BLD20110158.pdf0 0 W
OF ED4f
CITY OF EDMONDS
121 5TH AVENUE NORTH - EDMONDS, WA 98020
��le. I g90
PHONE: (425) 771-0220 - FAX: (425) 771-0221
STATUS: ISSUED 7/1/2011 Permit #: BLD20110158`;
D BUILDING PERMIT
Expiration Date: 7/1/2012 ProjectAddress: 620 EDMONDSMAY, EDMONDS�
Parcel No: 27032500307300
2474 SF BANK, includes retaining wall, plumbing and mechanical.
VALUATION: $270,903.00
PERMIT TYPE: Commercial
PERMIT GROUP: 45 - New Commercial
GRADING: Y CYDS: 290
FIRST SECURITY BANK
BCRA
WILCOX CONSTRUCTION
6920 200TH ST SW STE 300
MAT BERGMAN
234 5TH AVE S
MOUNTLAKE TERRACE, WA 98043-
2106 PACIFIC AVE #300
EDMONDS, WA 98020 -
NUMBER OF STORIES: I
TACOMA, WA 98402-
NUMBER OF DWELLING UNITS: 0
( ) - Ext.
(253) 627-4367 Ext.
(425) 774-4185 EXT:
3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
LICENSE #: WILCOC* 19400 EXP:12/10/2011
2474 SF BANK, includes retaining wall, plumbing and mechanical.
VALUATION: $270,903.00
PERMIT TYPE: Commercial
PERMIT GROUP: 45 - New Commercial
GRADING: Y CYDS: 290
TYPE OF CONSTRUCTION: VB
RETAINING WALL ROCKERY: Y
OCCUPANT GROUP: B
OCCUPANT LOAD: 30
FENCE: N 0 X 0 FT.)
CODE: 2009
OTHER: N ----- OTHER DESC:
ZONE: BP
NUMBER OF STORIES: I
VESTED DATE:
NUMBER OF DWELLING UNITS: 0
LOT #:
BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0
BASEMENT: 0 1 ST FLOOR: 2474 2ND FLOOR: 0
3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
FRONT SETBACK SIDE SETBACK R EAR SETBACK
REQUIRED: N 15 PROPOSED: 15 REQUIRED: S 15 PROPOSED: 36 JREQUI= PROPOSED:
HEIGHT ALLOWED:25 PROPOSED:24.59 I REQUIRED: W 15 PROPOSED: 15
SETBACK NOTES: Site is a triangle bounded by Paradise Lane on north, Edmonds Way on south, and RS -6 to the west
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO
PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S
COMPENSATION INSURANCE AND RCW 18:27.
IS A29tl'CATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTX AND ALL FEES ARE PAID.
k�o
ure Print Name 7 at Released By Date
�`
A ENTION
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF
OCCUPANCY HAS BEEN GRANTED. UBC 109/ IBC 10/ IRCI 10.
= ONLINE = APPLICANT = ASSESSOR = OTHER
STATUS: ISSUED BLD20110158
CONDITIONS
• SPECIAL INSPECTIONS ARE REQUIRED FOR THE FOLLOWING:
• Excavation, Grading, and Site Preparation
• Placement of Structural Fill and Compaction
• Soil Bearing Verification
• Foundation Drainage Installation
• Retaining Wall Construction and Drainage Installation
• Concrete Anchor Installation
• Lateral Wood
• Structural Steel Fabrication and Erection, Including High -Strength Bolting and Welding (Welders Must Be WABO
Certified)
• Prior to Final Inspection by the Building Division, Final Special Inspection Reports are Required From All Special
Inspectors.
• Submit Special Inspection Field reports on a weekly basis to the City Building Department.
• Lot line stakes must be in place at the time of foundation/setback inspection.
• All new, extended, re -built or relocated electrical utility and/or service shall be placed underground.
• Maximum Height 25 feet. The agent/contractor shall set up the equipment; establish the datum point and the point of average
grade. Call for inspection to verify. These items must be consistent with the approved plan. If the proposed height of a
building (as shown on the plans) is within 12 inches of the maximum height permitted for the zone an elevation survey is
required.
