Loading...
bld20100175-Corner-1.pdf City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Corrections Plan Check :Date: #2010-0175 March 22, 2010 Project Name/Address: Corner 18803 Sound View Pl Addition Contact Person/Address/Fax: James and Eleanor Corner cornerhomes@msn.com Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.ci.edmonds.wa.us under City Government / Development Services Department / Engineering Division then scroll down to Handouts: 1. The new covered porch and concrete walk are also considered new impervious surface. Please add to impervious surface calculations. 2. If I am reading the plans correctly, the existing impervious surface will be removed prior to constructing the addition. If this is the case, the addition is considered new impervious. Please remove the reference to “over existing impervious” for proposed addition impervious surface. 3. Please show utilities on site plan e.g. water line from meter to house, side sewer from property line to house. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 3/22/2010 PAGE __1__ OF __1_