Loading...
bld20100718 - TIA.pdfCity of Edmonds -'rraffic Impact Analysis Workshee,t Owner/Applicant E)VF,,2 cwor_,�7c4e�w, Name WI -7 A ME Street/Mailing Address F -D AV �JV� 6NO2D City State Zip Telephone: Applicant Contact Person.-, Name rXStreet/Mailing Address ED, qMD City State zip Telephone: 4 �fi, -114 - -7 1,?1 p Traffic Engineer who prepared the Traffic Impact Analysis (if applicable) - Firm Name Contact Name Telephone: E-mail: . ... ............ . ... ...............Vit...... ,.. .... ... .................... .. a. Location - Street address: 1151 5 "_ 4A Al f— t� - Attach as vicinit), inap and site plan.) b. Specify existing land use: Z1- . cpftc� c. Specify proposed type and size of development: (IF -67 2 0 DA I Q - P I / T1�4 of residential units andlorsq u (ire fbotage of'builefing) , I q -5 Revised on 6124110 E82- Trafjic Impact llnalvsis lflorkslw Pati V 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82,120, except as other -wise provided for independent fee calculations in ECDC 18.82.130. CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance: 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. ITE Land Use Category . .. ...... .... Units in Per Unit square feet, Fee Rate of dwellim W W i PriorUseFee: $11?'o,r)l Units in ITE Land Use Category Per Unit square feet, Fee Rate of dwelling, VfP, etc. New Use $ X OTHER '4,e.... .... I , I MITIGATION FEE RECOMMENDATIOM $ INDEPENDENT FEE CALCULATION.- $200.00 t- consultant feeL $ TOTAL TRAFFIC I MPACTFE t 0 City of Edmonds, Engineering Division Approval Date 'No impact fees will be cine, eior ~viii a credit be given, FOT an impact fee calculation resulting iii a net negative. Revised oij 0124110 E82 - TniIii Impact Analvsis Worksheet Page 5 of'5 R N -Dt It