BLD20100654 PERMIT DOCSlu
IIII��III
oV E�o��
CITY OF EDMONDS
121 5TH AVENUE NORTH - EDMONDS, WA 98020
PHONE: (425) 771-0220 - FAX: (425) 771-0221
STATUS: ISSUED 10/10/2011
Expiration Date: 10/10/2012
Parcel No: 00576700001410
.4
O'REILLY AUTO PARTS CM ARCHITECTS G M NORTHRUP CORPORATION
SHIOMI INVESTMENTS LLC JESSICA IVERSON 15950 Franklin Trail Se
9001 NE 37TH PL 219 N 2ND ST, SUITE 301 Prior Lake, MN 55372
BELLEVUE, WA 98004- MINNEAPOLIS, MN 55401-
(612)547-1374 (952)226-3091
LICENSE #: GMNORC*033MM EXP:12/4/2011
NEW AUTO PARTS STORE
VALUATION: $787,500.00
PERMIT TYPE: Commercial
PERMIT GROUP: 45 - New Commercial
GRADING: N CYDS: 762
TYPE OF CONSTRUCTION: VB
RETAINING WALL ROCKERY: N
OCCUPANT GROUP: M
OCCUPANT LOAD: 122
FENCE: N 0 X 0 FT.
CODE: 2009
OTHER: N ----- OTHER DESC:
ZONE:
NUMBER OF STORIES: 0
VESTED DATE:
NUMBER OF DWELLING UNITS: 0
LOT #:
BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0
BASEMENT: 0 1 ST FLOOR: 7500 2ND FLOOR: 0
3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
FRONT SETBACK
ZE UIRED: PROPOSED: I RE MIRED: PROPOSED: RE UIRED: PROPOSED:
3EIGHT ALLOWED:O PROPOSED:O I REQUIRED: PROPOSED:
SETBACK NOTES:
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO
PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S
COMPENSATION INSURANCE AND RCW 18:27.
LIS14PLICATION IS,IV//OT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUT)(4AND ALL FEES ARE PAID,
Released
ATTENTION
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF
OCCUPANCY HAS BEEN GRANTED. UBC109/ IBCI 10/ IRCI 10.
ONLINE APPLICANT ASSESSORow
OTHER
STATUS: ISSUED
• Plumbing, Mechanical and gas piping are included in this permit.
• Separate Permit Required For: Signage, Side Sewer, Right of Way
• Light poles in parking lot cannot be taller than 25 feet.
• SPECIAL INSPECTIONS ARE REQUIRED FOR THE FOLLOWING:
• Excavation, Grading, and Site Preparation
• Placement of Structural Fill and Compaction
• Soil Bearing Verification
• Foundation Drainage Installation
BLD20100654
• Concrete Construction, Including Reinforcement
• Concrete Anchor Installation
• Structural Steel Fabrication and Erection, Including High -Strength Bolting Prior to Final Inspection by the
Building Division, Final Special Inspection Reports are Required From All Special Inspectors.
• Submit Special Inspection Field reports on a weekly basis to the City Building Department.
• Lot line stakes must be in place at the time of foundation/setback inspection.
• All new, extended, re -built or relocated electrical utility and/or service shall be placed underground.
• Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309
• *Pre -inspection required.
• *Street to be cleaned of debris.
• *Side sewer must be capped at property line.
• *Water Service must be disconnected from Water meter and or hose bib with AVB installed.
• *Dump at approved dump site only.
• *See demolition inspection checklist on back of job card for inspection requirements.
• Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of
the building or structure. Check the job card for all required City inspections including final project approval and final
occupancy inspections.
• Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from
adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing
fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable.
• Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been
specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision
of city code or state law does not approve any items not to code specification.
• Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits
of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays,
excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must
comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
• Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold
harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to
modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any
ordinance provision.
• Refer to City of Edmonds Water service line handout for approved pipe materials, inspections and other requirements.
