BLD20100757.pdfIIII�lIII OV E o,t,oti CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 STATUS: ISSUED 7/15/2011 Expiration Date: 7/15/2012 Parcel No: 00937900000700 CLEARWATER HOMES PO BOX 432 MARYSVILLE, WA 98270- (425) 422-2535 Ext. NEW SINGLE FAMILY RESIDENCE VALUATION: $241,961.60 _ Project Address: 22806 96TH'PL'W9,; CLEARWATER HOMES MURPHY BUILDING CO. 6203 202ND ST SW LYNNWOOD, WA 98036- ( ) - Ext. (425) 775-3388 Ext. LICENSE #: MURPHBCI 13K3 EXP:5/22/2012 PERMIT TYPE: Residential PERMIT GROUP: 64 - Single Family Residence New GRADING: Y CYDS: 50 TYPE OF CONSTRUCTION: VB RETAINING WALL ROCKERY: N OCCUPANT GROUP: R3 OCCUPANT LOAD: FENCE: N ( 0 X 0 FT.) CODE: 09 OTHER: N ---- OTHER DESC: ZONE: RS -8 NUMBER OF STORIES: 0 VESTED DATE: NUMBER OF DWELLING UNITS: I LOT #: BASEMENT: 0 1ST FLOOR: 0 2ND FLOOR: 0 BASEMENT: 0 1ST FLOOR: 877 2ND FLOOR: 1331 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 13RD FLOOR: 0 GARAGE: 386 DECK: 73 OTHER: 0 IRONTSETRACK SIDE, SETBACK REAR SETBA(:K REQUIRED: 25 PROPOSED: 25 RE UIRED:7.5 PROPOSED: 10 1 REQUIRED: 15 PROPOSED: 43 HEIGHT ALLOWED:25 PROPOSED:23.16 I REQUIRED: 7.5 PROPOSED: 1 I SETBACK NOTES: Setbacks: N, E. W, S MDNS issued with Plat. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. T-JUAPPKATJ@N IS IPOT A PERMIT UNTIL SIGNED BY THE BUILDING FFI AL OR HIS/HER DEP Y AN ALL FEES ARE PAID. gnature Print Nbrile Date Rele ed By Date ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109/ IBC 110/ IRC 110. ONLINE APPLICANT ASSESSOR EOTHER Jzw r., STATUS: ISSUED BLD20100757 • Asbuilt showing all utilities shall be provided prior to project final. • REQUIRED SPECIAL INSPECTIONS FOR THIS PROJECT: • 1) Excavation, grading, & site preparation • 2) Soil bearing verification • 3) Placement of fill & compaction • 4) Footing drain • 5) Temporary Erosion Control • 6) Final Erosion Control • 7) Site retaining wall/ rockery construction. • 8) General site monitoring • 9) Final letter from geotechnical engineer of record • 10)Rain Garden soils. • Lot line stakes must be in place at the time of foundation/setback inspection. • All new, extended, re -built or relocated electrical utility and/or service shall be placed underground. • Installer shall provide the manufacturer ""s installation, operating instructions, and a whole house ventilation system operation description. A label shall be affixed to the whole house timer control that reads "Whole House Ventilation" (see operating instructions). • Special inspections have been called for on this project and are noted on the approved construction plans and building permit. It is the owner and/or contractors responsibility to assure that reports are provided to the City on a weekly basis. Be advised -- if special inspection reports are not forthcoming, the Building Official may issue a "Stop Work" and no City inspections will be provided until such time as the reporting agency has complied and reports are reviewed and approved by the City. • Hose Bibbs (exterior faucets) are required to have a permanently affixed anti -siphon device installed. • In addition to the required pressure/relief valve, an approved listed expansion tank shall be installed on all hot water tanks. Per UPC 608. • Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309 • Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted. • Submit all special inspection reports to the City Building Inspector on a weekly basis. • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Provide combustion air per IMC Chapter 7 for commercial and multi -family residential installations, and IRC Chapter 17 for one and two-family dwellings. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the water shutoff. