Loading...
bld20100345-Stewart-covenant.pdf1 E CONSTRUCTION VISION I AbOVe AND Beyondt Jeanie McConnell December 20, 2010 Engineering Program Manager City of Edmonds Planning Dept. Re: 919 Cedar &rset; peamlt application 9 BLD20100345 As you may know, I am a huge proponent of Low Impact Development and have done a couple of LID projects in the City of Shoreline. I am really happy to see that on this Cedar Street site, a compromise has been reached that will allow the developer to implement sensible LID strategies 'that are compatible with the terrain thus unburdening the piped storm system from most of the water that will land on this property. A maintenance covenant that gets recorded on title for any type of storm system is pretty Much standard fare these days, in all jurisdictions. In fact, without agreements of this type, City officials would carry -too much liability when owners don't properly care for these systems, The LID storm components and maintenance agreement for this site need to get spelled out on a document that will get recorded on title, but I believe that the actual recording of the document should not take place until the system components have been installed for two reasons. 'I . An as -built drawing after construction will reflect what the system really looks like. rhere are always variables in the field and until the storm water assembly is complete, the drawing will not be accurate. 2. If the economy doesn't improve enough to justify the construction of this new home, the recording of the document becomes irrelevant. Having a cloud on a title on something that MAY happen is generally not done. I In Shoreline, they have a policy of getting the Covenant recorded after the work is complete. They have leverage because they will not sign off permits or permit occupancy until the documents are filed with the county. So, we will have the documents prepared for your approval, but request that you place a condition on the permit and plans that the covenant be recorded after installation and before.finals are issued. Thank you for your help with this matter,