BlD20110088 UST Letter.pdfBUDGET TANK REMOVAL & ENVIRONMENTAL SERVICES, LLC
P.O. Box 77552
Seattle, WA 98177
(206) 789-5500 Fax (206) 306-9091
Dear Mr. Westfall:
Enclosed please find a copy of the final soil samples for the Bright Project Site. Please be advised that a
successful remediation took place at the Bright project. The soil samples indicate that all contaminated
soil has been removed from the area of the tank.
Sincerely,
Ter sa MacClellan
Office Manager
FRIEDMAN & BRUYA, INC.
ENVIRONMENTAL CHEMISTS
Date of Report: 08/09/11
Date Received: 08/08/11
Project: BES 0914, F&BI 108099
Date Extracted: 08/08/11
Date Analyzed: 08/08/11 and 08/09/11
RESULTS FROM THE ANALYSIS OF SOIL SAMPLES
FOR TOTAL PETROLEUM HYDROCARBONS AS DIESEL
USING METHOD NWTPH-Dx
Extended to Include Motor Oil Range Compounds
Results Reported on a Dry Weight Basis
Results Reported as mg/kg (ppm)
1
Surrogate
Sample ID
Diesel Extended
(% Recovery)
Laboratory ID
(CIO -C36)
(Limit 50-150)
P-2-9-080511
17,000
ip
108099-01
F-1-9.5-080511
<50
116
108099-02
F-2-9.5-080511
<50
116
]09099-03
F-3-9.5-080511
<50
118
1080941-u4
F-4-9.5-080511
<50
117
108099-06
F-5-10.5-080511
<50
126
108099-06
Method Blank
<50
113
01-1426 MB
1