Loading...
bld20100646-email-Traffic Control Plan.htm MessagePage of ?? From: McConnell, Jeanie Sent: Wednesday, February 16, 2011 8:16 AM To: 'Zach' Cc: bill@craftarchitects.com; Brian Valliant Subject: RE: Traffic Control Plans WA FED Edmonds ? Good morning Zach, Thank you for submitting the traffic control plan for the WA Federal project. Please revise as follows: 1) Please include the haul route on the traffic control plan 2) "Shoulder Closure" signage does not seem to be appropriate in the subject area as the street section is limited to parking lanes and travel lanes. Road work ahead signage may provide sufficient warning, especially since 3rd & Main is a signalized intersection. 3) The scope of work for the WA Fed project includes installation/replacement of storm main on Main Street from 3rd Ave to 2nd Ave. In addition, the driveway approach on Main Street at the alley will be replaced and will therefore require alley closure for a very short period of time. Please include a traffic control plan that addresses all phases of work and states notification to the Police Dept. and Fire Dept. is required 72hrs in advance of alley closure. 4) Please incorporate "End Road Work" signage into the traffic control plan. 5) How long do you anticipate sidewalk and parking closures during sidewalk and storm main construction? Closure in excess of 72hrs requires payment of additional disruption fees. I am available all week to discuss this further or to review a resubmittal. Thank you, Jeanie -----Original Message----- From: Zach \[mailto:zbull@bakerconstruct.com\] Sent: Wednesday, February 02, 2011 1:27 PM To: McConnell, Jeanie Cc: bill@craftarchitects.com; Brian Valliant Subject: Traffic Control Plans WA FED Edmonds ? Jeanie, My name is Zachary Bull with Baker Construction. We are the general contractor who was awarded the Washington Federal Edmonds project. Attached are two different traffic control plans. One for the demo & site work & the other for the concrete sidewalks / curb work that will be done along Third Street & Main. Please feel free to call me with any questions or if anything else is needed of us regarding the traffic control plans. Thank you file:///C:/Users/cockrum/AppData/Local/Temp/bld20100646emailTraffic%20Control%2...7/10/2017 ?? MessagePage of ?? file:///C:/Users/cockrum/AppData/Local/Temp/bld20100646emailTraffic%20Control%2...7/10/2017 ??