• 48 hours notice is required when requesting your FINAL Engineering Inspection. 425-771-0220, ext.1326.
• Maintain erosion & sedimentation control per city standards.
• Maintain 10"""" separation between the sanitary side sewer and the water service line.
• Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is
caused by or occurs during the permitted project.
• Owner/Contractor to provide Water Service Line asbuilt at final inspection. See City Standards for requirements.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE
•
•
PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION.
PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6)
BUILDING (425) 771-0220 EXT. 1333 1 ENGINEERING (425) 771-0220 EXT. 1326 1 FIRE (425) 775-7720 1
PUBLIC WORKS 425) 771-0235 1 PRE-TREATMENT 425) 672-5755 1 RECYCLING 425 275-4801
When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection
being requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon.
• E -Pre -Con
• E -Erosion Control/Mobilization
• E -Storm Tightline
• E -Storm Detention System
• E -Parking Lot Signs
• E -Footing Drain Connection
• E -Footing Drain TL Conveyance
• E -Water Service Purity, >2"
• E -Water Service Line
• E -Double Check Detector Assem Vault
• E -Fire Hydrant Install/Thrust Block
• E -Fire Hydrant Pavement Marking
• E -Access Slope & Width Verification
• E -Pavement Subgrade
• E -Pavement Compaction Test Report
• E -Pavement Striping
• B -Retaining Wall Forms/Location
• E -Retaining Wall Drainage
• E -Fence Location/Height
• E-Fire/Aid Address Sign
• E -Trash Enclosure
• E -Hydrant Storz Adaptor
• E -Engineering Final
B -P reconstruction meeting
• B -Setbacks
• B -Footings
• B -Foundation Wall
• B -Isolated Footings/Piers
• B -Retaining Wall
• B -Slab Insulation
• B -Plumb Ground Work
• B -Plumb Rough In
• B -Gas Test/Pipe
• B-Equipment-Mech
• B -Exterior Sheathing
• B -Exterior Gypsum Sheathing
• B -Ceiling Grid
• B -Height Verification
• B -Framing
• B -Wall Insulation/Caulk
• B -Ceiling Insulation/Caulk
• B-Sheetrock Nail
• B -Building Final
• F -Extinguishers
• F -Fire Dept Inspection
• F -Addressing Visibility
• F -Fire Final
• P -Planning Final
•
SOV EDV Inspection Comments
BLD20100654 45 - New Commercial
Applied: 09/13/2010 Issued: 10/10/2011
Expires: 10/10/2012
Address: 23005 HIGHWAY 99, EDMONDS
;INSPECTION DATE
INSPECTOR
ACTION.
1000 - E -Pre -Con 10/19/2011
ZULAUF
CMP
Comment: Done. See attached Pre -Con Meeting notes.
1001 - E -Erosion Control/Mobilization 10/18/2011
ZULAUF
COM
Comment: tesc measures installed
1001 - E -Erosion Control/Mobilization 11/03/2011
ZULAUF
COM
Comment: tesc ok
1001 - E -Erosion Control/Mobilization 11/15/2011
MCCONNELL
COM
Comment: Need to refresh rock entrance, too much dirt on Hwy 99.
Need to fully compact trench and sidewalk patch on 230th.
Clear storm flow line.
1001 - E -Erosion Control/Mobilization 11/16/2011
ZULAUF
COR
Comment: No corrections made to rock entrance and 230th.
See CN
1001 - E -Erosion Control/Mobilization 11/17/2011
ZULAUF
COR
Comment: Stop Work and NOV issued. No corrections had been made to the erosion and sediment control
issues.