• Separate Permit Required For:
• Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309
• Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of
the building or structure. Check the job card for all required City inspections including final project approval and final
occupancy inspections.
• Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from
adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing
fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable.
• Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been
specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision
of city code or state law does not approve any items not to code specification.
• Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits
of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and I0:00am and 6:00pm on Saturdays,
excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must
comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
• Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold
harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to
modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any
ordinance provision.
• Contact Olympic View Water and Sewer District for water service from main to meter and meter installation.
• 48 hours notice is required when requesting your FINAL Engineering Inspection. 425-771-0220, ext. 1326.
• New and existing buildings shall have approved address numbers, building numbers or approved building identification
placed in a position that is plainly visible from the street or road fronting the property. Address numbers shall be Arabic
numerals or alphabet letters. Numbers shall be legible from the public way, at least 4 inches high with a %z inch min. stroke
width on a contrasting background.
• Call for locates of underground utilities prior to any excavation.
• Maintain erosion & sedimentation control per city standards.
• Maintain 10"" separation between the sanitary side sewer and the water service line.
• Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is
caused by or occurs during the permitted project.
• Owner/Contractor to provide Water Service Line asbuilt at final inspection. See City Standards for requirements.
• Owner/Contractor to provide Side Sewer asbuilt at final inspection. See City Standards for requirements.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE
PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION.
PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6)
BUILDING (425) 771-0220 EXT. 1333 1 ENGINEERING (425) 771-0220 EXT. 1326 1 FIRE (425) 775-7720
PUBLIC WORKS 425) 771-0235 1 PRE-TREATMENT 425) 672-5755 1 RECYCLING 425) 275-4801
When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection
being requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon.
• E -Pre -Con
• E -Erosion Control/Mobilization
• E -Traffic Control
• E -Storm Tightline
• E -Infiltration System
• E -Footing Drain Connection
• E -Double Check Detector Assem Vault
• E -Access Slope & Width Verification
• E -Pavement Compaction Test Report
• E -Pavement Striping
E -Mailbox Location, Pre -Install
• E-Fire/Aid Address Sign
E -Engineering Final
• E -Pre -Demo Erosion Control
• B-Preconstruction meeting
• B -Setbacks
• B -Footings
• B -Foundation Wall
•
13 -Isolated Footings/Piers
• B -Slab Insulation
• B -Plumb Ground Work
• B -Plumb Rough In
• B -Gas Test/Pipe
• B -Mechanical Rough In
•
13 -Exterior Wall Sheathing
•
13 -Roof Sheathing
• B -Ceiling Grid
• B -Height Verification
• B -Framing
• B-Insulation/Energy
• B-Sheetrock Nail
• B -Building Final
• F -Extinguishers
• F -Fire Dept Inspection
• F -Addressing Visibility
• F -Fire Final
P -Planning Final
• E-Curb/Gutter Post -Pour (coni/multi) .
• E -Sidewalk Post -Pour (comm/multi)
• E-Tightline Drain Connection
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE
PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION.
PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6)
BUILDING (425) 771-0220 EXT. 1333 1 ENGINEERING (425) 771-0220 EXT, 1326 1 FIRE (425) 775-7720
PUBLIC WORKS 425) 771-0235 1 PRE-TREATMENT 425) 672-5755 1 RECYCLING 425) 275-4801
When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection
beine reauested. Contact Name and Phone Number, Date Prefereed, and whether you prefer mornine or afternoon.
