Loading...
bld20100758-Clearwater-1.pdf City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check :Date: #BLD20100758 November 16, 2010 th Project Name/Address: Clearwater SFR 22804 96 Pl W (Lot 8) Contact Person/Address/Fax: Tom Berg tomberg58@yahoo.com Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.ci.edmonds.wa.us by clicking City Government / City Department / Public Works / Engineering Division: Please Note: Building Handouts do not include updated Engineering Division Requirements. Refer to Engineering Handouts for all Engineering Requirements. Drainage plan will not be reviewed by the Stormwater Engineer as submitted. See comments under Stormwater Mitigation. General: 1. Reduced size site plan shall be 1:20 scale. 2. Please show bump out on plans. 3. Plat map calls out a 50’ of the east side of the property for a snoho trans easement. Please provide a copy of the City of Edmonds drainage easement noted. Is the drainage system private or public? 4. Is a retaining wall planned for this property? If so, please show on plans and note bottom of wall (bow) and top of wall (tow) elevations at each end and for every two feet of change. 5. Add note to plans: “Replacement is required of any plat improvements that are damaged during construction.” 6. Eaves are considered part of a structure, therefore eaves cannot hang over any City of Edmonds easement. Please provide copy of the easement along the west property line. 7. Show dimensions of structure, deck, driveway length and width at road and property line. DATE FAXED/E-MAILED 11/16/2010 PAGE ___ OF __ 14 8. Note on plan: “See Grading/TESC and Drainage/Utility Plans for more information.” Add similar information to the other plans to reference all. 9. Please add site address and tax id number to site plan information. Add the identifying plan information shown on the site plan to the grading/erosion plan and the drainage utility plan. 10. Please add a general notes section to the civils. Please refer to example provided with the comments for Lot 7. 11. Site plan shows the utilities in a different location than the Utility/Drainage plan. All plans must have consistent information. 12. Please identify “box” with dimension 11’0” shown on west side of garage. Grading/TESC: 1. Please include details of erosion control measures in plans consistant with City of Edmonds standard details. Also add note to plans “Additional Ecrosion Control Measures Consistent With City of Edmonds Standards Provided As Needed”. 2. Please change grading calcs from yards to cubic yards. 3. Please review minimum requirements of erosion control for the classification of the project. Add all minimum requirements to the civil general notes section. 4. Indicate area of disturbance. Outline on grading/tecs plan and label with square footage of the area. 5. Add note to plans: “All disturbed areas on and off site shall be compost amended to meet requirements of BMP T5.13 in the Stormwater Manual, Vol V, Chapter 5. Stormwater Mitigation :(same comments as provided with Lot 7) 1. The information listed below must be presented prior to the City evaluating the stormwater design for the project. Please review the Stormwater Handout E72 and the Stormwater Supplement, both available on our website. 2. The project needs to be classified per ECDC 18.30.50. Once classified, the report should describe how the project plans to comply with applicable minimum requirements (See Handout E72) 3. Please provide a completed copy of the Worksheet available in Handout E72. 4. Developing Lots 6, 7, and 8 as proposed will result in a total of 34,366 sf of impervious surface. The stormwater system constructed in 2001 was designed for an impervious surface total of 30,260 sf meeting the design flow rates of that time. The existing construction of the five lots (17,181 sf) and the cul de sac road and sidewalks (10,240 sf) equals 27,421 sf of impervious surface that is mitigation by the City approved system meeting the code requirements of 2001. The mitigation of runoff for the proposed impervious surface, 6945 sf, may be approached in several ways; DATE FAXED/E-MAILED 11/16/2010 PAGE ___ OF __ 24 a) Provide engineered calculations that show the existing system has the capacity to handle the existing and proposed impervious surface runoff (34,366 sf). (includes all 3 proposed lots) i) Project would be categorized as a Large Site project. See Chapter 4 of the Stormwater Supplement for requirements. ii) System sizing would need to meet current stormwater code flow control requirements. See Chapter 4 of the Stormwater Supplement to find flow control requirements for runoff In a direct discharge basin, available on the City of Edmonds website. iii) Soils infiltration testing by an approved method (see Supplement Chapter 4.5.2) is required for any system design using infiltration. iiii) Physical verification of the current condition and size of the bio swale described in the 2001 Stormwater Report for this project is required if intended for the stormwater mitigation of the proposed construction on lots 6, 7, and 8. b) Propose an engineered plan adding increasing capacity of the existing system. (same requirements as 2 a above) c) Leave existing system untouched and propose a separate system to meet stormwater requirements for only the proposed additional impervious surface, 6,945 sf. i) Project would be categorized as a Small Site project Category 2 if the three lots will use a shared system for mitigation. If the lots are mitigated individually each would be considered a Small Site Category 1. See Chapter 5 of the Stormwater Supplement for more information. 5. Appendix C of the Supplement provides the acceptable methods for obtaining a design infiltration rate for infiltration trenches. In addition to the methods in Appendix C of the Supplement, the City also accepts the "D10 methodology" described in Volume III, Section 3.36, number 2 (including Table 3.8) in the 2005 Department of Ecology Stormwater Management Manual for Western Washington. Once the design infiltration rate is established, the City has tables for determining the size of the infiltration trench based on the square feet of impervious area draining to the facility or the sizing can be obtained by the applicant using the modeling parameters in the Supplement. Attached please find a simplified sizing tool for low impact development or detention systems. This tool can only be used for projects that are categorized as Small Site Category 1 or 2 sites (under 10,000 sf imp surface). Drainage/Utility Plan: 1. How will the runoff from the driveway be connected to the stormwater system? Show on plans. 2. Please note on plans “Required separation of utilities shall be met per City of Edmonds and industry standards.” on Drainage/Utility plan. DATE FAXED/E-MAILED 11/16/2010 PAGE ___ OF __ 34 3. Label water meter as existing or proposed. 4. Note driveway material on plans. 5. Show existing storm line on plans. Include rim and invert elevations at all catch basins. 6. The full extent of all detention or other stormwater mitigation systems must be shown on the Drainage Plan. Include all rim and invert elevations, pipe size material and length, catch basin type, and swale dimensions. 7. Show connection of tightline/roof drains to storm system from house to storm line in easement. A catch basin must be installed at point of connection. Provide rim and all invert elevations. 8. Side sewer is shown in two locations on plans. Please clarify. 9. Utility/Drainage plan refers to sheet 4 of 4. That sheet is not included in this submission. 10. Show all utilities on plans (sewer, gas, power, water) from the connection at the property line or easement to the point of connection to the residence. 11. Show 4-6”side sewer clean out at house. 12. Label all pipe with length, material and size. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 11/16/2010 PAGE ___ OF __ 44