BLD20100612.pdfSTATUS: ISSUED 10/21/2010
Expiration Date: 10/21
Parcel No: 00582000300500
CITY OF EDMONDS
121 5TH AVENUE NORTH - EDMONDS,WA 98020
PHONE: (425) 771-0220 - FAX: (425) 771-0221
Permit #: ,B:L0201;00`612`
DAVID PEDERSEN AL COHEN, ARCHITECT HOMEOWNER
1074 3RD AVE S 330 DAYTON ST #6
EDMONDS, WA 98020-4109 EDMONDS, WA 98020-
(206)919-9865 Ext. (425)776-7373 Ext. ( ) - Ext.
LICENSE #: EXP:
to] Hill
NEW FOYER ADDITION ON 1ST FLOOR, 112 SQ. FT. NEW COVERED DECK, 32 SQ. FT., NEW DECK 165 SQ. FT. NEW
BASEMENT LEVEL STORAGE ROOM 112 SQ. FT. RELOCATEGAS METER
ED
VALUATION: $18,724 6 P L.
PERMIT TYPE: Residential
PERMIT GROUP: 02 - Addition
GRADING: N CYDS: 0
TYPE OF CONSTRUCTION:
RETAINING WALL ROCKERY: N
OCCUPANT GROUP:
OCCUPANT LOAD:
FENCE: N ( 0 X 0 FT.)
CODE: 09
OTHER: N ------- OTHER DESC:
ZONE: RS -6
NUMBER OF STORIES: 0
VESTED DATE:
NUMBER OF DWELLING UNITS: 0
LOT #:
BASEMENT: 0 I ST FLOOR: 0 2ND FLOOR: 0
BASEMENT: 0 I ST FLOOR: 0 2ND FLOOR: 0
3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
13RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
',EQUIRED:20 PROPOSED: REQUIRED:5 PROPOSED: REQUIRED: 20 PROPOSED:
(EIGHT ALLOWED:25 PROPOSED:21 REQUIRED: 5 PROPOSED:
ETBACK NOTES: Corner lot, street setbacks from 3rd Ave Sand SR 104.
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOINGTHE WORK AUTHORIZED
THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATINGTO
WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. °
I PLICATION ISNOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/WR D PUTY AND ALL FEESARE PAID.
Signature Print NariTe Date Veasdd By Date
ATTENTION
ITIS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF
OCCUPANCY HAS BEEN GRANTED, UBC109/ IBCI 10/ IRCI 10.
ONLINE APPLICANT ` ASSESSOR OTHER
2e�ecue��o�Z �'D ,/ m Pc- q/(8/(3
STATUS: ISSUED
BLD20100612
• Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of
the building or structure. Check the job card for all required City inspections including final project approval and final
occupancy inspections.
• Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from
adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing
fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable.
Approval ofany plat or plan containing provisions which do not comply with city code and for which a variance has not been
specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision
of city code or state law does not approve any items not to code specification.
• Sound/Noise originating fromtemporary construction sites as a result of construction activity are exempt fromthe noise limits
of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding.
Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the
noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
• Applicant, on behalfof his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold
harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to
modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
• Maintain erosion & sedimentation control per city standards.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE
PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION.
PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6)
BURMING (425) 771-0220 EXT. 1333 1 ENGINEERING (425) 771-0220 EXT. 1326 1 FIRE (425) 775-7720
PUBLIC WORKS 425 771-0235 1 PRE-TREATMENT (425)672-5755 1 RECYCLING 425 275-4801
When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being
requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon.
• E Erosion Control/Mobilization
• E -Storm Catch Basins x2
• EInfiltration System x2
• E•Engineering Final
• B -Footings
• B -Foundation Wall
• B -Foundation Drainage
• B -Isolated Footings/Piers
• B -First Floor Framing
• B -Gas Test/Pipe
• B -Exterior Sheathing
• B -Shear Nailing
• B -Framing
• B-WallInsulation/Caulk
• B -Floor Insulation/Caulk
• B -Ceiling Insulation/Caulk
• B-Sheetrock Nail
• B -Building Final
• E•Tightline Drain Connection
Inspection
Comments
BLD20100612
02 - Addition
P E R WrTRA X
Applied: 08/30/2010
Issued: 10/21/2010
Expires:
10/21/2013
Address: 1074 3RD AVE S, EDMONDS
!INSPECTION
DATE
INSPECTOR
ACTION
1001 - E-Erosion Control/Mobilization
07/22/2011
MCCONNELL
PAR
Comment: TESC adequate at this time.
1001 - E-Erosion Control/Mobilization
10/31/2013
ZULAUF
CMP
Comment: ok at final
1013 - E-Storm Catch Basins x 2
10/31/2013
ZULAUF
CMP
Comment: mudded, ok to final
1016 - E-Infiltration System x 2
05/03/2012
ZULAUF
CMP
Comment: Ok to bury infiltration trenches.
Trenches were constructed with 24" storage instead of 12" as originally
proposed. Garage will be connected
to this location and driveway
area will connect to a rain garden.
Trenches proposed to west of house are no longer necessary.