• E -Pre -Con
• E -Erosion Control/Mobilization
• E -Traffic Control
• E -Storm Tightline
• E -Infiltration System
• E -Footing Drain Connection
• E -Double Check Detector Assem Vault
• E -Access Slope & Width Verification
• E -Pavement Compaction Test Report
• E -Pavement Striping
• E -Mailbox Location, Pre -Install
• E-Fire/Aid Address Sign
• E -Engineering Final
• E -Pre -Demo Erosion Control
• B -P reconstruct ion meeting
• B -Setbacks
• B -Footings
• B -Foundation Wall
• B -Isolated Footings/Piers
• B -Slab Insulation
• B -Plumb Ground Work
• B -Plumb Rough In
• B -Gas Test/Pipe
• B -Mechanical Rough In
• 13 -Exterior Wall Sheathing
• B -Roof Sheathing
• B -Ceiling Grid
• B -Height Verification
• B -Framing
• 13-Insulation/Energy
• B-Sheetrock Nail
• B -Building Final
• F -Extinguishers
• F -Fire Dept Inspection
• F -Addressing Visibility
• F -Fire Final
• P -Planning Final
• E-Curb/Gutter Post -Pour (com/multi)
• E -Sidewalk Post -Pour (comm/multi)
• E-Tightline Drain Connection
,own
4,m
LL
0
z
w
W
ol
z
ca
0
era
O
wz
z
W
wi
o
4),�
0
E
m
aro
ui
>
LLI 0
z
Im
U)
V
c
m
m
0
E
V
LU
C%l
m
0.
0
0
0
Z,D� C4
ZrG
C4,
a= q
20'
4a
co
0
8,
CD
ol
z
ca
0
era
O
wz
W
wi
CYl
0
0
E
m
aro
ui
>
LLI 0
z
U)
V
c
m
m
0
E
V
LU
C%l
m
0.
0
0
0
ol
z
ca
0
z
O
wz
W
wi
CYl
0
W
W LL
aro
4-x
LLI 0
z
x
C;
Z,D� C4
ZrG
C4,
a= q
20'
4a
co
0
8,
CD
w
M
7
I
uj
0)�
CROW)LL'.
N
W,o
LU
R Vj
z x
0
_j -tb
-U)�7
W
0,-ui
CL cri
w
IL a.
wo/
Q�
0 co
0 U
c z 0 ri
3—Z 4 w
o -E --o
LU W LL
E 0
w < N=
0
E
m uj w
5 1%
o
L) 0
OW
v
ROUZ
Z
u.
Uzo
L OLD
ui
z 0
0.
M
Lu 0
Z w
IL
uj
�
N
o
AN "v
z azo
a
Ri
�
G)
{
D ry
m i�2c
°� plyl wo
TQ HS
D
m 999
011
isa� A�iR II l$,
a
55
a
Cn
1
m
z /
Scanned
,_;
oiN
O
1ST. SECURRY BANK
1
p
EDMOwDSS BRANCH
Scanned
,_;
RESUB
I1AY 13 2011
or t otic 13t 1v M
A off.
SPECIAL -INSPECTION AND TESTING AGREEMENT
'c="h
Permit#: i3LD201.1-0158 Project: First Security Banlc
sr, L7?c
Prior to issuan=ce of a permit, this form must be completed in its entirety and returned to tlae City for
apl)rovai. The completed form must have signatures of acknowledgment by all parties,
DXITMS AND RESPONSIBILITIES
Special Inspection Firm and Snecial Inspectors,, t
The Special Inspection Finn of &1,101CI '�V�._ will perform special
inspection for the following types of work {separate forms most be submitted if more than one firm is to be
employed):
❑ Reinforced Concrete
❑ Bolting in Concrete
❑ Prestressed Concrete
❑ Shotcrete
❑ Strtletuial Masonry
❑ Structural SteeUWelding
❑ Spray applied Fireproofing
❑ Smoke Control Systems
CI Lateral Wood
❑ Structural Observation
Gradinglsoils
❑ Other
❑ High Strength Bolting ❑ Other
All individual inspectors to be employed on this project will be WABO certified for the type of work they are to
inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO
certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the
inspector and the firm are qualified by education and experience to perform the worlc and testing required by the
project design and specifications.
The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions
and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection
records shall include:
G A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming worlc
shall be brought to the immediate attention of the contractor for resolution.
