bld20100182-Clearwater-1.pdf
City of Edmonds
TH
121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORKS DEPARTMENT
Engineering Division
Plan Review Corrections
Plan Check :Date:
#BLD20100182 April 14, 2010
th
Project Name/Address:
Clearwater SFR 8004 240 St SW
Contact Person/Address/Fax:
Western Ridge Construction burtmack112@yahoo.com
Reviewer: JoAnne ZulaufDivision:Engineering
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts and Standard Details referred to in these
comments can be accessed at our website: www.ci.edmonds.wa.us by clicking City Government / City
Department / Public Works / Engineering Division:
General Comments:
1.Label all property improvements (utilities, access easement, etc) as “existing” or “proposed”.
2.Please note on plans “Detention installed with short plat S-05-38”.
Erosion Control:
1.Please note on all plans “Erosion Control shall be consistent with City of Edmonds Requirements”
2.Please call out catch basin inlet protection for existing catch basin in access road. Reference standard
detail E1.3.
3.Please extend silt fence along full length of south property line. Reference standard detail E1.1.
4.Reference standard detail E1.2 at call out for Temporary Construction Entrance.
5.Please replace erosion control details with City of Edmonds Standard Details E1.1, E1.2 and E1.3.
6.Please change note in “Erosion Information” box on site plan to read “See Site/Drainage Plan for
temporary erosion control measures and Erosion Control sheet for details”.
Grading:
1. Please recalculate grading cut amount. My calculations come closer to 200cyds.
2. Do the original grade topos represent actual existing grades or are they pre-subdivision grades? If not
actual grades, provide actual topos on grading plan.
Drainage
:
1.Provide rim and invert elevations for tightline connection to stub and elevation at connection to house.
2.Call out material, size and length of tightline and footing drain piping.
3.How will runoff for driveway be tied in to the detention system?
4.Footing drains cannot be connected to detention system. Please review the short plat civils for installed
improvements. Civils show a drainage pipe running along property bypassing the detention system
DATE FAXED/E-MAILED 4/16/2010 PAGE ___ OF __
12
that would be suitable for footing drains to connect. Revise plans to show drainage pipe and
connection of footing drains.
Utilities
:
1.Please show gas, power and cable utilities on plan from property line to point of connection to the
residence.
2.Add note to plans “All utilities shall be installed underground”.
3.Please note whether water meter is proposed or existing.
4.Call out material, size and length of water service line.
5.Please label sewer stub as existing.
6.A 4” clean out must be installed at the house. Note requirement on plans.
7.Call out sewer pipe material, size and length of pipe. Please provide invert elevations at cleanout and
stub.
Incomplete Subdivision Site improvements deferred to residential permit:
1. A cluster mailbox must be installed per Postmaster requirements. Show location on plans.
2. Signage installation requirements per short plat.
a) “Access Road Ends” sign per City of Edmonds standard detail E8.4.
b) Fire and Address sign per City of Edmonds standard detail E8.3.
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.
DATE FAXED/E-MAILED 4/16/2010 PAGE ___ OF __
22