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. • Contact Olympic View Water and Sewer District for water service from main to meter and meter installation. • 48 hours notice is required when requesting your FINAL Engineering Inspection. 425-771-0220, ext. 1326. • Installation, use and maintenance of equipment and components shall be per manufacturer's specifications, installation instructions, and applicable state codes. Provide manufacture's installation instructions on site for Building Inspector. • New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible from the street or road fronting the property. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be legible from the public way, at least 4 inches high with a %: inch min. stroke width on a contrasting background. • Obtain a separate permit from Olympic View Water and Sewer District for Sanitary Side Sewer. • Call for locates of underground utilities prior to any excavation. • Maintain erosion & sedimentation control per city standards. • Maintain 10' separation between the sanitary side sewer and the water service line. • Contact Olympic View Water and Sewer District for approval to reuse lateral. • Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is caused by or occurs during the permitted project. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) CALL FOR INSPECTIONS BUILDING 425) 771-0220 EXT. 1333 1 ENGINEERING 425) 771-0220 EXT. 1326 FIRE (425) 775-7720 PUBLIC WORKS 425 771-0235 1 PRE-TREATMENT 425 672-5755 1 RECYCLING 425 275-4801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon. • E -Erosion Control/Mobilization • E -Storm Tightline • E-Tightline to Rain Garden • E -Rain Garden • E -Footing Drywell • E -Footing Drain TL Conveyance • E -Driveway Form & Slope Ver. • E -Engineering Final • B -Setbacks • B -Footings • B -Foundation Wall • B -Foundation Drainage • B -First Floor Framing • B -Plumb Rough In • B -Gas Test/Pipe • B -Mechanical Rough In • 13 -Exterior Sheathing • B -Roof Sheathing • B -Shear Nailing • B -Height Verification • B -Framing • B -Wall Insulation/Caulk • 13-Insulation/Energy • B-Sheetrock Nail • B -Building Final r r r � � I ,.O E U ,a ZLU =' d 8"o J m• ; C m Z • �J W' {.. Wm W z\' �� 0 j s C ZLLI I -- LU Z c x Q A m N d 0 y O Z i r s CURRENT AS-BUILT CONTOURS (TYP.) o IUMENTo 96th PL. W. ��>. A CENTER / .DESAC PER S �p0ti �D R W Y .T ENGINEERING / V. 385.58' / PRE-DEVELOPMENT CONTOURS (TYP.) �� .,� _:•.• ��' /25'8 /` d•, • 11 16,69 SCALE DRNEWAII • %� X \1 / / / 111 0 10 2 +4%',"' .'SLOPE...,!'.,• \ 1 1y. / 1/ - ------ - 67 G® 383. O' 8,658r LINE OF \ SLI E OFRU�TUR18"OLYMPICWATE�/ Ate• / ( /F� p/ VIEW z A / 0 NG/ Iw � ►AND SEWER DISTRICT' 1 o RESID NCE 'SANITARY SEWER ESMT. / FF MAJK ® 385.00' FIR�PLACi� 4' WIDE, DECK - i /18° DEEP 72 SF • / 34.00' / t / UTILITY EMENT _------ 1 APPROVED AS NOTED BY NG!`EE NG nate: ER/CONTRA(`TOA c �i0SI0N (.nnirD„l IS RE..PONSIBZE Ft7R 20' `4�age 2 �-FZ Oileflan) ADDRESS TAX PARCEL NO LEGAL DESCRIPTION: SITE AREA: LOT SLOPE NORTH—SOUTH HEIGIC-ILLATION A= 393 B= 387 C= 378 Of 382 1540/4= 385.00' AVERAGE GRADE= 385.00' ACTUAL BUILDING HEIGHT= 408.16' MAXIMUM BUILDING HEIGHT= 410.00' LOTLOT CAGE 22806 96TH PL W. MICROFILM 00937900000700 SECTION 36, TOWNSHIP 27, RANGE 3 NE QUARTER K. ELSIE BLK 000 D-00 LOT 7 A ^^w - 8,658 SQUARE FEET 385.00' — 360.00'= 25.00' 30.00 VERTICAL, FEET= 26.05 SLOPE 115.00 LINEAR 'FEET RESIDENCE 1,512 SQUARE FEET INC. COVERED PORCHES, GARAGE 1,512 SQUARE FEET TOTAL 359. MAXIMUM 1,512/8,658= 17.465 LOT COVERAGE IMPERVIOUS COVERAGE: Setbacks Front RESIDENCE 1,512 SQUARE FEET (including overhangs) Other DRIVEWAY 541 SQUARE FEET WALKWAY 30 SQUARE FEET 2,083 SQUARE FEET TOTAL zonegee °.._ Corner if Flag N Setbacks Front Re wired Actual .