A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing
any nonconforming work and resolution of nonconforming items.
o A final report shall be submitted to the building department prior to the Certificate of Occupancy being
issued. This report will indicate that inspection and testing was completed hi colifomiance with the
approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must
be detailed in the final report.
i,.Zuilding New Folder 2010UbnnslSpC681 inspection farm,doc4171201 l
•
0
Contractor:
The contractor shall provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plan and specifications must be made available, at the jobsite for the use of the special
inspector*and the City inspector. The contractor sliall maintain ull daily inspection reports, on site, for review by
all parties.
The special inspection functions are considered to be in addition to the normal inspections performed by the City
and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be
poured or other work covered until approval is given by the City inspector.
Building Department:
The building department shall review any revisions and addenda. The City inspector will monitor the special
inspection functions for complianoe with the agieentont and the approved plans. The City inspector shall be
responsible for approving various stages ofeonstruction to be covered and for -work to proceed.
Desigg Professionals:
The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special
inspection required. and shall include a schedule for inspection and testing. The architect and/or engineer will
coordinate their revision and addenda process in such a way as to insure that all required City approvals are
obtained, prior to work shown on the revisions being performed in the field.
Owner:
The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or
agency.
ENFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved
plans and this document, may void this agreement and the Building Official's approval of the special inspector.
In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the
design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK
notice being posted on the project until nonconfonning items have been resolved.
ACKNOWLEDGIVMLNTS
I have read and agree to comply with the terms and conditions o his agreement, .
Owner: X—I Signature Date
Contractor: Hcy � .� e YK Signature Date: _Y12-11111
Arch./Eng: Signature Date: ,
Special Insp. �J�'� Meug 1"VV C--, Signature Date: 4 I L4 /
ACCEPTED ICOR ITIS CITY OI' EDMONDS BUILDING DEPT.
By: n bate:J/(*
LAUuildin{; Mew raldcr 201U1Forms4Spccinl inspcciinn hfmi_doe41712011
j. ..; I'A;P
I-Af 13 2011
601111114M -i- 1,�L'•�. •
of 2134,0
SPECIAL INSPECTION AND TESTING AGREEMENT
v �
41
I Permit #: BLD2011-0158 Project: First Security Bank
bar, 189
Priorto issuance of a permit, ibis form must be completed in its entirety and rettnwed to the City for
approval, The completed form must have signatures of acknowledgment by all parties.
DUTIES AND 11 SPONSIBILITIES
Special Inspection Flrin andSpecial Inspectors:
The Special Inspection firm of'
�
will perform special
inspection for the following types o4 work agotefrms submitted if more tan
one firm is to be
employed):
❑ Reinforced Concrete
Bolting in Concrete
❑ Prestressed Concrete
11 Shotcrete
❑ Structural Masottry
Structural Stee)/Welding
High Strength Bolting
❑ Spray applied Fireproofing
❑ Smoke Control Systems
X Lateral Wood
❑ Structural Observation
❑ Grading/soils
❑ Other
❑ Other
All individual inspectors to be employed on this project will be WABO certified for the type of work they are to
inspect. if inspection is for work that is not covered by the WABO categories, or the inspector is not WABO
certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the
inspector and the firm are qualified by education and experience to perform the work and testing required by the
project design and specifications.
The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions
and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection
records shall include:
A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming wmrk
shall be brought to the immediate attention of the contractor for resolution.
A weekly report shall be submitted to the City; detailing the inspections and testing perforated, listing
any nonconforming work and resolution of nonconforming items.
A final report shall be submitted to the building departmentprior to the Certificate of Occupancy being
issued. This report will indicate that inspection and testing was completed in conformance with the
approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must
be detailed in the final report.
1-\auilding New Polder 20101FormstSpec1a1 impaction forni.doc4nno 1 l
Contractor:
The contractor shall provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plan and specifications must be made available, at the jobsite for the use of the special
inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by
all parties.
The special inspection functions are considered to be in addition to the normal inspections performed by the City
and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be
poured or other work covered until approval is given by the City inspector.
Building Department:
The building department shall review any revisions and addenda. The City inspector will mouitor the special
inspection functions for compliance with the agreement and the approved plans. The City inspector shall be
responsible for approving various stages of construction to be covered and for work to proceed.
