BLD20100784.pdfn or EDk IIIII�I11
Ik,CITY -OF EDMONDS
121 5TH AVENUE NORTH - EDMONDS,WA 98020
7�Ic. 1 R90
PHONE: (425) 771-0220 - FAX: (425) 771-0221
STATUS: ISSUED 3/3/2011 Permit #:-BLD20100784
BUILDING PERMIT
Expiration Date: 3/3/2012. Project Address: 22808 96TH PL W, EDMONDS
Parcel No: 00937900000600
CLEARWATER HOMES CLEARWATER HOMES MURPHY BUILDING CO.
PO BOX 432 PO BOX 432 6203 202ND ST SW
MARYSVILLE, WA 98270- MARYSVILLE, WA 98270- LYNNWOOD, WA 98036-
( ) - Ext. ( ) - Ext. (425) 775-3388 Ext.
LICENSE #: MURPHBCI 13K3 EXP:5/22/2012
JOB 1 /
NEW SFR ON MSTING FOUNDATION.
VALUATION: $266,464
PERMIT TYPE: Residential
PERMIT GROUP: 64 - Single Family Residence New
GRADING: N CYDS: 45
TYPE OF CONSTRUCTION: VB
RETAINING WALL ROCKERY: N
OCCUPANT GROUP: R3
OCCUPANT LOAD:
FENCE: N ( 0 X 0 FT.)
CODE: 09
OTHER: N ------- OTHER DESC:
ZONE: RS -8
NUMBER OF STORIES: 0
VESTED DATE:
NUMBER OF DWELLING UNITS: 1
LOT #: 6
BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0
BASEMENT: 0 IST FLOOR: 1414 2ND FLOOR: 1006
3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
3RD FLOOR: 0 GARAGE: 440 DECK: 110 OTHER: 0
FRONTiRE-tRSEUBACK
;EQUIRED:25 PROPOSED: 33REQUIRED: 7.5 PROPOSED: 7.5 REQUIRED: 15 PROPOSED: 40
]EIGHT ALLOWED:25 PROPOSED:23.175 REQUIRED: 7.5 PROPOSED: 7.5
IETBACK NOTES:
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOINGTHE WORK AUTHORIZED
THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABORCODE OF THE STATE OF WASHINGTON RELATINGTO
WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27.
IISA ,ATIQfl IS OT A P RMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEESARE PAID.
ar l 3 h
a Ye m
Print Nae Date R ase By Date
ATTENTION
ITIS UNLAWFUL TD USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF
OCCUPANCY HAS BEEN GRANTED. UBC109/ IBC 10/IRC 1 10.
ONLINE APPLICANT ASSESSOR OTHER
STATUS: ISSUED
BLD20100784
• Lot line stakes must be in place at the time of foundation/setback inspection.
• Special inspections have been called for on this project and are noted on the approved construction plans and building permit.
It is the owner and/or contractors responsibility to assure that reports are provided to the City on a weekly basis. Be advised—
if special inspection reports are not forthcoming, the Building Official may issue a "Stop Work" and no City inspections will be
provided until such time as the reporting agency has complied and reports are reviewed and approved by the City.
• Hose Bibbs (exterior faucets) are required to have a permanently affixed anti -siphon device installed.
• In addition to the required pressure/relief valve, an approved listed expansion tank shall be installed on all hot water tanks. Per
UPC 608.
• Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309
• Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted.
• Submit all special inspection reports to the City Building Inspector on a weekly basis.
• Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of
the building or structure. Check the job card for all required City inspections including final project approval and final
occupancy inspections.
• Provide combustion air per IMC Chapter 7 for commercial and multi -family residential installations, and IRC Chapter 17 for one
and two-family dwellings.
• Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from
adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing
fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable.
Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been
specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision
of city code or state law does not approve any items not to code specification.
• Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits
of ECC Chapter 5.30 only during the hours of7:00amto 6:00pmon weekdays and 10:00amand 6:00pmon Saturdays, excluding
Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the
noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
• Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold
harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to
modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
• REQUIRED SPECIAL INSPECTIONS FOR THIS PROJECT:
1) Excavation, grading, & site preparation
2) Soil bearing verification
3) Placement of fill & compaction
4) Footing drain
5)Temporary Erosion Control
6) Final Erosion Control
7) Site retaining wall/ rockery construction.