1077 - E-Engineering Final
05/15/2014
ZULAUF
CMP
Comment: ok to final
1108 - B-Footings
07/11/2011
LAWLER
CMP
Comment:
1110 - B-Foundation Wall
07/20/2011
STEINIKE
CMP
Comment:
1122 - B-First Floor Framing
06/20/2012
LAWLER
CMP
Comment:
1132 - B-Exterior Sheathing
05/25/2012
LAWLER
CMP
Comment:
1136 - B-Shear Nailing
05/25/2012
LAWLER
CMP
. Comment:
1142 - B-Framing
05/25/2012
LAWLER
CMP
Comment:
1144 - B-Wall Insulation/Caulk
06/15/2012
LAWLER
CMP
Comment:
1146 - B-Floor Insulation/Caulk
06/15/2012
LAWLER
CMP
Comment:
1148 - B-Ceiling Insulation/Caulk
06/15/2012
LAWLER
CMP
Comment:
1150 - B-Sheetrock Nail
06/20/2012
LAWLER
CMP
Comment:
1168,- B-Building Final
11/04/2013
LAWLER
CMP
Comment: Pending engineering
5/21/2014 11:26:45 AM IPage 1 of 1
l
nC
OzMz
OG)T^
v
Pam
:J, g 0 CD
r.
RM O to
n
9 '
o
S °\ am
V1-171111
m
s���
"-II
III L
VJ
Q
P
os y• 'q co Q 0.
r
§ I
P
I CD
m
m \
rn
I Q-
W
yy
�
I
rn
mp
I
..
Z
9 '
o
S °\ am
m
s���
i
X
Q
P
os y• 'q co Q 0.
��M
§ I
P
m
P
W
yy
i X
a
i
mp
1
..
P
y
Z
'_
I
i(
Ix
-PO
A
D m
u
O
AM�
g
'u
p
m
MIm
L
A
m
X
—
3 m
I �•
58t
CO)
l
iXh
W P
W
G,
�u
W d
y
p
Cpl
�p1 �1(qui
P
p�
m A
U
A
IY
o
D
z
F
m
F
Z
NQiPT71
1m
a
_
y
A
9 '
o
S °\ am
ro
m
s���
i
X
Q
P
os y• 'q co Q 0.
P
P
i X
mp
1
P
sIR
P
Z
ro
x J, --
A 3N Pq
N ''II
C -f �M
• o ��.,e a- ,r � C P
r`
� � 5496 GEGISTENEO
J ALBERT H. COHEN PIMIGN COMPANY.. PEDERSEN REvorMN E ABCMECT
O 990 DAYTON STREET SUITE & EDMONDS, WA 40070
O y O1014 - 9rd AVE. SOUTH EDMOND9 WA 98020 STATEQF WASNWGTp
M.BMT NITON GONEN. AR WELT TFL/F— (425) no --19•n ooa.EwasexHCE.warw�norx m.o.uawrxomuowEPnaoucnaonusEnv.a�artnuovworecreoervmcwu uw
m
X
f
os y• 'q co Q 0.
'_
I
i(
Ix
-PO
I
m
X
—
3 m
I �•
58t
CO)
WAr -
p
o—
z
,
m
F
1m
a
_
y
A
x J, --
A 3N Pq
N ''II
C -f �M
• o ��.,e a- ,r � C P
r`
� � 5496 GEGISTENEO
J ALBERT H. COHEN PIMIGN COMPANY.. PEDERSEN REvorMN E ABCMECT
O 990 DAYTON STREET SUITE & EDMONDS, WA 40070
O y O1014 - 9rd AVE. SOUTH EDMOND9 WA 98020 STATEQF WASNWGTp
M.BMT NITON GONEN. AR WELT TFL/F— (425) no --19•n ooa.EwasexHCE.warw�norx m.o.uawrxomuowEPnaoucnaonusEnv.a�artnuovworecreoervmcwu uw
I
b
r
P
g� v
�oi (D
rn �, c�
m
IND 0
Ff1m Co V/ C T 9' 1 f g .
z CD
rn
2 ECD
Ate.°°,' f q•�. $' Sa
ti ZC.
nHA
dt rn rn�R
Cf)
fillA
m 4811 —I � > .z, � � � �
V' w S2/-b, \ �C _ O J 2 111 N
0.
1 J W \ �Nt4 t
u�
CID
Z I .� J I m N T
r --- r x
vl /
�4oJ
F� tlhl;l Int
pennit approval process shall be `✓
ry ® interpreteds allowing or pennitting the n-73
t 9 ��, L mainteaaanc:u of any currently existing illegal,
q 0
vonconfomidn or un i , g 3 G+ Qr
X g permitted building, struce
A= �, ar site condition which is outside the scope of tNC d.
® a, A n permit application, regardless of whether such
_ bciildin
® �'� �, g g, structure or condition is shown on the A
(j a,
site plan or drawing, Such building, structure or E ao th
m r;c,rZ�+ition may be the subject of a separate m
® d' �° 6aforcement action." v s
fz
� �96 HEGIGTEHED
ALBERT H. GOHEN PIMIGN *ANY— PEDER5EN RESIDENCE
• 990 DAYTON 5TR.Fff SITE 6 EDMON09, VIA 960]0
= 10'I4 - Brd AVE SOUTH MDMONDS WA 90020 AIBERT H. rAMEN
Q Q N O ALBERT HILTON WHEN. ARGHrtEGT TEL/PAN 14151 Tib-1919 6TATE OE WASNWGTON
DDGINFNI Of 6ENVICE CDVYPoGOOAHL AID UN.WLIIDPoIEDPFPoIDDIIDIIONDR UEEIS PNM9IED.WDRiDTEC1ED BY ffDERLL1AW