Desi n Professionals:
The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special
inspection required, and shall include a schedule for inspection and testing. The architect and/or engineer will
coordinate their revision and addenda process in such a way as to insure that all required City approvals are
obtained, prior to work shown on the revisions being performed in the field.
Owner:
The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or
agency.
ENIi ORCEM:ENT
A failure of the special inspector or firm to perform in keeping with the requirements of the ®C, the approved
plans and this document, may void this agreement and the Building Official's approval of the special inspector.
In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the
design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK
notice being posted on the project until nonconforming items have been resolved.
ACYNOWLEDGMENTS
I have read and agree to comply with the terms and conditions of this agreeme t.
Owner. �in�'�'= - / Signature / ! Ll�d // nate
• lC�)c Atvt S
Contractor Signature G�A� Date:
re /Eng:, Signature Date: U�
Special Insp.,T Signature
ACCEPTED FOR -CHIT: CITY OF EDMONDS BUILDING DEPT.
By: c Date:
1 1BoildinSWcw Fuldcr 20101FonnsLSpcciol inspcckian rormdoc4n12011
EVERGREEN REFRIGERATION, LLC
727 S KENYON ST.
SEATTLE, WA. 98108
206-763-1744
CONTR. # EVERG1201 D7
TEST AND BALANCE REPORT
Project: 1St Security Bank
Evergreen Job #: 511232
Date: September 2, 2011
Location: 00 /=jtM o'Id s I,/Al
FciMOnd c ) l✓A 980dio
Engineer: EVERGREEN REFRIGERATION LLC
Evergreen Refrigeration LLC, has balanced the system described in accordance
with the plans, specifications, and within the limitations of the equipment.
The testing, balancing, and adjusting has been performed in accordance with
industry standards. The results of these tests are herein recorded.
Commissioning Technician: < '-,{' 1^� S� \ $ �'✓
Date completed:
:7
EAREEN REFRIGERATION, LLC
AIR OUTLET TEST REPORT - SUPPLY Page 1
Project:
1st Security Bank
Job #:
511232
Date:
9/2/11
Unit #
Area Served
Outlet
Design
Target
Preliminary
Final
No
Type
Size
C.F.M.
C.F.M.
C.F.M.
C.F.M.
C.F.M.
RTU -1
Central
S1.1
30ORS
12x6
150
1
,D
/ e f C-
} L- !'
Central
S1.2
30ORS
12x6
150
i G'
1'75r'o
Central
S1.3
MCD
6
90
Central
S 1.4
30ORS
12x6
150
r'
�L7
j
Central
S1.5
30ORS
12x6
150
Northern
S1.6
MCD
6
125
Northern
S1.7
MCD
6
125
Central
S1.8
30ORS
12x6
150
E'
Central
S1.9
30ORS
12x6
150
Western
S1.10
MCD
8
180
" r
.
Western
S1.11
30ORS
6x5
30
Central
S1.12
30ORS
12x6
150
Southern
S1.13
30ORS
6x5
50
j,
Total CFM
1650
OSA CFM
330
Tonnage
4.1
AIR OUTLET TEST REPORT - SUPPLY
Project:
1st Security Bank
Job #:
511232
Date:
9/2/11
Page -2
Unit #
Area Served
Outlet
Design
Target
Preliminary
Final
No
Type
Size
C.F.M.
C.F.M.
C.F.M.
C.F.M.
C.F.M.
RTU -2
SE
S2.1
MCD
8
175
1 V-1
SE
S2.2
MCD
8
175
/ 'J
Eastern
S2.3
MCD
6
65
450
-5-)
i {�
Eastern
S2.4
MCD
4
30
3 3
7,
'7
Eastern
52.5
MCD
4
30
Central
S2.6
MCD
6
90
Eastern
S2.7
MCD
4
60
G%
Northern
S2.8
MCD
6
50S
'`,'J
; :
t
Western
S2.9
MCD
8
170
/,4>>
Western
S2.10
MCD
6
120
Total CFM
965
I/ "o I
OSA CFM
193
Tonnage
2.4
October 18, 2011
Jeff Martin
Wilcox Construction
234 5' Ave. S.
