Loading...
BLD20100869.pdf0 EDy7O� 6 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS,WA 98020 i PHONE: (425) 771-0220 - FAX: (425) 771-0221 STATUS: ISSUED 2/15/2011 Permit_# BLD20100.8691 Expiration Date: 2/15/2012 Parcel No: 00484500201600 STEVEN & CHER MACFARLANE-FERNANDEZ 5169TH AVE S EDMONDS, WA 98020-3309 j Project Address:516 9TH AVE S, EDMONDSI JIM MUSAR 15617 37TH AVE NE LFP, WA 98020- EDMONDS REMODEL PO BOX 1692 EDMONDS, WA 98020- ( ) - Ext. (206) 334-8665 Ext. (425) 670-8496 Ext. LICENSE #: EDMONRI972BG EXP: 1/18/2013 OB DESCRIPTION ADD 61 SF PORCH AND M -FILL EXISTING COVERED DECK TO CREATENEW 253SF LIVING AREA VALUATION: $26,926 PERMIT TYPE: Residential GRADING: N CYDS: 50 RETAINING WALL ROCKERY: N AIL AWk In N OM R OW PERMIT GROUP: 02 - Addition TYPE OF CONSTRUCTION: VB OCCUPANT GROUP: R3 OCCUPANT LOAD: FENCE: N ( 0 X 0 FT.) CODE: 2009 OTHER: N ------- OTHER DESC: ZONE: RS -6 NUMBER OF STORIES: 0 VESTED DATE: NUMBER OF DWELLING UNITS: 0 LOT #: BASEMENT: 456 IST FLOOR: 2220 2ND FLOOR: 640 BASEMENT:0 1STFLOOR: 0 2ND FLOOR: 0 3RD FLOOR: 0 GARAGE: 1346 DECK: 0 OTHER: 0 13RD FLOOR: 253 GARAGE: 0 DECK: 56 OTHER: 0 FRONTSLTBACK (EQU1RED: See Below PROPOSED:REQUIRED: PROPOSED: REQUIRED: PROPOSED: {EIGHT ALLOWED:25 PROPOSED:23.6 REQUIRED: PROPOSED: ;ETBACK NOTES: Site is a corner lot; therefore, required setbacks are as follows: Street = 20' from E and S property lines, Side = 5' from N and W )roperty lines. Proposed front entry, trellis, and sunroom enclosure will comply with these minimum setback requirements. 1 AGREE TO OMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED "THEREBY, N ERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. IS JPI&I ION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PALD. ex - Date 1 % —' ATTENTION ITIS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109/ IBCI 10/ IRCI 10. ONLINE APPLICANT ASSESSOR �THER ,zenf li-)r, tv0xD/1 STATUS: ISSUED BLD20100869 CONDITIONS • Installation, use and maintenance of equipment and components shall be per manufacturer's specifications, installation instructions, and applicable state codes. Provide manufacture's installation instructions on site for Building Inspector. • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the'appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. • Maintain erosion & sedimentation control per city standards. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) BUILDING (425) 771-0220 EXT. 1333 1 FNGINMUNG (425) 771-0220 EXT. 1326 1 FIRE (425) 775-7720 PUBLIC WORKS 425 771-0235 1 PR&TREATMENT (425)672-5755 1 RECYCLING 425 2754801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon. • E -Erosion Control/Mobilization • E-Fngineering Final • B -Setbacks • B -Footings • B -Foundation Wall • B -First Floor Framing B -Plumb Rough In • B -Mechanical Rough In • B -Roof Sheathing • B -Height Verification • B -Framing • B-WallInsulation/Caulk • B-Insulation/Energy • B-Sheetrock Nail • B -Plumbing Final • B -Mechanical Final • B -Building Final • B -Pervious Pavement Subgrade x2 OVEbV Inspection Comments N BLD20100869 02 - Addition Applied: 11/19/2010 Issued: 02/15/2011 Expires: 03/23/2012 Address: 516 9TH AVE S, EDMONDS INSPECTION DATE INSPECTOR ACTION 1001 - E -Erosion Control/Mobilization 02/18/2011 MCCONNELL COM Comment: Did not call for inspection. Spoke with contractor on site - he will call next week. Discussed covering exposed soils, sweepeing, rock backfill on silt fence. 1001 - E -Erosion Control/Mobilization 02/23/2011 LAMBERTJ PAR Comment: TESC adequate at this time. 1001 - E -Erosion Control/Mobilization 03/21/2012 ZULAUF CMP Comment: ok to final 1077 - E -Engineering Final 03/21/2012 ZULAUF CMP Comment: ok to final 1106 - B -Setbacks 03/02/2011 STEINIKE CMP Comment: 1108 - B -Footings 03/02/2011 STEINIKE CMP Comment: 1110 - B -Foundation Wall 03/03/2011 STEINIKE CMP Comment: 1112 - B -Foundation Drainage 03/30/2011 STEINIKE COR Comment: Gave correction notice! 1112 - B -Foundation Drainage 04/04/2011 STEINIKE CMP Comment: 1116 - B -Retaining Wall 03/23/2011 LAWLER CMP Comment: footings and walls 1142 - B -Framing 04/25/2011 STEINIKE PAR Comment: Front only! 1142 - B -Framing 03/20/2012 LAWLER CMP Comment: 1158 - B -Building Final 03/20/2012 LAWLER CMP Comment: Scope of work revised to eliminate interior portion of project. 3023 - E -Pervious Pavement Subgrade x 2 03/21/2012 ZULAUF CMP Comment: constructed per manufacturer's specs 4/18/2012 2:08:10 PM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 1 of 1