Loading...
BLD20100675_ReillyLin-SFR-2nd.pdf CITY OF EDMONDS th 121 5 Avenue North, Edmonds WA 98020 Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT • PLANNING DIVISION December 16, 2010 Sergiy Volosevych Morning Star New Construction, Inc. 18339 S Redland Rd Oregon City, OR 97045 Subject: SECOND Planning Division comments for file BLD20100675 (Reilly/Lin SFR) Greetings, anew single family residence Thank you for submitting a building permit application for at 7041 Meadowdale Beach RoadRS-20 in the zone. I have reviewed the above building permit application for the Planning Division and it was found that the following information, corrections, or clarifications will need to be addressed (in writing) before the Planning Division review can continue. 1.Geotechnical Report / Special Inspections: The geotechnical report provided by Earth Solutions NW requires observations by their geotechnical engineers through several phases of the home building process, notably: excavation, soils analysis, slope stabilization, and during the retaining wall excavation and construction (pages 4, 5, 6, and 8 of report file ES- 1845). Please work with our Building Department if you have any questions about the Special Inspections form that I am attaching that all parties of interest will need to sign. 2.SEPA: Please confirm grading calculations and show these figures both on the grading plan AND on the SEPA Checklist (page 5, question B.1.e). Please list cut and fill figures separately including the source of the fill. I cannot issue the SEPA determination until these figures are provided, because that is the purpose of the checklist – the State Environmental Policy Act (WAC-197-11-800) requires this information. Please provide exact amounts so that an estimate can be provided – if you end up grading more than is stated, this process will need to be re-done. Please review the attached DRAFT Environmental Checklist, review each question thoroughly, as well as our combined answers, and provide additional information as necessary (for example, see page 11, question B.6.a – what kinds of energy is the project proposing?). Please provide any changes to these questions, in writing. Page 1 of 2 3.Grading/ESC Plan: Kindly indicate the topography (contour lines) on the Grading / Erosion / Sediment Control Plan (none shown, and this is important so that we can confirm the grading calculations that you will need to provide). Please show topographic contours and note “original” grade, “existing” grade (note if different than “original” grade), and “proposed” grade. 4.Native Vegetation: Per our conversation, I’m confident that you plan to retain at least 30% of the native vegetation on site pursuant to ECDC 23.90.040.C – please understand that I will redline your site plan to indicate the 30% native vegetation requirement if you fail to update the maps during the next submittal. 5.Height: Thank you for removing the chimney to meet the height limit as well as updating the height rectangle to include the second story bump out. Again, please be aware that the Building Division will require you to hire a surveyor to verify the height of the proposed structure. Please take a moment to confirm that the building proposed is indeed under 25- feet in height as measured from top of ridge to average original grade. Please understand there is no “wiggle room” in the code. Please confirm that the height calculations are taken from the “original” grade (show/label “original” grade and “proposed” grade contours on the site plan – the lines provided are unclear) and label contours on the site plan appropriately. Please submit a written response to the above, along with any revised plans to your Permit Coordinator:Linda Thornquist . All code citations can be found at: www.ci.edmonds.wa.us. If you have any questions, please do not hesitate to contact me. I look forward to working with you on this project. Sincerely, ŭźƓğĭƚĭĭźğʹʹğƭƭƚĭźğƷĻƦƌğƓƓĻƩ City of Edmonds Development Services Department th 121 5 Avenue North, Edmonds WA 98020 425.771.0220 x 1778 | coccia@ci.edmonds.wa.us cc: BLD20100675 enc: DRAFT Environmental Checklist Special Inspections Form Page 2 of 2