Edmonds, WA: 98020
Re: Bank Building Ridge Height
Dear Jeff,
This letter states the ridge height elevation and the difference between the ridge height and the
existing ground adjacent to the building.
On 9-20-1.1 by field survey methods we located the. ridge height of the new Bank building at
620 Edmonds Way. We found the ridge height to be at elevation 300.3 and the adjacent ground
at 277.0. The benchmark is one that we have used for the site construction and is on NAVD 88
datum.
The difference in height is 23.3 feet.
Also, see the enclosed map dated 10-7-11.
Please contact me if you have any questions or comments.
Sincerely,
Tim Griffin, P
A G
7537 11th Ave. NE Seattle, WA 98115 Phone 206-525-3660 Fax: 206-525-0334
www.tyeesurveyors.com
BANK BUILDING
(NEW CONSTRUCTION)
620 EDMONDS WAY
EDMONDS, WA 98020
X
GROUND
EL= 277.0
RIDGE
/-EL=300.3
x
Scale 1 " = 20' 4
DATUM: NAVD-88 N
FOUNDATION
TF
1. THE INTENT OF THISDRAWING IS THE SHOW THE ELEVATION OF THE
RIDGE HEIGHT AND A REPRESENTATIVE EXISTING GROUND ELEVATION
2. OBSERVED 9-20-11
3. SITE BENCH= .6dB NAIL IN POWER POLE EL=282.12
/a•i8•!/
RIDGE HEIGHT
for
WILCOX CONSTRUCTION
SHEET:
1 OF 1 TVEE T�yee Surve ors
SURNEVOR•s PRO SSIONAL LAND ZIRVEYORS
SCALE: 7537 11TH AVE. NE, SEATTLE, WA. 98115 (206) 525-3660
1"=20'
DRAWN BY: CHKO BY: DATE: JOB NO.:
RG TG 10-7-11 11082
SIGNAGE BY
OTHERS
0
x7!5"s
0 2' 4' 8'
r—lower— =09
SCALE: 1/4" = 1'-0"
9�2j
MAX HT. 122.78.
003 ACT. HT. 122.37
380.36
6X8,
ARCH. GRADE
PAR 2X8,
ARCH. GRADE
013
014
013
Y
DATE
Q =
B' Nm
10139
m Z
10139A7.01.DWG
ow ru
ELEVATIONS
m
coVJ Q
o
N
co
LUZo�
w
U)pgo
Z
WLU
R
o
RLMM
013
014
013
DATE
MAY 12, 2011
B' Nm
10139
Amo FM
10139A7.01.DWG
ow ru
ELEVATIONS
as.3�
360.80
2-1 5.31
-------------
2y.g9 Dkitr A) I WT.
i�Jo►f� �Y� -
s,�e_ . (A a 0-cA - R Pc%jcf Pole- Gr-,d�
EL too
® BCRA
A7.01
BID SET
07/15/2011 15:02 4258275424 ASSOC. EARTH SCIENCE
Associated Earth Sciences, Inc.
Technical Memorandum
Date: 15 July 2011
Page 1
PAGE 01/01
To: Edmonds Building Department Project Name: Edmonds First Security Bank
1125-77/- 02,Z l 1
°
Associated Earth Sciences, Inc. BLD2011-0158
prom: Attn. Bruce Guenzler Project No: AESI KE1.00209B
•
Subject:
Weekly Special Inspection Summary
°
As required by the Special Inspection and Testing Agreement, this memorandum sununarizes geotechnical
engineering special inspection activities for there �erenccd project for the previous week. Fach site visit by AESI was
documented with a. daily field report distributed to the design and construction team.
Site clearing and grading activities were started, AESI visited dic site to observe initial progress and collect soil
°
samples for laboratory maximum density testing.
