Loading...
bld20100157-Canaan_ENG2.pdf City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check :Date: #BLD20100157 May 7, 2010 th Project Name/Address: Canaan – 7104 – 210 St SW Contact Person/Address/Fax: Robert Canaan – kcanaan@yahoo.com Jennifer LambertDivision:Engineering Reviewer: During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. Our handouts can be found online at the City of Edmonds web site www.ci.edmonds.wa.us under City Government/Development Services/Engineering Division. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. st 1 Review – 3/31/10 nd 2 Review – 5/7/10 Site Plan: General: 1.OK Erosion Control: 2.OK 3.OK Utilities: 1.5/7/10 – Comment was not addressed. 3/31/10 Comment: Please remove the detention system from the site plan. DATE MAILED/FAXED 5/7/2010 PAGE ____ OF ___ 14 Grading: 1.OK 2.OK Storm, Water, Sewer, Engineering Plan: General: 1.OK 2.OK 3.OK 4.5/7/10 – Comment was partially addressed. Please show that 22’ of the private drive is paved along the frontage of the subject property. Please also indicate how the surface water runoff from the taper will be directed to the existing storm system. 3/31/10 Comment: Per ECDC 18.80.010 the minimum width for the RM zone serving 3-4 lots is a 22’ paved. Please revise plans to show road widening along the frontage of the subject property meets these requirements. In addition, you will need to provide and asphalt taper from the south portion of the access tract to the newly widened portion. a.Please indicate how surface water runoff from the widening will be handled. b.Please indicate how surface water runoff from the existing tract is directed to the storm system. c.Please clarify what the existing storm system consists of. Is there a detention system within the road? Does the existing CB control structure shown on plans collect runoff? Utilities: 1.5/7/10 – Comment was partially addressed. Please show the location of the gas, power, phone, cable. 3/31/10 Comment: Please show location of all existing and proposed utilities (water, sewer, storm, gas, power, phone, cable) a.Please note that all new utilities must go underground. 2.5/7/10 – Comment was partially addressed. The sewer easement is shown, but is noted as a utility easement. Please revise to state Public Sewer Easement. 3/31/10 Comment: Please show sewer easement (see attached) within the private drive. a.Please note that utilities should not be constructed within the sewer easement. Please revise accordingly. 3.OK 4.5/7/10 – Comment was not addressed. The cleanout at the property line/easement line was removed. Please add the cleanout to the plans and add note ‘a’ from comment number 4 dated 3/31/10. DATE MAILED/FAXED 5/7/2010 PAGE ____ OF ___ 24 3/31/10 Comment: The plans it show a cleanout near the property line. a.Please note on the plans that the cleanout shall be 6” with 12” cast iron locking lamphole cover (with ½” hexbolts) on right of way side of property line. 5.OK 6.OK 7.OK 8.OK 9.OK 10.OK 11.OK 12.OK 13.OK 14.OK Drainage: 1.OK 2.OK 3.OK 4.OK 5.5/7/10 – Comment was not addressed. Please add directional arrows to show how surface water runoff from the driveway will be collected to on-site detention system. 3/31/10 Comment: Please indicate how surface water runoff from the driveway will be collected. All runoff must be collected and drained to the detention system. 6.OK 7.OK 8.OK 9.OK Traffic Impact Analysis: Per Chapter 18.82 – Traffic Impact Fees of the Edmonds Community Development Code (ECDC), traffic impact fees shall be required. 1.OK DATE MAILED/FAXED 5/7/2010 PAGE ____ OF ___ 34 DATE MAILED/FAXED 5/7/2010 PAGE ____ OF ___ 44