Loading...
BLD20100647.pdfSTATUS: ISSUED 2/24/2011 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS,WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 Expiration Date: 8/25/2011 Parcel No: 00434400700100 Address:. 229 MAIN ST, EDM( �o;z�'YO WNEA APPLICANT 0N'I' LkC'I'*; WASHINGTON FEDERAL BANK CRAFT ARCHITECTS BAKER CONSTRUCTION 425 PIKE ST 2505 3RD AVE, SUITE 324 2711 EAST SPRAGUE ST SEATTLE, WA 98101- SEATTLE, WA 98121- SPOKANE, WA 99202- ( ) - Ext. (206) 720-7001 Ext. (509) 535-3133 Ext. LOT #: BASEMENT: 0 1ST FLOOR: 0 2ND FLOOR: 0 LICENSE #: BAKERCD066CZ EXPA/8/2012 DEMO 2389SF EXISTING BANK BUILDING VALUATION: $0 Comp'l ETED PERMIT TYPE: Commercial PERMIT GROUP: 23 - Demolition GRADING: N CYDS: 0 TYPE OF CONSTRUCTION: RETAINING WALL ROCKERY: N OCCUPANT GROUP: OCCUPANT LOAD: FENCE: N ( 0 X 0 FT.) CODE: OTHER: N ------- OTHER DESC: ZONE: NUMBER OF STORIES: 0 VESTED DATE: NUMBER OF DWELLING UNITS: 0 LOT #: BASEMENT: 0 1ST FLOOR: 0 2ND FLOOR: 0 1 BASEMENT: 0 1ST FLOOR: 0 2ND FLOOR: 0 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 13RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 FRONTSETBACK t .EQUIRED: PROPOSED: REQUIRED: PROPOSED: REQUIRED: PROPOSED: (EIGHT ALLOWED:O PROPOSED:O REQUIRED: PROPOSED: ETBACK NOTES: I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. HIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER,pEPUTY AND ALL FEES ARE PAID. MW.Ws Signature Print Name By Date ATTENTION ITIS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109/ IBCI 10/ IRCI 10. = ONLINE = APPLICANT = ASSESSOR EXOTHER - I STATUS: ISSUED BLD20100647 • *Pre -inspection required. *Street to be cleaned of debris. *Side sewer must be capped at property line. * Water Service must be disconnected from Water meter and or hose bib with AVB installed. *Dump at approved dump site only. *See demolition inspection checklist on back of job card for inspection requirements. • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision ofcity code or state law does not approve any items not to code specification. • Sound/Noise originating fromtemporary construction sites as a result of construction activity are exempt fromthe noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other tires the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents fromany and all claims for damages of whatever nature, arising directly or indirectly fromthe issuance for this permit. Issuance ofthis permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. INSPECTIONS THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) 771-0220 EXT. 1326 PUBLIC WORKS 425) 771-0235 1 PR&TREATMENI (425)672-5755 1. RECYCLING (425) 275 4801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested Contact Name and Phone Number, Date Prefereed and whether you prefer morning or afternoon. • E -Pre -Demolition Sewer Cap B -Pre -Demo Water Sery Discnct/AVB • E -Pre -Demo Erosion Control • E -Engineering Final Demo • B -Pre -Demolition • B -Asbestos PSCAA Permit • B -Cleaned Site/Bid Final Demolition 49 6. 1,006117 , - ,ee ra� Inspection Comments BLD20100647 23 - Demolition PERMITTRAX Applied: 09/10/2010 Issued: 02/24/2011 Expires: 08/25/2011 Address: 229 MAIN ST, EDMONDS INSPECTION DATE ' 1 NSPECTOR -- - .. _ ....- _. 1078 - E -Pre -Demolition Sewer Cap 03/01/2011 ZULAUF CMP Comment: sewer capped, also capped parallel pipe: not sure if it is active or what it is. 1079 - E -Pre -Demo Water Sery Discnct/AVB 03/01/2011 ZULAUF CMP Comment: AVB installed on sprinkler line. water disconnected at meter. 1080 - E -Pre -Demo Erosion Control 03/01/2011 ZULAUF CMP Comment: Erosion control installed. Will add waddles along west side of lot if runoff does not make it to catch basin. 1081 - E -Engineering Final Demo 08/19/2011 LAMBERTJ CMP Comment: Final Approved 1104 - B -Cleaned Site/Bid Final Demolition 08/25/2011 LAWLER CMP Comment: 8/29/2011 8:50:20 AM Page 1 of 1