RECEIVED
JUL 15 2011
DEVELOPMENT SERVICES CTR. °
CITY OF EDMONDS
• Kirkland Office • 911 Fifth Avenue, Suite 1.00 • Kirkland, WA 98033 • P 1 (425) 827-7701 • F 1 (425) 827-5424'
Everett Once • 2917.1/7. Hewitt Avenue, Suite 2. • Everett, WA 98201. • P 1 (425) 259.0522 ° F 1 (425) 252-34.08 `
Tacoma Oflfcrl'• 805 Martin Luther King.ir. Way • Taroma, WA 9z?AUS • P � (2531722 7.992 • F 1 (253) 72'2-2993
vArvw.ae,sg�o.corn
0
MAYES TENG ENGINEERS, INC.
October 14, 2011
City of Edmonds
121 5th Avenue N
Edmonds, WA 98020-3146
Attention: Building Department
Re: First Security Bank Edmonds Branch Final Letter
620 Edmonds Way Permit No. BLD2011-0158
Edmonds, WA
Project No. L11163
Paft►bombe
7911 NE33fd Dhe
5190
Paft-40897211
Ph503281.7515
b(503291.7579
This is to inform you that registered special inspections have been completed for this project as per
our reports, copies of which have been sent to you.
Special inspection was provided for:
• Reinforced Concrete
• Structural Steel Fabrication
• Lateral Framing
To the best of our knowledge, all work inspected was either performed in accordance with, or
corrected to conform to, the city approved drawings, or engineer approved changes.
We trust this provides you with the information that you require. Should you have any questions
please call us at 425/742-9360.
Sincerely,
Mayes Testing Engineer, Inc.
T1-9
Timothy G. Beckerle, P.E.
Branch Manager
Ss�f)ff�De
202 0a&rVabyRood
58110
LPV44V Aseais
ph425.742-MM
t3K425.745.1737
Tbemeofte
100?9S.Tao mV4
SUFE -2
T A98488
ph=584253584.3i1D
f3(25&584Z/07
Re: First Security Bank Edmonds Branch Final Letter
620 Edmonds Way Permit No. BLD2011-0158
Edmonds, WA
Project No. L11163
Paft►bombe
7911 NE33fd Dhe
5190
Paft-40897211
Ph503281.7515
b(503291.7579
This is to inform you that registered special inspections have been completed for this project as per
our reports, copies of which have been sent to you.
Special inspection was provided for:
• Reinforced Concrete
• Structural Steel Fabrication
• Lateral Framing
To the best of our knowledge, all work inspected was either performed in accordance with, or
corrected to conform to, the city approved drawings, or engineer approved changes.
We trust this provides you with the information that you require. Should you have any questions
please call us at 425/742-9360.
Sincerely,
Mayes Testing Engineer, Inc.
T1-9
Timothy G. Beckerle, P.E.
Branch Manager
• 0
ap EDyjo� Inspection Comments
BLD20110158 45 - New Commercial
Applied: 03/09/2011 Issued: 07/01/2011 Expires: 07/01/2012
Address: 620 EDMONDS WAY, EDMONDS
INSPECTION
DATE
INSPECTOR
ACTIONS r<:.
1000 - E -Pre -Con
07/12/2011
ZULAUF
CMP
Comment: See Attached Meeting Notes.
1001 - E -Erosion Control/Mobilization
07/19/2011
ZULAUF
COM
Comment: tesc ok
1001 - E -Erosion Control/Mobilization
07/25/2011
ZULAUF
COM
Comment: tesc ok, excavating foundation
1001 - E -Erosion Control/Mobilization
01/11/2012
ZULAUF
COM
Comment: landscaping company not done yet.
1001 - E -Erosion Control/Mobilization
02/01/2012
ZULAUF
CMP
Comment:
1013 - E -Storm Tightline
08/11/2011
LAMBERTJ
PAR
Comment: OK to backfill - Verified T/L around building,
but not connected at this
time.
1013 - E -Storm Tightline
01/10/2012
ZULAUF
CMP
Comment: T/I clean outs at grade and capped.
1016 - E -Infiltration System
12/08/2011
ZULAUF
COM
Comment: Meeting regarding installation of storm system
1016 - E -Infiltration System
12/09/2011
ZULAUF
COM
Comment: cb install-ok to b/f
1016 - E -Infiltration System
12/13/2011
ZULAUF
COM
Comment: Geotech on site. Adequate soils depth for test pits. drainage as expected. Very sandy.