1001 - E -Erosion Control/Mobilization 11/18/2011
SIBREL
COM
Comment: tesc ok-see pics in address file
1001 - E -Erosion Control/Mobilization 11/30/2011
ZULAUF
COM
Comment: tesc ok
1001 - E -Erosion Control/Mobilization 12/05/2011
ZULAUF
COM
Comment: tesc ok
1001 - E -Erosion Control/Mobilization 12/30/2011
ZULAUF
COM
Comment: tesc ok
1001 - E -Erosion Control/Mobilization 02/16/2012
ZULAUF
CMP
Comment: ok to final
1013 - E -Storm Tightline 11/30/2011
ZULAUF
PAR
Comment: tightline installed along back wall ok to backfill
1013 - E -Storm Tightline 02/06/2012
ZULAUF
CMP
Comment: tightline from building to connection to detention system.
1014 - On Site Storm Conveyance 12/01/2011
ZULAUF
PAR
Comment: partial storm connected to detention.
1014 - On Site Storm Conveyance 12/02/2011
MCCONNELL
PAR
Comment: Partial, see plans.
3/12/2012 12:55:13 PM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220
Page 1 of 5
INSPECTION
DATE
INSPECTOR
ACTION
1014 - On Site Storm Conveyance
12/02/2011
SIBREL
PAR
Comment: Partial -see plans
1014 - On Site Storm Conveyance
12/05/2011
ZULAUF
CMP
Comment: partial, see plans
1015 - E -Storm Detention System
11/15/2011
MCCONNELL
PAR
Comment: Partial - okay to backfill 96" CMP detention
pipe. (2) 7/8" orifcices
verified on control
tee.
1015 - E -Storm Detention System
11/17/2011
ZULAUF
CMP
Comment: connect to manhole at property line
1016 - E -Parking Lot Signs
09/26/2011
ZULAUF
COM
Comment: Signs required on building stating "No Work On Vehicles"
1016 - E -Parking Lot Signs
02/16/2012
ZULAUF
CMP
Comment: done
1017 - E -Footing Drain Connection
11/30/2011
ZULAUF
CMP
Comment: connected at building and connected to storm
line after detention outfall.
1032 - E -Water Service Purity, >2"
02/07/2012
ZULAUF
CMP
Comment: Linda says not needed.
1034 - E -Water Service Line
12/02/2011
MCCONNELL
PAR
Comment: Partial, ok to backfill. Not connected at building.
1034 - E -Water Service Line
12/05/2011
ZULAUF
CMP
Comment: connection at building ok to b/f
1036 - E -Double Check Detector Assem Vault
02/07/2012
ZULAUF
CMP
Comment: installed
1041 - E -Fire Hydrant Install/Thrust Block
12/12/2011
ZULAUF
COM
Comment: Tapped City Main, swabbed pipe, pinned thrust block installed.
1041 - E -Fire Hydrant Install/Thrust Block
02/17/2012
ZULAUF
CMP
Comment: ok to final
1043 - E -Fire Hydrant Pavement Marking
02/17/2012
ZULAUF
CMP
Comment: PW's will install during other related work
1048 - E -Access Slope & Width Verification
12/28/2011
ZULAUF
CMP
Comment: slope/width ok
1049 - E -Pavement Subgrade
02/17/2012
ZULAUF
CMP
Comment: ok
1050 - E -Pavement Compaction Test Report
02/17/2012
ZULAUF
CMP
Comment: received testing reports
1051 - E -Pavement Striping
02/17/2012
ZULAUF
CMP
Comment: done
1059 - E -Fence Location/Height
02/17/2012
ZULAUF
CMP
Comment: ok-no change
3/12/2012 12:55:13 PM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 2 of 5
• 0
INSPECTION
DATE
INSPECTOR
ACTION
1060 - E-Fire/Aid Address Sign
02/17/2012
ZULAUF
CMP
Comment: installed
to pour
1110 - B -Foundation Wall
1075 - E -Trash Enclosure
02/08/2012
ZULAUF
COM
Comment: Need to put metal sleeves in pin holes.
1110 - B -Foundation Wall
1075 - E -Trash Enclosure
02/17/2012
ZULAUF
CMP
Comment: Pins installed-ok to final
1112 - B -Foundation Drainage
1076 - E -Hydrant Storz Adaptor
02/07/2012
ZULAUF
CMP
Comment: installed
1114 - B -Isolated Footings/Piers
1077 - E -Engineering Final
09/26/2011
ZULAUF
COM
Comment: Add Final Sidewalk and Street Disruption Fees Prior to Sign Off.
