Loading...
BLD-2010-0793 CA decision.pdfCity of Edmonds Critical Area Notice of Decision Applicant: Property Owner: YY Critical Area FilePermit 0 Number: >C 2 o 0 7 'i Site Location: Parcel Number: Project Description: c;, d 9,Waiver. No critical area report is required for the project described above. 1. �` There will be no alteration of a Critical Area or its required buffer. 2. The proposal is an allowed activity pursuant to ECDC 23,40.220, 23.50.220, and/or 23.80.040, 3. The proposal is exempt pursuant to ECDC 23,40,230. F] Critical Area Report Required I The proposal minimizes the impact on critical areas in accordance with ECDC 23,40.120, Mitigation sequencing; 2. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site; 3. The proposal is consistent with the general purposes of this title and the public interest; 4. Any alterations permitted to the critical area are mitigated in accordance with ECDC 23,40.110, Mitigation requirements. 5. The proposal protects the critical area functions and values consistent with the best available science and results in no net loss of critical functions and values; and 6. The proposal is consistent with other applicable regulations and standards. F -I Limited report for stable erosion hazard consistent with ECDC 23.80.050.H required. F -I Critical Area specific condition(s) have been applied to the permit number referenced above. See referenced permit number for specific condition(s). The proposed project as described above and as shown on the attached site plan meets or is exempt from the criteria in ECDC 23.40.160, Review Criteria, and complies with the applicable provisions of the City of Edmonds critical area regulations. Any subsequent changes to the proposal shall void this decision pending re -review of the proposal. Reviewer Revised 11/03/2010 Signature Date