bld20100151-Bettinger-1.pdf
City of Edmonds
TH
121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
DEVELOPMENT SERVICES DEPARTMENT
Planning • Building • Engineering
Plan Review Corrections
Plan Check :Date:
#2010-0151 March 29, 2010
Project Name/Address:
Bettinger 624 Sunset Ave Addition
Contact Person/Address/Fax:
Phil King Designs 425-745-9233 pkdphil@comcast.net
Reviewer: JoAnne ZulaufDivision:Engineering
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at
our website: www.ci.edmonds.wa.us under City Government / Development Services Department /
Engineering Division then scroll down to Handouts:
It is my understanding that you have been requested to do a survey to verify property lines and easement
locations. There are my initial comments but I may have a few more questions once we received the site plan
based on the survey.
1. Please show utilities on site plan (e.g. water line from meter to house, side sewer from property
line/easement to the house, gas, etc).
2. Will you be repaving the driveway?
3. Will there be additional grading cut when adding the pool? If so, it is included in the grading calcs?
4. What drainage system does the current home use? Please note on plans “drainage to existing _xx___
system”.
5. Show sidewalks and curb on plans.
6. If trucks or equipment will be parked on street, a right of way permit will be required. I have attached a
right of way permit application for you use if needed.
7. Call out distance between proposed garage and easement.
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.
DATE FAXED/E-MAILED 3/29/2010 PAGE __1__ OF __1_