1077 - E -Engineering Final
02/17/2012
ZULAUF
CMP
Comment: ok to final.
1101 - B-Preconstruction meeting
10/10/2011
LAWLER
CMP
Comment:
1106 - B -Setbacks
02/16/2012
LAWLER
CMP
Comment: Per survey
1108 - B -Footings
11/15/2011
STEINIKE
PAR
Comment: Subject to min. Clearance and special inspector approval.
North and east side only.
1108 - B -Footings
11/16/2011
LAWLER
CMP
Comment: a few embeds left to be checked by special inspector, then okay
to pour
1110 - B -Foundation Wall
11/22/2011
STEINIKE
PAR
Comment: Ok pending special inspection reports .
1110 - B -Foundation Wall
12/06/2011
LAWLER
CMP
Comment:
1112 - B -Foundation Drainage
11/28/2011
LAWLER
CMP
Comment:
1114 - B -Isolated Footings/Piers
11/18/2011
LAWLER
CMP
Comment:
1118 - B -Slab Insulation
12/06/2011
LAWLER
CMP
Comment:
1120 - B -Plumb Ground Work
12/01/2011
LAWLER
CMP
Comment:
1122 - B -Duct Sealing & Support
02/06/2012
LAWLER
PAR
Comment: Above ceiling at public mercantile area
1122 - B -Duct Sealing & Support
02/16/2012
LAWLER
CMP
Comment:
3/12/2012 12:55:13 PM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 3 of 5
0
0
INSPECTION
DATE
INSPECTOR
ACTION
1126 - B -Plumb Rough In
02/03/2012
LAWLER
PAR
Comment: All rough in plumbing approved except overhead
line to SE hose bib
1126 - B -Plumb Rough In
02/10/2012
LAWLER
CMP
Comment:
1128 - B -Gas Test/Pipe
02/10/2012
LAWLER
CMP
Comment:
1130 - B-Equipment-Mech
02/16/2012
LAWLER
PAR
Comment: Pending commissioning report
1130 - B-Equipment-Mech
02/23/2012
LAWLER
CMP
Comment:
1132 - B -Exterior Sheathing
02/10/2012
LAWLER
CMP
Comment:
1134 - B -Exterior Gypsum Sheathing
02/10/2012
LAWLER
CMP
Comment:
1138 - B -Ceiling Grid
02/10/2012
LAWLER
CMP
Comment:
1142 - B -Framing
01/30/2012
LAWLER
PAR
Comment: Preliminary interior partition and soffit
1142 - B -Framing
02/10/2012
LAWLER
CMP
Comment:
1144 - B -Wall Insulation/Caulk
02/10/2012
LAWLER
CMP
Comment:
1148 - B -Ceiling Insulation/Caulk
02/10/2012
LAWLER
CMP
Comment:
1150 - B-Sheetrock Nail
02/10/2012
LAWLER
CMP
Comment:
1152 - B -Plumbing Final
02/16/2012
LAWLER
CMP
Comment:
1156 - B -Mechanical Final
02/23/2012
LAWLER
CMP
Comment:
1158 - B -Building Final
02/17/2012
LAWLER
COR
Comment: Obtain planning final approval.
Special inspection for shelving
Commissioning/balance report
1158 - B -Building Final
02/27/2012
LAWLER
CMP
Comment:
1955 - F -Extinguishers
02/24/2012
WESTFALL
CMP
Comment:
3/12/2012 12:55:13 PM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 4 of 5
INSPECTION
_ DATE
INSPECTOR
ACTION
1975 - F -Fire Dept Inspection
02/24/2012
WESTFALL
CMP
Comment:
1980 - F -Addressing Visibility
02/24/2012
WESTFALL
CMP
Comment:
1985 - F -Fire Final
02/24/2012
WESTFALL
CMP
Comment:
2000 - P -Planning Final
02/27/2012
LIEN
CMP
Comment: Landscaping and building is per ADB approval. Approved by
planning.
