Loading...
BLD20100784.pdfn or EDk IIIII�I11 Ik,CITY -OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS,WA 98020 7�Ic. 1 R90 PHONE: (425) 771-0220 - FAX: (425) 771-0221 STATUS: ISSUED 3/3/2011 Permit #:-BLD20100784 BUILDING PERMIT Expiration Date: 3/3/2012. Project Address: 22808 96TH PL W, EDMONDS Parcel No: 00937900000600 CLEARWATER HOMES CLEARWATER HOMES MURPHY BUILDING CO. PO BOX 432 PO BOX 432 6203 202ND ST SW MARYSVILLE, WA 98270- MARYSVILLE, WA 98270- LYNNWOOD, WA 98036- ( ) - Ext. ( ) - Ext. (425) 775-3388 Ext. LICENSE #: MURPHBCI 13K3 EXP:5/22/2012 JOB 1 / NEW SFR ON MSTING FOUNDATION. VALUATION: $266,464 PERMIT TYPE: Residential PERMIT GROUP: 64 - Single Family Residence New GRADING: N CYDS: 45 TYPE OF CONSTRUCTION: VB RETAINING WALL ROCKERY: N OCCUPANT GROUP: R3 OCCUPANT LOAD: FENCE: N ( 0 X 0 FT.) CODE: 09 OTHER: N ------- OTHER DESC: ZONE: RS -8 NUMBER OF STORIES: 0 VESTED DATE: NUMBER OF DWELLING UNITS: 1 LOT #: 6 BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 BASEMENT: 0 IST FLOOR: 1414 2ND FLOOR: 1006 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 3RD FLOOR: 0 GARAGE: 440 DECK: 110 OTHER: 0 FRONTiRE-tRSEUBACK ;EQUIRED:25 PROPOSED: 33REQUIRED: 7.5 PROPOSED: 7.5 REQUIRED: 15 PROPOSED: 40 ]EIGHT ALLOWED:25 PROPOSED:23.175 REQUIRED: 7.5 PROPOSED: 7.5 IETBACK NOTES: I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOINGTHE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABORCODE OF THE STATE OF WASHINGTON RELATINGTO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. IISA ,ATIQfl IS OT A P RMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEESARE PAID. ar l 3 h a Ye m Print Nae Date R ase By Date ATTENTION ITIS UNLAWFUL TD USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109/ IBC 10/IRC 1 10. ONLINE APPLICANT ASSESSOR OTHER STATUS: ISSUED BLD20100784 • Lot line stakes must be in place at the time of foundation/setback inspection. • Special inspections have been called for on this project and are noted on the approved construction plans and building permit. It is the owner and/or contractors responsibility to assure that reports are provided to the City on a weekly basis. Be advised— if special inspection reports are not forthcoming, the Building Official may issue a "Stop Work" and no City inspections will be provided until such time as the reporting agency has complied and reports are reviewed and approved by the City. • Hose Bibbs (exterior faucets) are required to have a permanently affixed anti -siphon device installed. • In addition to the required pressure/relief valve, an approved listed expansion tank shall be installed on all hot water tanks. Per UPC 608. • Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309 • Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted. • Submit all special inspection reports to the City Building Inspector on a weekly basis. • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Provide combustion air per IMC Chapter 7 for commercial and multi -family residential installations, and IRC Chapter 17 for one and two-family dwellings. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of7:00amto 6:00pmon weekdays and 10:00amand 6:00pmon Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. • REQUIRED SPECIAL INSPECTIONS FOR THIS PROJECT: 1) Excavation, grading, & site preparation 2) Soil bearing verification 3) Placement of fill & compaction 4) Footing drain 5)Temporary Erosion Control 6) Final Erosion Control 7) Site retaining wall/ rockery construction. 8) General site monitoring 9) Final letter from geotechnical engineer of record • Contact Olympic View Water and Sewer District for water service from main to meter and meter installation. • New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible from the street or road fronting the property. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be legible fromthe public way, at least 4 inches high with a''/z inch min. stroke width on a contrasting background. • Call for locates of underground utilities prior to any excavation. • Maintain erosion & sedimentation control per city standards. • Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is caused by or occurs during the pemnitted project. • Owner/Contractor to provide Water Service Line asbuilt at final inspection. See City Standards for requirements. • Owner/Contractor to provide Side Sewer asbuilt at final inspection. See City Standards for requirements. