Loading...
BLD20110110.pdfy OF ED410 7�'c. I R90 STATUS: ISSUED 2/25/2011 Expiration Date: 2/25/2012 Parcel No: 23270340120106 8 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS,WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 Permit#: BLD20110110 j -Project Address: 180 WEST DAYTON, ST #105,' EDMONDS: PROPERTYOWNER APPLICANT CONTktFCTM GALLAGHER'S WHERE YOU BREW GALLAGHER'S WHERE YOU BREW PROPERTY OWNER EXEMPTION TAKEN 180 WEST DAYTON ST #105 180 WEST DAYTON ST 4105 EDMONDS, WA 98020- EDMONDS, WA 98020- (425) 776-4209 Ext. (425) 776-4209 Ext. ( ) - Ext. LICENSE 4: EXP: Minor work to increase occupant load. New occupancy is A2. VALUATION: $500 PERMIT TYPE: Commercial PERMIT GROUP: 71 - Tenant Improvement GRADING: N CYDS: 0 TYPE OF CONSTRUCTION: RETAINING WALL ROCKERY: N OCCUPANT GROUP: A2 OCCUPANT LOAD: 150 FENCE: N ( 0 X 0 FT.) CODE: 2009 JOT HER: N ------- OTHER DESC: ZONE: NUMBER OF STORIES: 0 VESTED DATE: NUMBER OF DWELLING UNITS: 0 ILOT #: BASEMENT: 0 IST FLOOR: 0 2ND FLOOR: 0 BASEMENT: 0 IST FLOOR: 0 2ND FLOOR: 0 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 13RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 FRONTSi t.EQUIRED: PROPOSED:REQUIRED: PROPOSED: REQUIRED: PROPOSED: {EIGHT ALLOWED:O PROPOSED:O REQUIRED: PROPOSED: ET BACK NOTES: 1 AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. T,HTSIrAPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS✓H;?R DEPUTY AND ALL FEES ARE PAID. Print Date By Date ATTENTION ITIS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109/ IBCI 10/ IRCI 10. = ONLINE = APPLICANT = ASSESSOR (61o,tted Nilb, A qe� 4 nal Jhgz64 l-% STATUS: ISSUED BLD20110110 CONDITIONS • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating from temporary construction sites as a result of construction activity are en rmpt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. INSPECTIONS THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) BUILDING (425) 771-0220 EXT. 1333 1 FNGINFFRNG (425) 771-0220 EXT. 1326 1 FIRE (425) 775-7720 J PUBLIC WORKS (425)771-0235 1 PRE-TREATMENT (425)672-5755 1 RECYCLING 425 2754801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon. • B -Building Final • F -Fire Final °f E°'"�ti Inspection Comments BLD20110110 71 - Tenant Improvement Applied: 02/17/2011 Issued: 02/25/2011 Expires: 02/25/2012 Address: 180 WEST DAYTON ST #105, EDMONDS INSPECTION DATE INSPECTOR ACTION 1158 - B-Building Final 11/03/2011 STEINIKE CMP Comment: 1985 - F-Fire Final 02/25/2011 WESTFALL CMP Comment: 11/7/2011 4:04:29 PM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 1 of 1 EXEMPTION FROM CONTRACTOR REGISTRATION VERIFICATION FORM D The undersigned property owner or authorized person as described below, has applied for a building permit from the City of Edmonds and claims that he/she/it is exempt from providing contractor registration in accordance with the provisions of RCW 18.27. The property owner or authorized person, by their signature below, hereby verifies to the City of Edmonds that: ❑ Value of work under $500.00. The aggregate contract price of labor and materials and all other items required for the project is less than $500.00 and is not part of a larger operation to be undertaken on the property. This exemption does not apply to a person who advertises or puts out any sign or card or other device which might indicate to the public that lie/she is a contractor, or that he/she is qualified to engage in the business of contractor. RCW 18.27.090(9). ❑ Owner who contracts for a project. A property owner contracting with registered contractors for the project, and who him/herself is not performing any activity of a contractor for the purpose of leasing or selling improved property that he/she has owned for less than twelve months. RCW 18.27.090(11). Work performed personally on own. property. Anyone personally working on property he/she owns, or at which he/she resides, as long as the property owner, or resident, does not perform any activity of a contractor on his/her property for the purpose of selling, demolishing, or leasing the property. RCW 18.27.090(12). ❑ Use of own employees. Property owner using him/herself or his/her own employees to perform maintenance, repair, and. alteration work in or upon his/her own property. RCW 18.27.090(13). ❑ Licensed Architect, engineer, electrician or plumber. All work performed under this permit will be performed by an architect, civil or professional engineer, certified electrician or certified plumber operating within the scope of his/her certification. RCW 18.72.090(14). ❑ Other. Specify which provision of RCW 18.27.090 applies: THE UNDERSIGNED PROPERTY OWNER OR AUTHORIZED PERSON HEREBY VERIFIES THAT ALL INFORMATION PROVIDED ON THIS FORM IS TRUE AND ACCURATE TO THE BEST OF HIS OR HER KNOWLEDGE AND ACKNOWLEDGES THAT IF ANY OF THE