�--- t/1 Sides Rear L r Other Ha t CONTACT OLYMPIC VIEW RESUB WATER/SEWER DISTRICT JUL 4 5 2011 8U1 DING IN OR IDMONOSNT NOTE: T_ SEE GRADING/TESC AND DRAINAGE/UTILITY PLANS FOR MORE INFORMATION. SNOHMSH COUNTY N CLEARWAT J nFSIr,NFO BY: DATE: SCALE: I JOB NO.: S.ROSE 05 17/20111 "=20'1. 1 0"0525 SITE PLAN lop INSIGHT INGINSIRINo Co. P.O. BOX -1478 EVERETT, WA 98206 (425) 303-9363 (425) 303-9362 FAX INFG@INSIGHTENGNEERING.NET AREA (SQFT) T ortvar rooN-Exorrr � ! CED ]NE 2,083 L 2,083E1/4 SECTION36, T.27N, R.3E., W.M . CONTACT OLYMPIC VIEW RESUB WATER/SEWER DISTRICT JUL 4 5 2011 8U1 DING IN OR IDMONOSNT NOTE: T_ SEE GRADING/TESC AND DRAINAGE/UTILITY PLANS FOR MORE INFORMATION. SNOHMSH COUNTY N CLEARWAT J nFSIr,NFO BY: DATE: SCALE: I JOB NO.: S.ROSE 05 17/20111 "=20'1. 1 0"0525 SITE PLAN lop INSIGHT INGINSIRINo Co. P.O. BOX -1478 EVERETT, WA 98206 (425) 303-9363 (425) 303-9362 FAX INFG@INSIGHTENGNEERING.NET i• LIU & ASSOCIATES, INC. Geotechnical Engineering Mr. Bob Murphy Murphy Building Company 6203 – 202i° Street SW Lynnwood, WA 98036 Dear Mr. Murphy: Subject: Final Inspection Report Single -Family Residence 22806 – 96h Place W Edmonds, Washington L&A Job No. 11-012 Engineering Geology February 29, 2012 &t,iD Zola 07.57 Earth Science MAR - 8 2012 BUILDING DEPARTMENT CITY OF EDMONDS We have provided geotechnical inspection services for the construction of the subject residence. Items we have inspected include: 1) temporary erosion control with installation of silt fence on the downhill side of the .residence site, 2) cut bank stability evaluation; 3) footing bearing soil verification, 4) footing drain line installation, 5) _rain garden construction, and 6) final erosion control. Our Daily Field Reports documenting our inspections of the Above items are attached hereto for your review. Based on our observations, it is our opinion that the geotechnical construction work items listed above are completed in accordance with city approved plans and specifications, and is acceptable. Please contact us if you have questions. o�0 � /z- $ A_ 275 9' _ V!0 7/171 'e Attach.: Daily Field Reports 1 through 5 Yours very truly, INC. J. S. (khan) Liu, Ph.D., P.E. Consulting Geotechnical Engineer 19213 Kenlake Place NE • Kenmore, Washington 98028 Phone (425) 483-9134 • Fax (425) 486-2746 MICROFILM DAILY FIELD REPORT JobNo. a Rep. age e . LIU & ASSOC;IA"l E' S_ r.lNC. 11-012 J. Liu 1 of 1 1 E_a9knecnnva, ;hnglnceringtioology& EarthS;cnce Miles Time -On Site ate Day of Week _4za;4clmical T 30 11:55A 8/18/2011 Thur. 19213 Kenlake Place NT Travel Time (Hrs)Time Sife er Kenmore. Washington 98028 1 0.75 12;25P Sunny VOx#e Firson Site Firs Charged Visitors Pbone: (425) 483-9134 Fax: (425) 486-2746 1.25 prolect JogLocation Client Single -Family Residences - Lots 7 & 8 228xx - 96th Place west, Edmonds Murphy Building Co. General Contractor General Contractor Superintendent Received Unchecked By Murphy Building Co. Bob Murphy Earthwork Contractor Earthwork Contrector Supt- Received Checked By _At the request of Bob Murphy with Murphy Building Co., I come on site today to observe installation of temporary erosion control, evaluate stability of cut banks of building footprint -excavation, and verify footing bearing soil for the construction of the homes on the two subject lots. At the time of my site visit, silt fences have already, been erected on the downhill sides of the subject lots with rolls of hay wad placed at strategic locations to keep sediment from being trasnsported downhill by storm runoff. The bottom of the silt fence fabrics are anchored in trenches filled