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE EC DC 19.00.005(A)(6) I BUILDING (425) 771-0220 EXT. 1333 1 ENGWIMRING (425) 771-0220 EXT. 1326 1 FIRE (425) 775-7720 1 PUBLIC WORKS 425 771-0235 1 PRE TREATI UNT 425 672-5755 1 RECYCLING 425 2754801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Prefereed, and whether you[refer morning or afternoon. • E -Erosion Control/Mobilization • E -Storm Connect to Stub • E- Footing Drain Connection • E -Water Service Line • E -Driveway Form & Slope Ver. • &Engineering Final • B -Setbacks • B -Isolated Footings/Piers • B -First Floor Framing • B -Plumb Rough In • B -Gas Test/Pipe • B -Mechanical Rough In • B -Exterior Wall Sheathing • B -Roof Sheathing • B -Shear Nailing • B -Height Verification • B -Framing • 13 -Wall Insulation/Caulk • B-Insulation/Fnergy • B-Sheetrock Nail • B -Plumbing Final • 13 -Mechanical Final • B -Building Final • E-Tightline Drain Connection I 1 Inspection Comments BLD20100784 64 - Single Family Residence New PERMITTRAX Applied: 10/22/2010 Issued: 03/03/2011 Expires: 03/03/2012 Address: 22808 96TH PL W, EDMONDS INSPECTION DATE 1001 - E -Erosion Control/Mobilization 03/07/2011 Comment: Existing vegetation being used as TESC at this time. 1001 - E -Erosion Control/Mobilization 06/22/2011 Comment: Final approved INSPECTOR ACTION SIBREL PAR LAMBERTJ CMP 1014 - E -Storm Connect to Stub 03/07/2011 SIBREL CMP Comment: TL and FTG drains installed with old foundation and reused. CN written to disconnect ftg drain from detention and route to a drywell. Inspection otherwise complete. CN against ftg drain inspection. 1017 - E -Footing Drain Connection 03/07/2011 SIBREL COM Comment: CN written to disconnect ftg drain from detention and route to a drywell 1017 - E -Footing Drain Connection 03/07/2011 SIBREL CMP Comment: Verified ftg drain disconnected from detention system and run to a drywell. 1034 - E -Water Service Line 03/07/2011 SIBREL CMP Comment: OVSWD waterline OK. As -built sketch routed to JL for processing. 1044 - E -Driveway Form & Slope Ver. 06/22/2011 LAMBERTJ COR Comment: Need to collect run-off from driveway prior to final approval. 1044 - E -Driveway Form & Slope Ver. 06/23/2011 LAMBERTJ CMP Comment: Final Approved Comment: Gave correction notice! 1077 - E -Engineering Final 06/22/2011 LAMBERTJ COR Comment: Need to collect run-off from driveway prior to final approval. STEINIKE CMP 1077 - E -Engineering Final 06/23/2011 LAMBERTJ CMP Comment: Final Approved - includes counter time - Per R.English they have added a berm to direct the driveway runoff to yard drain 03/14/2011 STEINIKE 1114 - B -Isolated Footings/Piers 03/08/2011 STEINIKE COR Comment: Gave Correction Notice! 1122 - B -First Floor Framing 1114 - B -Isolated Footings/Piers 03/09/2011 STEINIKE COR Comment: Gave correction notice! 1114 - B -Isolated Footings/Piers 03/10/2011 STEINIKE CMP Comment: 1122 - B -First Floor Framing 03/14/2011 STEINIKE COR Comment: Gave correction notice! 1122 - B -First Floor Framing 03/15/2011 STEINIKE CMP Comment: 1126 - B -Plumb Rough In 04/08/2011 STEINIKE COR Comment: Gave Correction Notice. 7/5/2011 1:51:15 PM Page 1 of 2 INSPECTION DATE INSPECTOR ACTION 1126 - B -Plumb Rough In 04/20/2011 STEINIKE CMP Comment: 1128 - B -Gas Test/Pipe 04/20/2011 STEINIKE CMP Comment: 1130 - B -Mechanical Rough In 04/20/2011 STEINIKE COM Comment: Gave correction notice. 1130 - B -Mechanical Rough In 04/28/2011 STEINIKE CMP Comment: 1132 - B -Exterior Wall Sheathing 03/30/2011 STEINIKE CMP Comment: 1133 - B -Roof Sheathing 04/08/2011 STEINIKE CMP Comment: 1136 - B -Shear Nailing 04/28/2011 STEINIKE CMP Comment: 1140 - B -Height Verification 05/03/2011 STEINIKE CMP Comment: 1142 - B -Framing 03/30/2011 STEINIKE CMP Comment: Check for A-35 clips. 1144 - B -Wall Insulation/Caulk 05/02/2011 STEINIKE CMP Comment: 1150 - B-Sheetrock Nail 05/10/2011 STEINIKE CMP Comment: 1152 - B -Plumbing Final 06/21/2011 STEINIKE COR Comment: Gave correction notice! 1152 - B -Plumbing Final 07/05/2011 STEINIKE CMP Comment: 1156 - B -Mechanical Final 07/05/2011 STEINIKE CMP Comment: 1158 - B -Building Final 06/23/2011 STEINIKE COM Comment: Needs Engineering FINAL! 1158 - B -Building Final 07/05/2011 STEINIKE CMP Comment: 3023 - E-Tightline Drain Connection 07/05/2011 LAMBERTJ CMP Comment: Duplicate inspection - See Storm Connect to Stub inspection. 7/5/2011 1:51:15 PM Page 2 of 2 U! tll C c� M N N 2 s n cD a h o CL oto C z m N O o, O o `D 'D c 0, N w 0 U CD a S. o a c 2)i N N r C a m D CD °_: :E =" O D CD FL Ot m M W_ N = °• o O Cc O rn n O = a `D r c o I C OM. N N N U) O = 00 N N = C M C—C G � m � v N CD O z C'f � D c A C rn C 7 •� X Z _.... rn Z`... z v w ol z rr7, 3 co m z o0 7 '•� O I SAll / 00 °r l 0 / L 20' ice T Vis! 441, 041 J7 cam., r r '>-o`. / 4s / ag y / Q 25' B ryl ,oz ci� e n e nl \ 19 CT . �` tolQ % it cr 46D t , 0- N .J. CD r <7 -; !1 S 6 ` `��' srn 0.0 rnM - �s Pt 19 CT . �` tolQ % it cr 46D t , 0- N .J. CD r <7 -; !1 S 6 ` `��' srn 0.0 rnM