3000 - E -Project Asbuilts
02/17/2012
ZULAUF
CMP
Comment: received
3/12/2012 12:55:13 PM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 5 of 5
Ot EDpj
•`�� SPECIALINSPECTION' AND TESTING AC12EEll�IENT
r✓ --
U
i Permit #: lblo - adro A D Project: tt.:l.�
Prior to issuance of a per milt, thus form itiust be completed -ill. its entirety and rettavied to the Cily for
approval: The completed font: mast have signatures of aamoipled'gatent. 6}► an parties.
DUTIES AND M, PONSIBILITIES
,goetial losneetion Firtn.and Snectil Ina»octors:
Tlie Speciatinspection firm o€'F(�n t;L'S51WAt' - fmyiCE w gQM0S I A/C' will perform special
inspection fos the fallowing types of work (separate forms must be submitted if more. than one. firm Is to be
employed):
XReinforced Concrete
0 BolEing in:Concrete
❑ Prestressed Concrete
Q S11ot6iete
Cl Structural masonry
. Structural Steel/Welding
High Strength Bolting
O Spray applied Fireproofing
❑ Smoke Control Systems
❑ Lateral Wood
a StructurfilObservation
X 3tadinglsoils
❑ Other
❑ Other ... . -
All -individual inspectors to be employed on this project will be, WABO certified for the ,type of work they are to
inspect. - lf'inspection is for work that is not obvered by the WABO categories, or the inspector is not WABO
certifirKd, tt detailed resume oi~ifle inspector and fiiriia mi}st,be sitbmitteli. Tile resuale aYitrst dhow that:the
inspector and the firm are qualified by education arid. experience to perform the work and testing required by the
project design and specifications.
The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions
and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection
records shall include:
A daily record to be maintained on site, itemizing the inspections perfottned. Any nonconforming work
shall be brought to the immediate attention of 'the contractor for resvlixtioil.
A weekly report shall lie submitted to the City; detailing the inspections and testing performed, listing
any nonconfotming work and resolutign of nonconforming iteans.
A final report shall be submitter! to Elie building department. prior to the ! ertificate` of Occupancy being
issued, This report will indicate that inspeotion and testing was completed in conformance with the
approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must
be detailed in the final report.
C.LUserslji.versor\Appt)stallzmlWicrosotilWindo%rs�Tenipomry xnte 4 FileslContent.Outlool MKNRDFMpeciel rminspection
ib.doc7/2i/201i.
AUG '- 9 2011
DEVELC N �F EDMONDSECTR-
Contractor:
The contractor shall provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plan and specifications must be made available, at the jobsite for the use of the special
inspector and the City inspector, The contractor shall maintain all daily inspection reports, on site, for review by
all parties.
The special inspection functions are considered to be in addition to the normal inspections performed by the City
and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be
poured or other work covered unti l approval is given by the City inspector. +
Building Department;
The building department shall review any revisions and addenda. The City inspector will monitor the special
inspection functions for compliance with the agreement and the approved plans. The City inspector shall be
responsible for approving "various stages of construction to be covered and for work to proceed.
Design Prof
essiouoIs:
The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special
inspection required. and shall include a schedule for inspection and testing. The arcbitect and/or engineer will
coordinate their revision and addenda process in such a way as to insure that all required City approvals are
obtained, prior to work shown on the revisions being perfiormed in the field.
O, caner:
The project owner, or the architect or engineer acting'as the owners agent, shall employ the special inspector or
agency.
ENFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of the fBC, the approved
plans and this document, may. void this agreement and the Building Official's approval of the special inspector.
In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the
design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK
notice being.posted on the project until nonconforming items have been resolved.
AC104ONVLEDGMENTS
1 have read and agree to comply with the terms and conditions of this agreement.