with washed gravel, Building footprint excavation and construction of footing foundations and basement walls of the two homes also have been completed. Vertical cut banks up to about 7 to 8 feet were observed along perimeters of building footprint excavation. The bottom of the building footprint excavation is cut into a light -gray fresh till soil of gravelly,_ silty, fine. sand deposit with occasional cobble. Groundwater has not been encountered by the excavation. A_steel T -bar manually pushed into the footing bearing fresh till soil along the edges of already poured footing foundations ran penetrate no more than an inch or two deep, indicating the footing bearing soil is very dense. It is my opinion that the footing bearing soil is capable of rendering an allowable bearing capacity of at least _3,000 psf. The vertical cut banks in till soil are all quite stable. It is my opinion that the cut banks will remain stable for the duration of construction of the homes, and that it will be safe for construction workers to access _ and worts in the footprint excavation area. J M" ,.XPLU3 71171 2O Copy o: p Continued 1) Bob Murphy/Murphy Building Co. 2) on Next 3) 4) Page DAILY FIELD REPORT LIU & ASSOCIATES, INC. Job No. 11-012 Field Rep. J. Liu 1 of 1 epW No. -2 Gttxeclurirnl Engineering, Enginaering Glop &c Earth Science 30 tnie n 11:45A ate 8/25/2011 ay of VVeeR Thur. 19213 Kenlake Place NTE Trdvel Time ( rs) me a er Kenmore, Washington 98028 1 0.75 12:15P Sunny Phone: (425) 483-9134 Fax_ (425) 486-2746 Vehicle HrS on 511e arg ors jHrS 1 Project o ion cuent Single -Family Residences - Lots 7 8 8 228xx - 98th Place West, Edmonds Murphy Building Co. General Contractor General ContractorSuperintenderx Received Unchecked By Murphy Building Co. Bob Murphy Earthwork Contractor Earthviork Contractor Supt. Received Checked By At the request of Bob Murphy with Murphy Building Co.. I come on today to observe installation of footing_ drains for the homes being constructed on the subject lots. At the time of my site visit., the footing drain lines of 4 -inch rigid perforated PVC pipes have mostly been laid along the perimeter foundations of the buildings,, exce t around the garage where footing drains are omitted. The geotechnical report for this project recommended that footing drain lines be wrapped in non -woven filter fabric socks and completely enclosed in clean 3/4 to 1-1/2 inch washed gravel or crushed rock. The footing _ drains are embedded in 3/8 to 1-1/2 inch washed gravel with a nonwoven filter fabric liner covering the top of the washed gravel fill. it is my opinion footing drains constructed in this manner are acceptable, too. The fitter fabric should keep soil from migrating into the drain lines and there is little chance that the finer gravel would plug _ up the holes in the PVC pipe walls. _ It is my opinion the footing drains are properly installed. AW V _- FAv - -- '1117 Copy o: p Continued 1) Bob Murphy/Murphy Building Co. 2) on Next 3) 4 Page DAILY FIELD REPORT Job No' a ep, ge o. 1. IU 8► ASSOCJIAI'ES, INC. 11-012 J. Liu 1 of 1 3 77F Eagineennr i'aa�,�n� n g [r iol i�'H.nith Sc.;cnc Mites time On Site Date eQ _Geaedm_ic�l �. 