624 Sunset Avenue North
On behalf of the Planning Division, I have reviewed the above building permit application.
During review of the subject submittal, it was found that the following information, corrections,
or clarifications need to be addressed. Please respond to the following items, so that I can
complete my review:
Property Boundaries
1.: The property boundaries on the plot plan appear to be derived from
the paved centerlines of Sunset Avenue North and Casper Street. The center of the paved
area is not necessarily the center of the city’s right-of-way, as such; the property boundaries
identified on the plot may not be accurate. In fact, some of the identified property boundary
lengths differ from those in the legal description. This project has some areas that appear to
be located within the required zoning setbacks, and other portions that are really close to the
property boundaries and/or setbacks. Additionally there are some easements on the subject
property that may impact the proposal, one of which is the side sewer connection for the
property at 620 Sunset that may run under the proposed garage.
In order to protect the property owners from potentially having to remove a portion of
proposed additions at some point in the future because it was constructed within the setback
or over an easement, the City is requesting a survey to determine the location of the property
boundaries. Please provide a survey and include the location of any easements on the survey
and structures on the survey.
Roof Raise
2.: The proposal includes raising the roof of the structure that juts out to the north
in order to match the roof line to match the ridge of the adjacent residence. This portion of
the residence is within the street setbacks of Casper, which is 20 feet for the RS-6 zone.
Since it is within the setbacks, it is a nonconforming structure. Pursuant to Edmonds
Community Development Code (ECDC) 17.40.020.B nonconforming structures cannot be
changed or altered in any manner which increases the degree of nonconformity. Raising the
roof within the setback increases the nonconformity by increase the amount of the structure
that is located within the setback, and thus is not allowed. Only that portion of the roof that
is not within the setback may be raised to match the other ridge line.Please revise the plans
indicating the roof will remain at its current height, or only raising the portion of the roof that
is not located within the setback.
Accessory Dwelling Unit
3.: During review of your floor plans, it was noted that the proposal
includes the second kitchen in the basement. Since the house is proposed to contain a second
kitchen, a covenant must be recorded at the County stating that you are aware that an
Accessory Dwelling Unit (ADU) permit must be approved separately from this building
permit application if you intend for the basement to act as a separate dwelling unit apart from
the main residence. Even if you do not intend for the basement to act as an ADU, the
purpose of getting this statement recorded is to protect any future owners from thinking that
the house contains an approved ADU. I am enclosing the City’s ADU handout as well as the
covenant that must be recorded at the County. Please review and sign these materials. Note
that signatures must be notarized and signed in black ink. Also note that due to the County’s
restrictions on margins, the covenant must be printed on legal sized paper and cannot have
writing located within the margins. You may either get the covenant recorded at the County
on your own for $62, or you may turn it in to the City to record it at the County for you for
$82 (the County’s $62 recording fee plus a $20 City surcharge fee).
If you are interested in applying for an ADU permit, you are welcome to contact me on
application procedures.
Please make all submittals to a Development Services Permit Coordinator, Monday through
Friday, 8:00 am 4:30 pm. If you have any questions, feel free to contact me at 425.771.0220
ext 1223.