Owner: +� r���GL Y 1<n�� ,eF,vn..SrY Signature Date'1 /
Contractor: U•�1�+✓ - Signature Date'fA271l
Arch./Eng-,l�C.ii 6�.i'- _Date:
Si store
Special Insp, Le Date:
ACCEPTED FOR THE CITY OF EDMONDS BUILDING DEPT -
By: Date:
C;1Usenljiveison%AppData\LocoPMimosoelwindoi"kTemporary tntcmd pitcs\Content.outiookkQQ)o4RDF8lspeciaf inspection
f6rm.doa7al/2011
Contractor:
The contractor shall provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plan and specifications must be made available, at the jobsite for the use of the special
inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by
all parties.
The special inspection functions are considered to be in addition to the normal inspections performed by the City
and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be
poured or other work covered until approval is given by the City inspector.
Building Department:
The building department shall review any revisions and addenda. The City inspector will monitor the special
inspection functions for compliance with the agreement and the approved plans. The City inspector shall be
responsible for approving various stages of construction to be covered and for work to proceed.
Design Prg& gionsls:
The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special
inspection required. and shall include it schedule for inspection and testing. The arobitect and/or engineer will
coordinate their revision and addenda process in such a way as to insure that all required City approvals are
obtained, prior to work shown on the revisions being performed in the field.
Owner:
The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or
agency.
ENFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved
pians and this document, may void this agreement and the Building Official's approval of the special inspector.
1n such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the
design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK
notice being posted on the project until nonconforming items have been resolved.
ACKNOWLEDGMENTS
I have read and agree to comply with the terms and conditions of this agreement.
Owner: 0 TbiL 4-"41P6Vn Trver Signature
,Z:;i c.
Contractor: Signature
Date 1 /
Date:
DateA/11----
1�5�
Special Insp. Signatur
ACCEPTED FOR THE CITY OF EDMONDS BUILDING DEPT.
By:
Date:
C:1UsersljiversonlAppDatalLocallMicrosofAWindmvs%Temporary In1cmet Files%Content.outlooklQQKNRDPO Special inspection
form.doc7al 2011
1�1
STATEMENT OF SPECIAL INSPECTIONS
THE OWNER SHALL EMPLOY ONE OR MORE SPECIAL IN5PECTOR5 TO PROVIDE IN5PECTION5 DURING CONSTRUCTION. THE
IN5PECTION5 - REQUIRED IN ACCORDANCE W/ THE 2006 IBC, 5ECTION 1704 - ARE SUMMARIZED BELOW.
THE SPECIAL INSPECTION AGENCY SHALL SUBMIT A SCOPE OF SERVICES FOR APPROVAL PRIOR TO COMMENCING
CON5TRUCTION. NO CON5TRUCTION 5HALL COMMENCE ON THE STRUCTURE UNTIL TH15 DOCUMENT HA5 BEEN APPROVED IN
WRITING BY THE 5TRUCTURAL ENGINEER OF RECORD. IN ADDITION, THE SPECIAL IN5PECTION AGENCY SHALL SUBMIT
QUALIFICATIONS OF EACH SPECIAL INSPECTOR THAT WILL BE PERFORMING THE WORK. THE SPECIAL IN5PECTOR SHALL SUBMIT
IN5PECTION REPORT5 TO THE STRUCTURAL ENGINEER OF RECORD DURING CON5TRUCTION FOR VERIFICATION, INCLUDING A
FINAL REPORT IN ACCORDANCE WITH 5ECTION 1 704.1 .2 OF THE 2006 IBC.
THE SPECIAL INSPECTOR SHALL U5E THE LATE5T 155UE OF THE 5TRUCTURAL RECORD DRAWING5 FOR THE INSPECTION OF THE
STRUCTURE. DO NOT U5E THE SHOP DRAWING5 FOR IN5PECTION PURP05E5.