8) General site monitoring
9) Final letter from geotechnical engineer of record
• Contact Olympic View Water and Sewer District for water service from main to meter and meter installation.
• New and existing buildings shall have approved address numbers, building numbers or approved building identification
placed in a position that is plainly visible from the street or road fronting the property. Address numbers shall be Arabic
numerals or alphabet letters. Numbers shall be legible fromthe public way, at least 4 inches high with a''/z inch min. stroke
width on a contrasting background.
• Call for locates of underground utilities prior to any excavation.
• Maintain erosion & sedimentation control per city standards.
• Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is
caused by or occurs during the pemnitted project.
• Owner/Contractor to provide Water Service Line asbuilt at final inspection. See City Standards for requirements.
• Owner/Contractor to provide Side Sewer asbuilt at final inspection. See City Standards for requirements.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE
PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION.
PERMIT TIME LIMIT: SEE EC DC 19.00.005(A)(6)
I BUILDING (425) 771-0220 EXT. 1333 1 ENGWIMRING (425) 771-0220 EXT. 1326 1 FIRE (425) 775-7720 1
PUBLIC WORKS 425 771-0235 1 PRE TREATI UNT 425 672-5755 1 RECYCLING 425 2754801
When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being
requested, Contact Name and Phone Number, Date Prefereed, and whether you[refer morning or afternoon.
• E -Erosion Control/Mobilization
• E -Storm Connect to Stub
• E- Footing Drain Connection
• E -Water Service Line
• E -Driveway Form & Slope Ver.
• &Engineering Final
• B -Setbacks
• B -Isolated Footings/Piers
• B -First Floor Framing
• B -Plumb Rough In
• B -Gas Test/Pipe
• B -Mechanical Rough In
• B -Exterior Wall Sheathing
• B -Roof Sheathing
• B -Shear Nailing
• B -Height Verification
• B -Framing
•
13 -Wall Insulation/Caulk
• B-Insulation/Fnergy
• B-Sheetrock Nail
• B -Plumbing Final
•
13 -Mechanical Final
• B -Building Final
• E-Tightline Drain Connection
I
1
Inspection Comments
BLD20100784 64 - Single Family Residence New
PERMITTRAX
Applied: 10/22/2010 Issued: 03/03/2011 Expires: 03/03/2012
Address: 22808 96TH PL W, EDMONDS
INSPECTION DATE
1001 - E -Erosion Control/Mobilization 03/07/2011
Comment: Existing vegetation being used as TESC at this time.
1001 - E -Erosion Control/Mobilization 06/22/2011
Comment: Final approved
INSPECTOR ACTION
SIBREL PAR
LAMBERTJ CMP
1014 - E -Storm Connect to Stub 03/07/2011 SIBREL CMP
Comment: TL and FTG drains installed with old foundation and reused. CN written to disconnect ftg drain from
detention and route to a drywell. Inspection otherwise complete. CN against ftg drain inspection.
1017 - E -Footing Drain Connection 03/07/2011 SIBREL COM
Comment: CN written to disconnect ftg drain from detention and route to a drywell
1017 - E -Footing Drain Connection 03/07/2011 SIBREL CMP
Comment: Verified ftg drain disconnected from detention system and run to a drywell.
1034 - E -Water Service Line 03/07/2011 SIBREL CMP
Comment: OVSWD waterline OK. As -built sketch routed to JL for processing.
1044 - E -Driveway Form & Slope Ver. 06/22/2011 LAMBERTJ COR
Comment: Need to collect run-off from driveway prior to final approval.
1044 - E -Driveway Form & Slope Ver. 06/23/2011
LAMBERTJ
CMP
Comment: Final Approved
Comment: Gave correction notice!
1077 - E -Engineering Final 06/22/2011
LAMBERTJ
COR
Comment: Need to collect run-off from driveway prior to final approval.
