Engineering Plan Review Comments
Permit Application :Date:
# BLD20100429 August 6, 2010
th
Project Name/Address:
Kintz/Wu – 22522 – 95 Pl W
Contact Person/Address, Fax or E-mail:
trisha@lqh-inc.com , duane@lqh-inc.com
Reviewer: JENNIFER LAMBERT Division:
ENGINEERING
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at
our website: www.ci.edmonds.wa.us under City Government / Development Services Department /
Engineering Division then scroll down to Handouts:
Comments below refer ONLY to the Site Plan and Drainage Plan submitted. There was an additional
plan submitted (not titled); however, this plan differs from the other two plans and was not included in
the review comments. If you would like this plan to be reviewed, please resubmit this plan with a title
and revise to match the Site Plan and Drainage Plan submitted.
Site Plan:
General:
1)Please revise the impervious surface calculations as shown below (refer to Handout E72 for
definitions of terms used):
TypeArea (square Feet)
Line
Exempt
1.
ExemptNon-Exempt
Replaced
2.
New
3.
Total Replaced +New (Non-
Exempt) =
4.
(add numbers in blue boxes)
2)Add grading calculations to the plan.
3)Show bottom of footing elevations on site plan in order to verify grading calculations.
DATE E-MAILED 8/6/10 PAGE()
1
City of Edmonds BLD20100429
TH
121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORK DEPARTMENT
Planning • Building • Engineering
Engineering Plan Review Comments
Erosion Control Plan:
1)The Site Plan and Drainage Plan states there is a separate erosion control plan; however, no
erosion control plan was submitted. Please provide this plan or add notes to the Drainage Plan
with the appropriate temporary erosion control measures to be installed and note the appropriate
City of Edmonds Standards details.
2)If there are any, please show all trees within the construction area and label to be removed or
remain.
a.If trees are to remain and near the construction area, please show a barrier fence around
the tree to protect during construction. Barrier fence should be installed at the drip line of
the tree.
Drainage Plan:
1)Please revise title of Drainage Plan to state “Drainage and Utility Plan”.
2)Please remove the silt fence on the Drainage Plan.
Utilities:
1)Please show the location of all the utilites installed with the short plat and proposed (water, sewer,
th
Pl SW to the house.
storm, gas, power, phone cable from 95
a.Please add note that all new utilities must go underground.
th
b.Please show main lines in 95 Pl SW.
c.Please show the side sewer from the sewer main to the house and distinguish between
existing and proposed.
d.Please show the water meter and water service line from the house to the water meter and
distinguish between existing and proposed.
e.Please provide rim and invert elevations for each catch basin where a new connection will
occur.
DATE E-MAILED 8/6/10 PAGE()
2
City of Edmonds BLD20100429
TH
121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORK DEPARTMENT
Planning • Building • Engineering
Engineering Plan Review Comments
Drainage:
1)Please add the impervious surface calculations as stated under Site Plan comment #1.
2)Please fill out the stormwater worksheet provided in handout #E72 (attached) and submit with
plans.
b.Once you have determined which Small Site Category the proposed project is, please
provide a document (or add to the plans) each of the small site minimum requirements
(SSMR) and an explanation as to how the requirements have been met. The SSMR 5 can
be found in the Stormwater Supplement, chapter 5.
3)Please show how surface water runoff from the roof will be discharged to the detention system.
4)Please show the footing drains connected to the outfall line of the detention system.
5)It was determined that the existing detention system was designed to collect for 7797 sq. ft. of
surface water runoff. However, it appears that the provided calculations from MRK Engineering
does not include the access easement. Please revise accordingly.
c.Please show on plans that the existing access road is included in the calculations.
For example: Detention system designed for: XXXX sq ft
Impervious surface water runoff from:
th
Existing: 22520 – 95 Pl W XXXX sq ft
Existing: Access road XXXX sq ft
th
Proposed: 22522 – 95 PL W XXXX sq ft
Total to detention system XXXX sq ft
This will be an additional calculation to the required impervious surface calculations
requested in # 10.
d.It appears that the total impervious area being collected exceeds the designed amount for
the existing detention system. Please show how the additional impervious will be handled
(i.e. extending the existing detention system, direct runoff to a rain garden, etc).
Pervious Concrete:
DATE E-MAILED 8/6/10 PAGE()
3
City of Edmonds BLD20100429
TH
121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORK DEPARTMENT
Planning • Building • Engineering
Engineering Plan Review Comments
1)If this site classifies as a small site, category 1 (determined from worksheet in handout #E72),
pervious concrete will be considered mitigated if installed:
2.5 inch to 0.5 inch uniformly graded crushed (angular) thoroughly washed stone
(AASHTO No. 3), or
Thoroughly washed clean Shoulder Ballast meeting the requirements of Washington
Dept. of Transportation Standard Specifications 9-03.9(2)
(http://www.wsdot.wa.gov/publications/manuals/M41-10.htm)
An alternate approved by the City Engineer
a.Please provide the specifications of the pervious concrete proposed for review and
approval.
b.Please note on plans that no runoff from additional impervious areas will flow onto the
pervious concrete (i.e. downspouts, patio runoff, etc.).
Traffic Impact Analysis:
Per Chapter 18.82 – Traffic Impact Fees of the Edmonds Community Development Code (ECDC), traffic
impact fees shall be required.
1.Please complete numbers 1 and 7 of the Traffic Impact Analysis Worksheet from City of
Edmonds handout #E82, “Traffic Impact Analysis Requirements” (attached).
Please resubmit 3 copies of the revised traffic control plans and associated documents with a written
response to each item to an Engineering Technician. Please contact me at 425-771-0220 ext 1321 or by e-
mail at jennifer.lambert@ci.edmonds.wa.us if you have specific questions regarding these plan
corrections.
DATE E-MAILED 8/6/10 PAGE()
4