1016 - E -Infiltration System
12/14/2011
ZULAUF
COM
Comment: installation of Contech system
1016 - E -Infiltration System
12/14/2011
ZULAUF
CMP
Comment: system cb ok to b/f
1036 - E -Double Check Detector Assem Vault
01/11/2012
ZULAUF
CMP
Comment: OVWSD inspected-ok
1048 - E -Access Slope & Width Verification
01/10/2012
ZULAUF
CMP
Comment: ok to final
1051 - E -Pavement Striping
01/11/2012
ZULAUF
CMP
Comment: ok to final
1060 - E-Fire/Aid Address Sign
01/11/2012
ZULAUF
CMP
Comment: ok at final
1077 - E -Engineering Final
01/11/2012
ZULAUF
COM
Comment: landscaping and right of way completion
needed for final approval.
3/5/2012 1:25:52 PM 121 5th Ave, Edmonds Washington - Phone: (425)
771-0220
Page 1 of 3
INSPECTION __- --
;DATE .
:'INSPECTOR
1077 - E -Engineering Final
02/01/2012
ZULAUF
COM
Comment: all improvements complete -waiting for as-builts
1077 - E -Engineering Final
03/05/2012
ZULAUF
CMP
Comment: Received asbuilts-ok to final
1080 - E -Pre -Demo Erosion Control
01/10/2012
ZULAUF
CMP
Comment: same tesc-ok
1101 - B-Preconstruction meeting
07/11/2011
STEINIKE
CMP
Comment:
1108 - B -Footings
07/28/2011
STEINIKE
CMP
Comment:
1110 - B -Foundation Wall
08/04/2011
STEINIKE
CMP
Comment: Okbpending special inspection reports.
1114 - B -Isolated Footings/Piers
08/16/2011
STEINIKE
CMP
Comment:
1118 - B -Slab Insulation
08/09/2011
STEINIKE
CMP
Comment:
1120 - B -Plumb Ground Work
08/11/2011
STEINIKE
CMP
Comment:
1126 - B -Plumb Rough In
09/21/2011
LAWLER
CMP
Comment:
1128 - B -Gas Test/Pipe
09/21/2011
LAWLER
CMP
Comment:
1130 - B -Mechanical Rough In
09/26/2011
STEINIKE
CMP
Comment:
1132 - B -Exterior Wall Sheathing
09/09/2011
STEINIKE
CMP
Comment:
1133 - B -Roof Sheathing
09/09/2011
STEINIKE
CMP
Comment:
1138 - B -Ceiling Grid
11/09/2011
LAWLER
CMP
Comment:
1140 - B -Height Verification
11/22/2011
STEINIKE
CMP
Comment:
1142 - B -Framing
09/30/2011
LAWLER
CMP
Comment: height survey on its way
1146 - B-Insulation/Energy
10/11/2011
STEINIKE
COR
Comment: Not ready!
1146 - B-Insulation/Energy
10/12/2011
STEINIKE
CMP
Comment:
3/5/2012 1:25:52 PM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220
Page 2 of 3
• 10
INSPECTION DATE, INSPECTOR ACT,ION�,, -_
1158 - B -Building Final 11/22/2011 STEINIKE CMP
Comment: Ok for new building only!
Egineering and planning will final when exisiting structure is removed.
1955 - F -Extinguishers
01/23/2012
SMITHM
CMP
Comment: APPROVED
1975 - F -Fire Dept Inspection
01/23/2012
SMITHM
CMP
Comment: APPROVED
1980 - F -Addressing Visibility
01/23/2012
SMITHM
CMP
Comment: APPROVED
1985 - F -Fire Final
01/23/2012
SMITHM
CMP
Comment: APPROVED
2000 - P -Planning Final
02/02/2012
CLUGSTON
CMP
Comment: Signed off job card
3/5/2012 1:25:52 PM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 3 of 3