Loading...
bld20100457-A Plus Academy-TIA.pdfF City of Edrnonds '"Fraffic Irripact Analysis Worksheet Name of Proposed Project: Owner/Applicant Name Applicant Contact Person: Name Street/Mailin'g Address kr Street/Mailing Address City State Zip city State Zip - F Telephone: - 1'.0 (P I :i2 Telephone: Traffic Engineer who prepared the Traffic Impact Analysis (Wapplicable): Firm Name Telephone: THRESHOLD LEVELS OF ANALYSIS Traffic Levels T. -11 A-ess than 25 peak -hour trips generated IT. More than 25 peak -hour trips generated a. Location - Street address: '7 Contact Name F-rnaih Sections to Com,Dlete I and 7 only (Worksheet/Checklist) All sections (Attach a vicinity inap and site plan.) b, Specify existing land use: _�+4�u c. Specify proposed type and size of development: L"L 4tu (# of residential units andlor square L 4-- footage of bul ani) Revi-%ed on 6124110 F82 - Trqffiv hnpact Analysis Worksheet Page / of 5 d. Date construction will begin and be completed: 'I nL- e. Define proposed access locations: :1r)t i hila j �J f. Define proposed sight distance at site egress locations: k 0 t' 2. TRIP GENERATION Source shall be the Eighth Edition of the Institute of Transportation Engineers (ITE) Trip Generation manual. For independent fee calculations, the current edition of the ITE manual may be used. ADT = Average Daily Traffic PM Peak -hour trips (AM, noon or school peak may also apply as directed by the City Engineer) a. Existing Site Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT b. Proposed Project Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT c. Net New Project Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT d. State assumptions and methodology for internal, Iink-diverted or passby trips: Revised on 6/24/10 E82 - Traffic Impact Analysis Worksheet Page 2 of 5 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. KLHANGE IN USE Fee for prior use shall be based on fee established at the time the prior.use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09112104), the 2004 ECDC 18.82.120 impact fee shall be used. Units in square feet, # of dwelling, of , etc. X l �'b �Q - X Fee New Use Fee: $ � Prior Use Fee; $ �yr NEW DEVELOPMENT ITE Land Use Category per Unit Fee Rate New Use G y $ 1 Prior Use $ Units in square feet, # of dwelling, of , etc. X l �'b �Q - X Fee New Use Fee: $ � Prior Use Fee; $ �yr NEW DEVELOPMENT ❑ OTHER X Units in square feet, # of dwelling, vfp, etc. MITIGATION FEE RECOMMENDATION: ITE Land Use Category Per Unit $ $ Fee Rate New Use $ ❑ OTHER X Units in square feet, # of dwelling, vfp, etc. MITIGATION FEE RECOMMENDATION: INDEPENDENT FEE CALCULATION: $200.00 + consultant fee TOTAL TRAFFIC IMPACT FEE $ $ Y� -9 �r Division Approval Date 1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. Revised on 6124/10 E82 - Traffic Impact Analysis Worksheet Page 5 of 5 j Y 3 / •/ I � � � �.—��«�E3t4a��7 L4CALOFi d ' /t / I s' ` x _ r rf m a I `:SIT PLAN �T �. A PLUS ACA IMY SCAi„=2�' [i” FOR Rl�E:�il�.".r.. o�J;.Y 2/27 lil"N 99 #101 EDMONDS A 95026 F._ / j Y 3 / •/ I � � � �.—��«�E3t4a��7 L4CALOFi d ' /t / I s' ` x _ r rf m a I `:SIT PLAN �T �. A PLUS ACA IMY SCAi„=2�' [i” FOR Rl�E:�il�.".r.. o�J;.Y 2/27 lil"N 99 #101 EDMONDS A 95026 F._