INFORMATION PROVIDED ON THIS FORM IS FALSE HE OR SHE UNDERSTANDS THAT THE BUILDING PERMIT WILL BE IMMEDIATELY REVOKED AND ALL FEES PAID FORFEITED. DATED this day of , 20L. E OWNE UTHORIZE WITNESS PERSON Signature S* a Print Name Print Name LATEMP\BUILDING\HANDOUTS REVISED IN 2009\PREVIOUS HANDOUTS\FORMS\CONTRACTOR EXEMPTION FORM D.DOCREVISED 7/07 Geotechnical Report Addendum THE GALLI GROUP Geotechnical Consulting Glen Read 2123 NW 204th Street Shoreline, WA 98177 Subject: Addendum to Geotechnical Report 9947 Water Street Edmonds, Washington BLD2010 0999 Dear Glen: March 22, 2010 TGG Project 1567-2 RESUB MAR 2 3 2011 BUILDING DEPAR4:MENY CIN OF EDMONDS This letter is intended as an addendum to our previous geotechnical report prepared for the address referenced above (Geotechnical Report Read Residence, 9921 Water Street, Edmonds, Washington, dated October 17, 2009). The planning department has requested an addendum to our previous report in their review comments dated Feb 7, 2011, addressing the landscape requirements within the modified 40 foot setback that we recommended in our report. In our report we recommended a 25 -foot setback from the property line as a minimum combined setback from the top of slope for building and buffer, corresponding to about 40 feet from the top of the embankment. The portion between the property line and the top of the slope should remain vegetated and undisturbed throughout construction and should be considered the vegetated buffer. The portion between the western property line and a parallel line 25 feet easterly of the property line may be considered the building setback. This area should eventually be landscaped but can be disturbed during construction for utilities, site work, and landscaping activities. No buildings or structures should be permitted within this 25 -foot setback. Subsurface drainage for the footing drains may be permitted within the setback. We reviewed the proposed landscape plan prepared by Natural Concept Landscape Co., revised 3-7-11. In our opinion this landscape plan is consistent with our recommendations. We have 628 N 201 Lane — Seattle, WA 98133 - Phone: (206) 546-8901 - Fax: (206) 542-7625 Geotechnical Report Addendum 9947 Water Street BLD 2010 0999 also reviewed the latest site plan prepared by LSA and it appears consistent with our recommendations. We trust that this helps you move forward in your plans for the project. Please do not hesitate to contact us if you have any questions about this report or our recommendations. Sincerely, THE GALLI GROUP Paul L. Stoltenberg, P.E. Project Geotechnical Engineer 22-2010 1567 Read Report Addendum 2 The Galli Group Geotechnical Response to Corrections THE GALLI GROUP Geotechnical Consulting March l 8, 2011 TGG Project 1567-2 Lovell-Sauerland and Associates 19217 — 36h Avenue W. Suite 106 Lynnwood, WA 98106 Attention: Robert Long Subject: Geotechnical Response to Corrections Drainage Review 9921 Water Street Edmonds, Washington We understand that the City of Edmonds has asked that Hydrologic group B (SCS Runoff Modeling) be used for estimating the runoff generated from the above site. This seems appropriate in light of the soils observed in our test pits and the 10 percent silt content of the soil. The site soils become very dense at about 18 to 30 inches of depth. The geologic unit often contains layers of less permeable material such as silty SAND. These dense or relatively less permeable soils would likely be exposed during grading activity upslope from the house. We think Hydrologic Group B may be used in modeling the runoff for the site. Due to the relatively shallow drainage system, the footing drains cannot gravity drain into the detention system. Because so much water will be captured from the site in impervious areas, we anticipate that the footing drains will not contribute much volume of runoff, but are always a prudent design for foundations where slabs on grade are planned or to keep crawl spaces dry. In our opinion the 30 -foot long 2'x2' trench proposed will provide an adequate way of handling the minor runoff (if any) generated from the footing drains. See attached detail (Figure 1). Sincerely, THE GALLI GROUP Paul L. Stoltenberg, P.E. Project Geotechnical Engineer !011 5034 —18"' Avenue NE, Seattle, WA 98105 - Phone: (206) 525-5097 - Fax: (206) 525-5091 RESUB . C V MAR 2 3 2011 BUILDING�TR EDMONDS� Infiltration Trench for Footing Drains No Scale Trench shall be 30 feet long and located as shwon on Site Plan Topsoil ' v N Marafi 160N geotextile on top of washed gravel \ 3/4" to 1'/Z' washed rock 4" dia. perf. pipe 00 0 00 0 N provide positive Opo0o�po °o�po0o �oC \ drainage toward collection system 24" min. Read Residence The Galli Group 9921 Water Street 503418th Avenue NE Seattle, WA 98105 Edmonds, Washington co v Figure 1