Loading...
bld20100646-WA_Fed-E2.pdfCITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www,cJ.cdinorids,wa,i.is DATE: December 7, 2010 TO: Bill Arens bill@cral'tarchitects.com FROM: Jeanie McConnell, Engineering Program Manager RE: Application 4: bld20100646 Project: WA Federal Savings Bank Project Address: 229 Main Street During review of the above noted application, it was fow-id that the following inforn-tation, corrections, or clarifications are needed. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below toTheresa Umba-Ligh. City of Edmonds handouts, standard details, and development code can be referenced on the City website. Review I — October 12, 2010 Review 2 — Decern ber 7, 2010 NE .I 1 12/7/10 — A performance bond, in the amount of $117,657.60, shall be submittcd prior to permit issuance. 10/12/10 comment - Please provide an itemized cost estimate, including units and unit prices, for both on-site and off-site (right-of-way) improvements, including traffic control. • A separate breakdown shall be provided for the curb and gutter improvements along the frontage of the Post Office. If this worl< is not completed by the Post Office within 2 -years after final acceptance of the WA Federal project, WA Federal will be required to provide permanent restoration of the frontage, • A bond is required to be placed for all right-of-way improvements. The amount of the bond will be based on 120% of the City approved estimate for all right-of-way improvements, The City will inform you of the appropriate bond amount after review of the cost estimate. Bond forms can be obtained from Marie Harrison, Permit Coordinator — 425-771-0220 or. Harrisonn q.6,edmonds.wa.us • Inspection fees for this project will be calculated at 2.2% of the 120% City approved estimate for all improvements. 2. 12/7/10 — response letter states traffic control plan will he submitted by contractor prior to, permit issuance. b1d20100646-WA Fed -E2 Paoo I of 5 t, 10/12/10 comment -Please submit a traffic control for review and approval. Individual plans shall be provided for all elements of work to be completed. 3. 12/7/10 — response letter states haul route plan will be submitted by contractor prior to permit issuance. 10/12/10 - Submit a haul route plan for review and approval. The haul route should run from SR -104 to Dayton Street, to 3`a Ave and back out the same way. Construction vehicles are not to access the site from Main Street. 4. ok 5. ok 6. ok 7. ok AIA - SITE PLAN 1. ok 2. ok 3. ok 4. ok 5. 12/7/10 — Access easement area to east side of alley near Main Street should be shown on this site plan. The easement will need to be recorded prior to final of the building permit. L -t — LANDSCAPE PLAN 1. ok 2. ok L-2 — IRRIGATION PLAN 1. ok 2. ok 3. 12/7/10 — An "X" is shown through some of the irrigation notes (assumed to be a drafting issue) — please remove. STORM DRAINAGE REPORT 1. ok 2. ok 3. ok 4. ok Sheet C04 - ok Sheet C06 - ok COI - SITE PLAN 1. ok 2. 12/7/10 —Thank you for including the table in the plan set. The impervious surface calculations, however, do not seem to match that shown in the drainage report. Please revise accordingly. Page 2 of 5 10/12/10 corriment - Please clarify impervious surface calculations and incorporate the following table (also found in handout E72) into the Dlan sheet. 3. 4, 5. 6. 7. 9, 9. CO2 — GRADING & TESC PLAN 1. 2. 3. 4. 5. 6. T ole 12/7/10 — Thank you for showing the chain link fencing. Please refer to note 45 below for additional clarification to this comment. 