Loading...
bld20100549-Puckett-1.pdf City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check :Date: #BLD20100549 August 27, 2010 Project Name/Address: Puckett Addition 844 Daley St Contact Person/Address/Fax: Ron McNurlen 206-412-4138___ mcnurlen@comcast.net Reviewer: JoAnne ZulaufDivision:Engineering All Handouts and Standard Details referred to in these comments can be accessed at our website: www.ci.edmonds.wa.us by clicking City Government / City Department / Public Works / Engineering Division: During the pre-review gathering of documentation for review of the subject submittal, it was found that a significant amount of impervious surface in the form of an enlarged gravel driveway, gravel and paver walkway and patio on Daley, gravel walkway west of house, gravel area along fence and garage along alley and walkways etc in backyard were not included on the site plan or the impervious surface calculations.Therefore, the Engineering Division is unable to perform a complete review. all Please review Engineering Stormwater Handout E72, complete worksheet including impervious surfaces. Definitions and charts available in handout to aid in identification of types of impervious surface. Include completed worksheet with your resubmission. Use the information in E72 handout and the Stormwater Supplement to determine the stormwater requirements for the site classification. A separate drainage plan is required if project is classified as a Small Site. Classification specific handouts are not available at this time but all information and requirements can be found in the Stormwater Supplement as follows; Chapter 4 – Large Sites, Chapter 5 – Small Sites, and Chapter 6 – Minor Sites. The Stormwater Handout E72 and the Stormwater Supplement can be accessed on the city website – see details at top of page. Include all required documentation and plans addressing all SSMR’s for your project’s classification to ensure a full Engineering Division review of your resubmittal. Add and label all other structures on site plan i.e. fence etc. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 8/27/2010 PAGE ___ OF __ 11