THE FOLLOWING L15T IDENTIFIES THE 5ECTION5 OF THE IBC CODE WHICH APPLY TO THI5 PROJECT. THE SPECIAL IN5PECTOR
5HALL ILLUSTRATE THEIR UNDER5TANDING OF THE SPECIAL IN5PECTION REQUIREMENTS BY IDENTIFYING APPLICABLE ITEM5
WITHIN EACH SECTION OF THEIR 5UBMITTAL.
TABLE 1704.3 REQUIRED VERIFICATION AND INSPECTION OF STEEL CONSTRUCTION
REFERENCED
IBC
YE
VERIFICATION AND IN5PECTION
CONTINUOUS
PERIODIC
STANDARD
REFERENCE
5
NO
N.A.
1 . Material verification of hi h-stren th bolts, nuts, and washers:
a. Identification markings to conform to A5TM
A5TM, A15C
standards specified in the approved contract
X
360, 5ection
X
documents.
A3.3
b. Manufacturer's certificate of compliance
required.
X
-
X
2. Inspection of hi h-stren th boltm :
a. Bearing -type connections.
A15C 360,
X
Section M2.5
1704.3.3
X
b. 5hp Critical Connections.
A15C 360,
X
X
5ection M2.5
1704.3.3
X
3. Material verification of structural steel:
a. Identification markings to conform to A5TM
standards specified in the approved contract
-
-
ASTM A 6 or
1708.4
X
documents.
A5TM A 568
b. Manufacturers' certified mill test reports.
A5TM A 6 or
-
A5TM A 568
1708.4
X
4. Material verification of weld filler materials:
a. Identification markings to conform to AWS
standards specified in the approved contract
_
_
A15C 360,
X
documents.
Section M2.5
b. Manufacturer's certificate of compliance
required.
X
5. Inspection of welding:
a: Structural 5teel
1) Complete and partial penetration
X - AW5 D 1. 1 1 704.3.1 X
groove welds.
2) Muti- ass fillet welds X - AW5 D 1 .1 1 704.3.1 X ,
3) Sin le pass fillet welds > 5/1 G" X - AWS D I . 1 1 704.3.1 X
4) Sin le pass fillet welds <= 5/1 6" - AWS D 1. 1 1 704.3.1 X
5) Floor and roof deck welds - X I AWS D 1 .3 1 X
G. Inspection of steel frame joint details for coin Nance with approved construction documents:
a. Details such as bracinq and stjffenin . X - 1 704.3.2 X
b. Member locations. X 1 704.3.2 X
c. Application of Joint details at each
X - 1704.3.2 1 X
connection.
STATEMENT OF SPECIAL INSPECTIONS
THE OWNER SHALL EMPLOY ONE OR MORE SPECIAL INSPECTORS TO PROVIDE INSPECTIONS DURING CONSTRUCTION. THE
INSPECTIONS - REQUIRED IN ACCORDANCE W/ THE 2000 IBC, SECTION 1704 - ARE SUMMARIZED BELOW.
THE SPECIAL INSPECTION AGENCY SHALL SUBMIT A SCOPE OF SERVICES FOR APPROVAL PRIOR TO COMMENCING
CONSTRUCTION. NO CONSTRUCTION SHALL COMMENCE ON THE STRUCTURE UNTIL THI5 DOCUMENT HAS BEEN APPROVED IN
WRITING BY THE STRUCTURAL ENGINEER OF RECORD. IN ADDITION, THE SPECIAL INSPECTION AGENCY SHALL SUBMIT
QUALIFICATIONS OF EACH SPECIAL INSPECTOR THAT WILL BE PERFORMING THE WORK. THE SPECIAL INSPECTOR SHALL SUBMIT
INSPECTION REPORTS TO THE STRUCTURAL ENGINEER OF RECORD DURING CONSTRUCTION FOR VERIFICATION, INCLUDING A
FINAL REPORT IN ACCORDANCE WITH SECTION 1704.1 .2 OF THE 2006 IBC.