STEINIKE
CMP
1077 - E -Engineering Final 06/23/2011
LAMBERTJ
CMP
Comment: Final Approved - includes counter time - Per R.English they have added a berm to direct the driveway
runoff to yard drain
03/14/2011
STEINIKE
1114 - B -Isolated Footings/Piers 03/08/2011
STEINIKE
COR
Comment: Gave Correction Notice!
1122 - B -First Floor Framing
1114 - B -Isolated Footings/Piers
03/09/2011
STEINIKE
COR
Comment: Gave correction notice!
1114 - B -Isolated Footings/Piers
03/10/2011
STEINIKE
CMP
Comment:
1122 - B -First Floor Framing
03/14/2011
STEINIKE
COR
Comment: Gave correction notice!
1122 - B -First Floor Framing
03/15/2011
STEINIKE
CMP
Comment:
1126 - B -Plumb Rough In
04/08/2011
STEINIKE
COR
Comment: Gave Correction Notice.
7/5/2011 1:51:15 PM Page 1 of 2
INSPECTION
DATE
INSPECTOR
ACTION
1126 - B -Plumb Rough In
04/20/2011
STEINIKE
CMP
Comment:
1128 - B -Gas Test/Pipe
04/20/2011
STEINIKE
CMP
Comment:
1130 - B -Mechanical Rough In
04/20/2011
STEINIKE
COM
Comment: Gave correction notice.
1130 - B -Mechanical Rough In
04/28/2011
STEINIKE
CMP
Comment:
1132 - B -Exterior Wall Sheathing
03/30/2011
STEINIKE
CMP
Comment:
1133 - B -Roof Sheathing
04/08/2011
STEINIKE
CMP
Comment:
1136 - B -Shear Nailing
04/28/2011
STEINIKE
CMP
Comment:
1140 - B -Height Verification
05/03/2011
STEINIKE
CMP
Comment:
1142 - B -Framing
03/30/2011
STEINIKE
CMP
Comment: Check for A-35 clips.
1144 - B -Wall Insulation/Caulk
05/02/2011
STEINIKE
CMP
Comment:
1150 - B-Sheetrock Nail
05/10/2011
STEINIKE
CMP
Comment:
1152 - B -Plumbing Final
06/21/2011
STEINIKE
COR
Comment: Gave correction notice!
1152 - B -Plumbing Final
07/05/2011
STEINIKE
CMP
Comment:
1156 - B -Mechanical Final
07/05/2011
STEINIKE
CMP
Comment:
1158 - B -Building Final
06/23/2011
STEINIKE
COM
Comment: Needs Engineering FINAL!
1158 - B -Building Final
07/05/2011
STEINIKE
CMP
Comment:
3023 - E-Tightline Drain Connection
07/05/2011
LAMBERTJ
CMP
Comment: Duplicate inspection - See Storm Connect to Stub inspection.
7/5/2011 1:51:15 PM Page 2 of 2
U!
tll
C
c�
M
N
N
2
s n
cD a
h
o
CL
oto
C
z
m
N
O
o, O
o `D
'D c 0,
N w 0 U
CD a S.
o a
c 2)i
N N r
C a m
D
CD °_: :E
=" O D
CD FL Ot m
M
W_ N =
°• o O
Cc O rn
n
O =
a
`D r
c
o I
C
OM.
N
N
N
U)
O
=
00
N
N
=
C
M
C—C
G
�
m
�
v
N
CD
O
z
C'f
�
D
c
A
C
rn
C
7
•�
X
Z
_....
rn
Z`...
z v
w
ol
z
rr7, 3
co m
z
o0
7 '•� O I
SAll /
00
°r l
0
/ L
20' ice T
Vis!
441,
041
J7
cam., r r '>-o`.
/ 4s /
ag y
/ Q 25' B
ryl
,oz
ci�
e n e nl \
19
CT .
�` tolQ %
it cr 46D
t ,
0-
N
.J. CD r <7
-;
!1
S 6 ` `��' srn
0.0
rnM
-
�s
Pt
19
CT .
�` tolQ %
it cr 46D
t ,
0-
N
.J. CD r <7
-;
!1
S 6 ` `��' srn
0.0
rnM