10/12/10 comment - Show the location of chain link construction fencing, if any, to be provided around the site during construction. ole ole 12/7/10 — A filter fence has been added to block access to the alley from within the site. A chain link fence was also added at the intersection of the alley anti Main Street, but this point of access should remain open for the majority of the construction project. Closing the alley may be appropriate, with proper approvals, during portions of construction but does not appear to be necessary for the entire project. I apologize for any confusion in my cornment of 10/12/10. The plans can be redlined to reflect the alley will remain open. 10/12/10 comment - As construction vehicle access is to be limited to 3 d Ave, orange barrier fence or chain link fence should block access off the alley. Please revise plans accordingly. ole ole ole ok. ok ole ole ole: Page 3 of 5 7. ok 8. 1217110 - The cross section provided shows the alley sloping entirely to the east side. The existing topo contours indicate an inverted crown. Please clarify and ensure storm water flows will be directed to the catch basin in Main Street. 10/12/10 comment - Please provide a cross section of the alley, showing cross slope and grind/taper and overlay specifications. Has any coordination with the Post Office Development occurred? 9. ok 10. 12/7110 - Thank you for adding the corner planters as requested and the detail on sheet C07. Please see notes below (under C07) regarding the detail. 10/12/10 comment - Corner planter bulb -outs will be required at the intersection of 3`d & Main. A schematic and photos of what this might look like have been attached to the last page of these plan comments. 11. ok 12. ok C04 - DRAINAGE PLAN 1. ok 2. ok 3. ok 4. ok 5. ok 6. ok 7. ok 8. ok 9. ok 10. ok 11. ok 12. ok 13. 12/07/10 - Please show the access riser to be installed within the 651f of detention pipe. C05 -- UTILITY PLAN 1. ok 2. ok 3. ok 4. ok 5. ok 6. ok 7. ok C06 - PROPILES & DETAILS 1. ok 2. ok 3. ok 4. ok Page 4 of 5 5. ok 6. ok 007 ­ PROFILES & DETAILS 1. ok 2. ok 3. 12/7/10 -- Thank you for revising the detail. Please include pertinent construction details, such as slope, wings, etc. to ensure ADA compliance. I have attached details that were provided via e-mail back in August as a reference. 10/12/10 comment - Revise ADA i'anip detail to show location of existing signal light pole, actual limits of the sidewalk and cornea plantef bulb -outs. C08 — ],),E,TAILS 3 1. ok 2. ok 3. ok Please contact me at 425-771-0220 or by e-mail. at if you have specific questions regarding these plan corrections. Page 5 of 5 1 fm --- P4 00 43 .69 z i "Al 11"T -- (5 1,)" 1�. '; U�i N r --y - /ckol vI 0 0 8.3% A 4,376 0 4 � < 71V Perteet Inc. T7425-252-7700 11-800-615-9900 2707 Colby Avenue, Suite 900 Everett, Washington 98201 - -- 8.01FWING (MIN) 8.3% MAX CONSTRUCTION NOTES: C) INSTALL DETECTABLE WARNING STRIP. I SCALE: 1"=10' 1J, m fm --- P4 00 43 .69 z i "Al 11"T -- (5 1,)" 1�. '; U�i N r --y - /ckol vI 0 0 8.3% A 4,376 0 4 � < 71V Perteet Inc. T7425-252-7700 11-800-615-9900 2707 Colby Avenue, Suite 900 Everett, Washington 98201 - -- 8.01FWING (MIN) 8.3% MAX CONSTRUCTION NOTES: C) INSTALL DETECTABLE WARNING STRIP. I SCALE: 1"=10' U +00 � V � - f 1 �Inr 111 f r 1 C \ \ f r sL1 II t _ t, r 1 �y ?11 42.30 1111 to�,., I + f ; 42.63 c) i �i V 1tti 1\"a f tla f Y ? Yi F' CONSTRUCTION % 1`�`` I INSTALL DETECTABLE WARNING STRIP RAMP FLUSH TO STREET GLITTER. I I f� y r h1 � 8.3°lo SLOPE MAX. l C) i U9 CONSTRUCTION NOTESD 4 1 INSTALL DETECTABLE WARNING STRIP. I BUSINESS i � I CFN TER I ar I i 2 CROSS SLOPE AT 4'X4' MIN. LMDING DNA 1574-73 rlAU"K IN LEAD N 299198, 190 E 1260,342-98-1 43zL 44. Q9 �A t' ID A Y' Y', Pq ),� 1 Oct ,�� 1+29,01 ff 7V, PerteetInc_ EDMONDS ADA RAMP DESIGN 426-252-7700 11-800-615-9900 NE CORNER 3RD & DAYTON IT7 2707 Colby Avenue, Suite 900 Everett, Washington 98201 SCALE 1"=1 D' OLJ e 43. �A t' ID A Y' Y', Pq ),� 1 Oct ,�� 1+29,01 ff 7V, PerteetInc_ EDMONDS ADA RAMP DESIGN 426-252-7700 11-800-615-9900 NE CORNER 3RD & DAYTON IT7 2707 Colby Avenue, Suite 900 Everett, Washington 98201 SCALE 1"=1 D'