THE SPECIAL INSPECTOR SHALL USE THE LATEST I55UE OF THE STRUCTURAL RECORD DRAWINGS FOR THE INSPECTION OF THE
STRUCTURE. DO NOT USE THE SHOP DRAWINGS FOR INSPECTION PURPOSES.
THE FOLLOWING L15T IDENTIFIES THE SECTIONS OF THE IBC CODE WHICH APPLY TO THI5 PROJECT. THE SPECIAL INSPECTOR
SHALL ILLUSTRATE THEIR UNDERSTANDING OF THE SPECIAL INSPECTION REQUIREMENTS BY IDENTIFYING APPLICABLE ITEMS
WITHIN EACH SECTION OF THEIR SUBMITTAL.
TABLE 1704.4 REQUIRED VERIFICATION AND IN5PECTION OF CONCRETE CONSTRUCTION
VERIFICATION AND INSPECTION
CONTINUOUS
PERIODIC
REFERENCED
IBC
YES
NO
N.A.
STANDARD
REFERENCE
I . Inspection of reinforcing steel, including
ACI 315: 3.5,
restressm tendons, and placement.
-
X
7.1-7.7
1913.4
X
2. Inspection of reinforcing steel weldmg in
AW5 D 1.4
accordance with Table 1704.3, Item 5b.
ACI
-
X
318:3.5.2
3. Inspect bolts to be installed in concrete
prior to and durmg placement of concrete
X
-
-
191 1.5
X
where allowable loads have been increased.
4. Verifying use of required design mix.
1904.2.2,
X
ACI 38: Ch.
4.5 . 2-5.4
1X
11913.3
5. At the time fresh concrete is sampled to
A5TM C 172
fabricate specimens for strength tests,
A5TM C 31
1913.10
perform slump, and air content tests, and
X
ACI 318: 5.6,
X
determine the temperature of the concrete.
5.8
G. Inspection of concrete and shotcrete
placement for proper application techniques.
1913.6,
Exclusions:
X
_
ACI 31$: 5.9-
1913.7,
X
Isolated concrete spread footings
5.10
1913.8
Slab -on- rade
7. Inspection for maintenance of specified
ACI 3 18:
curing temperature and techniques.
X
5.1 1-5.13
19 13.9
X
8. Inspection of prestressed concrete:
a. Application of prestressing forces.
ACI 31 8:
X
. 18:20
X
b. Grouting of bonded prestressmg tendons
ACI 3 18:
in the seismic-force-resistin s tem.
X
18. 18.4
X
9. Erection of precast concrete members.
ACI 318: Ch.
X
IG
-
X
10. Verification of m -situ concrete strength,
prior to stressmg of tendons in post -
tensioned concrete and prior to removal of
X
ACI 3 18: G.2
-
X
shores and forms from beams and structural
slabs.
I I . Inspect formwork for shape, location and
dimensions of the concrete member being
-
X
ACI3 18:
X
formed.
6. I . I
W
��__Rii Information
LI�ToBuiIdn
���•�• Tesffiw
o
February 15, 2012
City of Edmonds
Building Division
121 – 5 Avenue North – 2"d Floor
Edmonds, Washington 98020
RE: Permit No.
RECEIVED
F eR 15 2012
DEVELOPMENT SERVICES
COUNTER
We have completed the requested special inspections on the subject project. All work
requiring special inspection was, to the best of this agency's knowledge, inspected and
reported as specified on permit documents.
Project Name: O'Reilly Auto Parts Store
Project Address 23005 State Route 99
Permit No.
We have completed the requested special inspections on the subject project. All work
requiring special inspection was, to the best of this agency's knowledge, inspected and
reported as specified on permit documents.
• Reinforced Concrete
• Compaction Testing of Soils
• H.S.S. Bolts
• Foundation sub -grade
If there are any questions regarding this change please contact PSI at (425) 248-2400.
Sincerely,
r,JXL—
Daniel
Kuhn
Branch/Project Manager