Engineering Plan Review Comments
Permit Application :Date:
# BLD20100395 7/6/10
Project Name/Address:
Whitney – 20909 Hillcrest PL
Contact Person/Address, Fax or E-mail:
Albert Cohen, alcohendesign@verizon.net
Reviewer: JENNIFER LAMBERT Division:
ENGINEERING
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at
our website: www.ci.edmonds.wa.us under City Government / Development Services Department /
Engineering Division then scroll down to Handouts:
1)Show the location of the water service line from the meter to the house.
2)Show the location of the side sewer from the sewer main to the house.
3)Please show a barrier fence around the existing infiltration trenches to protect during
construction work.
4)Clearly label and show all retaining walls, rockeries, and fences as existing and proposed.
a.It appears that there is an existing fence on the property. Please revise accordingly.
5)Please clearly show and label the existing and proposed roof outlines. This will allow us to
accurately calculate the new impervious surfaces.
a.It is unclear if what is shown are roof lines or foundation lines. Please revise accordingly.
6)Please show all trees on the property and label to be removed or remain.
a.If trees are to remain and are near the construction area, please show a barrier fence
around the tree to protect during construction.
7)Please show silt fence along east portion of addition to be installed per Edmonds Standard Detail
E1.1 as required.
DATE E-MAILED 7/6/2010 PAGE()
1
City of Edmonds
TH
121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
DEVELOPMENT SERVICES DEPARTMENT
Planning • Building • Engineering
Engineering Plan Review Comments
At this time we do not have enough information to review the drainage plan. Please provide the
following:
1)Please provide the elevation of the outlet pipe from the storm tank.
2)Please provide the calculations for the north infiltration trench to verify that the system is
designed properly.
Once the following items are received engineering will continue the stormwater review.
Please resubmit 3 copies of the revised site drawings and associated documents with a written response to
each item to an Engineering Technician. Please contact me at 425-771-0220 ext 1321 or by e-mail at
collinsj@ci.edmonds.wa.us if you have specific questions regarding these plan corrections.
DATE E-MAILED 7/6/2010 PAGE()
2