30 10:20A 11/11/2011ri. 19213 Kenlake Place NT rave rime ra time 011 s to ea ffi er Kenmore, Washington 911428 0.75 110t40A Cloud vehicle Hrs on Site His Charged VisitorS Phone: (42.5) 483-9134 Fax: (425) 486-2746 1 Project oca on Client Single -Family Residences - Lots 7 & 8 228xx - 98th Place West, Edmonds Murphy Building Co. General Contractor General Contractor Superintendent Received Unchecked By Murphy Building Co. Bob Murphy Eart work Contractor Earthwork Contractor Supt. Received Checked By At the request of Bob Murphy with Murphy. Building Co., I come on site today to observe the construction of the rain garden for the residences on the subject lots. A pit has been cut down about 2.5 to 3 feet below the existing grade for the rain garden pond. It is excavated Into a brown silty fine to medium sand with a trace to some gravel. It is my opinion that construction of the rain garden to date is according to the design plans and is acceptable. Copy o: ❑Continued 1) Bob Murphy/Murphy Building Co. 2) on Next 3) 4) Page DAILY FIELD REPORT Job o. FIM liep, page epon No. LIU & ASSOCIATES, INC. 11-012 J. Liu 1 of 1 4 _ (sciitcchnica{ h:r,gnacrin ngirv!Etg Grotty, (` Ewih Sciewe Mites me n e a e y o ee 30 9:15A 11/29/2011 Tues. 1921.3 Kenlake Place NE Travel lime ( rs)a to er Kenmore, Washingion 98028 0.75 9:35A Sunny Phone: (425) 483-9134 Fttx: (42-5) 486-2746 Vehicle HrS on Site Cnargea visitors imirs 1 PrOrect 55 Locawnyen Single -Family Residences - Lots 7 & 8 228xx - 96th Place West. Edmonds Murphy Building Co. General Contractor General Contractor Superintendent Received Unchecked By MurphX Building Co. Bob Murphy Earthv,otk Contractor Eerthwork Contractor Supt. Received Checked By At the request of Bob Murphy with Murphy Building Co., I come on site today to observe the construction of the rain garden for the residences on the subject lots. A precast concreter block wall about 2 to 3 feet tall has been constructed at north end of rain garden pond with a plastic pipe sticking out of this wall to carry stormwater of _ the residence into the rain garden. The bottom of the pond is -lined with a layer of modified soil (soil mixed with organics) about 18 inches thick. Water discharged into the pond or rain water catched by the pond has consolidated this layer of modified soil some what. The rain garden is yet to be planted. It is my opinion that construction of the fain garden to date is according to the design plans and is acceptable. Copy o: 0 Continued 1) Bob Murphy/Murphy Building Co- 2) on Next 3) 4) Page DAILY FIELD REPORT (� �. (� �.�-U & ASSOCJATES, INC. o o* 11-012 ep. J. Liu age 1 of 1 eW o. Gmtedmicat Erq*eaic� P&igkr.cnn.gCmoloU & Eanh Scianoe es Imo n e e May o Week --� _ 30 /2:35P 2/29/2012 Wed. 19213 Kcniake Place NE Travel Time-rre a We - her .Kenmore, Washington 98028 0.75 1 1:OOP Light Rain Vehicle Mrs on Site Crorged VisEr-s Phone: (425) 483-9134 :Fax: (425) 486-2746 lKrs 1 Project oca ion Client Single -Family Residence - Lot 7 22806 - 96th Place West, Edmonds Murphy Building Co. General Contractor General Contractor superintendent Received unchecked By Murphy Building Co. Bob Murphy Earthwork Contractor Earthwork Contractor Supt, Received Chocked By At -the request of Bob Murphy with Murphy Building Co., I come on site today to conduct a final inspection on permanent erosion control for the subject residence.. At the Ume of site visit, the unpaved ground within the residence site has all been landscaped and is either covered by lawn grass or by shredded bark. There are no signs of erosion within the site. It is my opinion that final erosion control for the site is now completed. - - -- _ - ---- - - 'tea?�Lj Copy to, ❑Continued 1) Bob Murphy/Murphy Building Co. 2) on Next 3) 4) Page °` f-��Inspection Comments U f BLD20100757 64 - Single Family Residence New Applied: 10/15/2010 Issued: 07/15/2011 Expires: 07/15/2012 Address: 22806 96TH PL W, EDMONDS INSPECTION DATE INSPECTOR ACTION 1001 - E -Erosion Control/Mobilization 08/02/2011 LAMBERTJ COR Comment: Went on - site and no TESC measures were in place. Will call when ready. 1001 - E -Erosion Control/Mobilization 12/13/2011 ZULAUF COM Comment: see attached correction notice. 