BLD20100869.pdf0 EDy7O� 6
CITY OF EDMONDS
121 5TH AVENUE NORTH - EDMONDS,WA 98020
i PHONE: (425) 771-0220 - FAX: (425) 771-0221
STATUS: ISSUED 2/15/2011 Permit_# BLD20100.8691
Expiration Date: 2/15/2012
Parcel No: 00484500201600
STEVEN & CHER
MACFARLANE-FERNANDEZ
5169TH AVE S
EDMONDS, WA 98020-3309
j Project Address:516 9TH AVE S, EDMONDSI
JIM MUSAR
15617 37TH AVE NE
LFP, WA 98020-
EDMONDS REMODEL
PO BOX 1692
EDMONDS, WA 98020-
( ) - Ext. (206) 334-8665 Ext. (425) 670-8496 Ext.
LICENSE #: EDMONRI972BG EXP: 1/18/2013
OB DESCRIPTION
ADD 61 SF PORCH AND M -FILL EXISTING COVERED DECK TO CREATENEW 253SF LIVING AREA
VALUATION: $26,926
PERMIT TYPE: Residential
GRADING: N CYDS: 50
RETAINING WALL ROCKERY: N
AIL AWk In N OM R OW
PERMIT GROUP: 02 - Addition
TYPE OF CONSTRUCTION: VB
OCCUPANT GROUP: R3
OCCUPANT LOAD:
FENCE: N ( 0 X 0 FT.)
CODE: 2009
OTHER: N ------- OTHER DESC:
ZONE: RS -6
NUMBER OF STORIES: 0
VESTED DATE:
NUMBER OF DWELLING UNITS: 0
LOT #:
BASEMENT: 456 IST FLOOR: 2220
2ND FLOOR: 640 BASEMENT:0 1STFLOOR: 0 2ND FLOOR: 0
3RD FLOOR: 0 GARAGE: 1346 DECK: 0
OTHER: 0 13RD FLOOR: 253 GARAGE: 0 DECK: 56 OTHER: 0
FRONTSLTBACK
(EQU1RED: See Below PROPOSED:REQUIRED: PROPOSED: REQUIRED: PROPOSED:
{EIGHT ALLOWED:25 PROPOSED:23.6 REQUIRED: PROPOSED:
;ETBACK NOTES: Site is a corner lot; therefore, required setbacks are as follows: Street = 20' from E and S property lines, Side = 5' from N and W
)roperty lines. Proposed front entry, trellis, and sunroom enclosure will comply with these minimum setback requirements.
1 AGREE TO OMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED
"THEREBY, N ERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO
WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27.
IS JPI&I ION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PALD.
ex -
Date
1
% —' ATTENTION
ITIS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF
OCCUPANCY HAS BEEN GRANTED. UBC109/ IBCI 10/ IRCI 10.
ONLINE APPLICANT ASSESSOR �THER
,zenf li-)r, tv0xD/1
STATUS: ISSUED BLD20100869
CONDITIONS
• Installation, use and maintenance of equipment and components shall be per manufacturer's specifications, installation
instructions, and applicable state codes. Provide manufacture's installation instructions on site for Building Inspector.
• Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of
the building or structure. Check the job card for all required City inspections including final project approval and final
occupancy inspections.
• Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from
adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing
fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable.
Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been
specifically identified, requested and considered by the appropriate city official in accordance with the'appropriate provision
of city code or state law does not approve any items not to code specification.
• Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits
of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the
noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
• Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold
harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to
modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
• Maintain erosion & sedimentation control per city standards.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE
PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION.
PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6)
BUILDING (425) 771-0220 EXT. 1333 1 FNGINMUNG (425) 771-0220 EXT. 1326 1 FIRE (425) 775-7720
PUBLIC WORKS 425 771-0235 1 PR&TREATMENT (425)672-5755 1 RECYCLING 425 2754801
When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being
requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon.
• E -Erosion Control/Mobilization
• E-Fngineering Final
• B -Setbacks
• B -Footings
• B -Foundation Wall
• B -First Floor Framing
B -Plumb Rough In
• B -Mechanical Rough In
• B -Roof Sheathing
• B -Height Verification
• B -Framing
• B-WallInsulation/Caulk
• B-Insulation/Energy
• B-Sheetrock Nail
• B -Plumbing Final
• B -Mechanical Final
• B -Building Final
• B -Pervious Pavement Subgrade x2
OVEbV Inspection Comments
N
BLD20100869
02 - Addition
Applied: 11/19/2010
Issued: 02/15/2011
Expires:
03/23/2012
Address: 516 9TH AVE S, EDMONDS
INSPECTION
DATE
INSPECTOR
ACTION
1001 - E -Erosion Control/Mobilization
02/18/2011
MCCONNELL
COM
Comment: Did not call for inspection. Spoke with
contractor on site - he will call next week. Discussed covering
exposed soils, sweepeing, rock backfill
on silt fence.
1001 - E -Erosion Control/Mobilization
02/23/2011
LAMBERTJ
PAR
Comment: TESC adequate at this time.
1001 - E -Erosion Control/Mobilization
03/21/2012
ZULAUF
CMP
Comment: ok to final
1077 - E -Engineering Final
03/21/2012
ZULAUF
CMP
Comment: ok to final
1106 - B -Setbacks
03/02/2011
STEINIKE
CMP
Comment:
1108 - B -Footings
03/02/2011
STEINIKE
CMP
Comment:
1110 - B -Foundation Wall
03/03/2011
STEINIKE
CMP
Comment:
1112 - B -Foundation Drainage
03/30/2011
STEINIKE
COR
Comment: Gave correction notice!
1112 - B -Foundation Drainage
04/04/2011
STEINIKE
CMP
Comment:
1116 - B -Retaining Wall
03/23/2011
LAWLER
CMP
Comment: footings and walls
1142 - B -Framing
04/25/2011
STEINIKE
PAR
Comment: Front only!
1142 - B -Framing
03/20/2012
LAWLER
CMP
Comment:
1158 - B -Building Final
03/20/2012
LAWLER
CMP
Comment: Scope of work revised to eliminate interior
portion of project.
3023 - E -Pervious Pavement Subgrade x 2
03/21/2012
ZULAUF
CMP
Comment: constructed per manufacturer's specs
4/18/2012 2:08:10 PM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 1 of 1