1001 - E -Erosion Control/Mobilization 03/08/2012 SIBREL CMP Comment: Approved. 1013 - E -Storm Tightline 08/25/2011 ZULAUF COM Comment: partial ok to b/f 1013 - E -Storm Tightline 11/08/2011 LAMBERTJ PAR Comment: OK to backfill - not using n-12 - installed pvc cleanouts and bends 1013 - E -Storm Tightline 12/30/2011 LAMBERTJ COM Comment: J.Zulauf on site - instructed contractor to remove n-12 and install cleanouts or bends to lines - the storm water should be collected to approved stormwater management system 1013 - E -Storm Tightline 12/30/2011 ZULAUF CMP Comment: ok to b/f 1014 - E-Tightline to Rain Garden 11/07/2011 LAMBERTJ PAR Comment: J.Zulauf on site - OK to backfill line - need to verify connection 1014 - E-Tightline to Rain Garden 11/08/2011 LAMBERTJ CMP Comment: Verified Connection 1015 - E -Rain Garden Redesign 02/07/2012 ZULAUF COM Comment: ok-need to b/f new wall to final 1015 - E -Rain Garden Redesign 03/08/2012 SIBREL CMP Comment: Correction: backfill of raingarden wall not completed. 1016 - E -Rain Garden 12/30/2012 ZULAUF CMP Comment: ok to final 1018 - E -Footing Drywell 11/07/2011 LAMBERTJ CMP Comment: J.Zulauf on site - OK to backfill - verified connection to drywell 1019 - E -Footing Drain TL Conveyance 11/07/2011 LAMBERTJ CMP Comment: J.Zulauf on site - OK to backfill - verified connection to drywell 1044 - E -Driveway Form & Slope Ver. 03/08/2012 SIBREL CMP Comment: Approved. 1077 - E -Engineering Final 03/08/2012 SIBREL COR Comment: Raingarden retaining wall not backfilled. 3/19/2012 9:53:46 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 1 of 3 JINSPECTION DATE INSPECTOR ACTION 1077 - E -Engineering Final 03/09/2012 MCCONNELL COM Comment: Raingarden retaining wall still not backfilled. Sent email to Bob Murphy to inform us when it is. 1077 - E -Engineering Final 03/14/2012 SIBREL CMP Comment: OK to Final. Retaining wall backfilled. 1133 - B -Roof Sheathing 11/14/2011 1101 - B-Preconstruction meeting 07/28/2011 STEINIKE CMP Comment: 1136 - B -Shear Nailing 11/14/2011 1106 - B -Setbacks 08/10/2011 STEINIKE CMP Comment: 1140 - B -Height Verification 12/19/2011 1108 - B -Footings 08/10/2011 STEINIKE CMP Comment: 1142 - B -Framing 12/06/2011 1110 - B -Foundation Wall 08/18/2011 STEINIKE CMP Comment: 1144 - B -Wall Insulation/Caulk 12/14/2011 LAWLER 1112 - B -Foundation Drainage 08/25/2011 LAWLER COR Comment: see correction 1150 - B-Sheetrock Nail 12/16/2011 LAWLER 1112 - B -Foundation Drainage 08/26/2011 LAWLER CMP Comment: received geotech report, okay to sign inspection card next field trip to site 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 1122 - B -First Floor Framing 10/31/2011 STEINIKE CMP Comment: 1126 - B -Plumb Rough In 11/30/2011 LAWLER CMP Comment: 1128 - B -Gas Test/Pipe 12/02/2011 LAWLER CMP Comment: 1130 - B -Mechanical Rough In 12/06/2011 LAWLER CMP Comment: 1132 - 13 -Exterior Sheathing 11/14/2011 LAWLER CMP Comment: 1133 - B -Roof Sheathing 11/14/2011 LAWLER CMP Comment: 1136 - B -Shear Nailing 11/14/2011 LAWLER CMP Comment: 1140 - B -Height Verification 12/19/2011 LAWLER CMP Comment: 1142 - B -Framing 12/06/2011 LAWLER CMP Comment: Still need height verification, polyseal approved 1144 - B -Wall Insulation/Caulk 12/14/2011 LAWLER CMP Comment: 1150 - B-Sheetrock Nail 12/16/2011 LAWLER CMP Comment: 3/19/2012 9:53:46 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 2 of 3 INSPECTION DATE INSPECTOR ACTION 1158 - B-Building Final 03/09/2012 LAWLER COR Comment: Engineering final. Pipe drip pan (under water heater) to exterior 1158 - B -Building Final 03/14/2012 LAWLER Comment: CMP 3/19/2012 9:53:46 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 3 of 3