Loading...
BLD20110158.pdf0 0 W OF ED4f CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 ��le. I g90 PHONE: (425) 771-0220 - FAX: (425) 771-0221 STATUS: ISSUED 7/1/2011 Permit #: BLD20110158`; D BUILDING PERMIT Expiration Date: 7/1/2012 ProjectAddress: 620 EDMONDSMAY, EDMONDS� Parcel No: 27032500307300 2474 SF BANK, includes retaining wall, plumbing and mechanical. VALUATION: $270,903.00 PERMIT TYPE: Commercial PERMIT GROUP: 45 - New Commercial GRADING: Y CYDS: 290 FIRST SECURITY BANK BCRA WILCOX CONSTRUCTION 6920 200TH ST SW STE 300 MAT BERGMAN 234 5TH AVE S MOUNTLAKE TERRACE, WA 98043- 2106 PACIFIC AVE #300 EDMONDS, WA 98020 - NUMBER OF STORIES: I TACOMA, WA 98402- NUMBER OF DWELLING UNITS: 0 ( ) - Ext. (253) 627-4367 Ext. (425) 774-4185 EXT: 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 LICENSE #: WILCOC* 19400 EXP:12/10/2011 2474 SF BANK, includes retaining wall, plumbing and mechanical. VALUATION: $270,903.00 PERMIT TYPE: Commercial PERMIT GROUP: 45 - New Commercial GRADING: Y CYDS: 290 TYPE OF CONSTRUCTION: VB RETAINING WALL ROCKERY: Y OCCUPANT GROUP: B OCCUPANT LOAD: 30 FENCE: N 0 X 0 FT.) CODE: 2009 OTHER: N ----- OTHER DESC: ZONE: BP NUMBER OF STORIES: I VESTED DATE: NUMBER OF DWELLING UNITS: 0 LOT #: BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 BASEMENT: 0 1 ST FLOOR: 2474 2ND FLOOR: 0 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 FRONT SETBACK SIDE SETBACK R EAR SETBACK REQUIRED: N 15 PROPOSED: 15 REQUIRED: S 15 PROPOSED: 36 JREQUI= PROPOSED: HEIGHT ALLOWED:25 PROPOSED:24.59 I REQUIRED: W 15 PROPOSED: 15 SETBACK NOTES: Site is a triangle bounded by Paradise Lane on north, Edmonds Way on south, and RS -6 to the west I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. IS A29tl'CATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTX AND ALL FEES ARE PAID. k�o ure Print Name 7 at Released By Date �` A ENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC 109/ IBC 10/ IRCI 10. = ONLINE = APPLICANT = ASSESSOR = OTHER STATUS: ISSUED BLD20110158 CONDITIONS • SPECIAL INSPECTIONS ARE REQUIRED FOR THE FOLLOWING: • Excavation, Grading, and Site Preparation • Placement of Structural Fill and Compaction • Soil Bearing Verification • Foundation Drainage Installation • Retaining Wall Construction and Drainage Installation • Concrete Anchor Installation • Lateral Wood • Structural Steel Fabrication and Erection, Including High -Strength Bolting and Welding (Welders Must Be WABO Certified) • Prior to Final Inspection by the Building Division, Final Special Inspection Reports are Required From All Special Inspectors. • Submit Special Inspection Field reports on a weekly basis to the City Building Department. • Lot line stakes must be in place at the time of foundation/setback inspection. • All new, extended, re -built or relocated electrical utility and/or service shall be placed underground. • Maximum Height 25 feet. The agent/contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspection to verify. These items must be consistent with the approved plan. If the proposed height of a building (as shown on the plans) is within 12 inches of the maximum height permitted for the zone an elevation survey is required. • Separate Permit Required For: • Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309 • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and I0:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. • Contact Olympic View Water and Sewer District for water service from main to meter and meter installation. • 48 hours notice is required when requesting your FINAL Engineering Inspection. 425-771-0220, ext. 1326. • New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible from the street or road fronting the property. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be legible from the public way, at least 4 inches high with a %z inch min. stroke width on a contrasting background. • Call for locates of underground utilities prior to any excavation. • Maintain erosion & sedimentation control per city standards. • Maintain 10"" separation between the sanitary side sewer and the water service line. • Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is caused by or occurs during the permitted project. • Owner/Contractor to provide Water Service Line asbuilt at final inspection. See City Standards for requirements. • Owner/Contractor to provide Side Sewer asbuilt at final inspection. See City Standards for requirements. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) BUILDING (425) 771-0220 EXT. 1333 1 ENGINEERING (425) 771-0220 EXT. 1326 1 FIRE (425) 775-7720 PUBLIC WORKS 425) 771-0235 1 PRE-TREATMENT 425) 672-5755 1 RECYCLING 425) 275-4801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon. • E -Pre -Con • E -Erosion Control/Mobilization • E -Traffic Control • E -Storm Tightline • E -Infiltration System • E -Footing Drain Connection • E -Double Check Detector Assem Vault • E -Access Slope & Width Verification • E -Pavement Compaction Test Report • E -Pavement Striping E -Mailbox Location, Pre -Install • E-Fire/Aid Address Sign E -Engineering Final • E -Pre -Demo Erosion Control • B-Preconstruction meeting • B -Setbacks • B -Footings • B -Foundation Wall • 13 -Isolated Footings/Piers • B -Slab Insulation • B -Plumb Ground Work • B -Plumb Rough In • B -Gas Test/Pipe • B -Mechanical Rough In • 13 -Exterior Wall Sheathing • 13 -Roof Sheathing • B -Ceiling Grid • B -Height Verification • B -Framing • B-Insulation/Energy • B-Sheetrock Nail • B -Building Final • F -Extinguishers • F -Fire Dept Inspection • F -Addressing Visibility • F -Fire Final P -Planning Final • E-Curb/Gutter Post -Pour (coni/multi) . • E -Sidewalk Post -Pour (comm/multi) • E-Tightline Drain Connection THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) BUILDING (425) 771-0220 EXT. 1333 1 ENGINEERING (425) 771-0220 EXT, 1326 1 FIRE (425) 775-7720 PUBLIC WORKS 425) 771-0235 1 PRE-TREATMENT 425) 672-5755 1 RECYCLING 425) 275-4801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection beine reauested. Contact Name and Phone Number, Date Prefereed, and whether you prefer mornine or afternoon. • E -Pre -Con • E -Erosion Control/Mobilization • E -Traffic Control • E -Storm Tightline • E -Infiltration System • E -Footing Drain Connection • E -Double Check Detector Assem Vault • E -Access Slope & Width Verification • E -Pavement Compaction Test Report • E -Pavement Striping • E -Mailbox Location, Pre -Install • E-Fire/Aid Address Sign • E -Engineering Final • E -Pre -Demo Erosion Control • B -P reconstruct ion meeting • B -Setbacks • B -Footings • B -Foundation Wall • B -Isolated Footings/Piers • B -Slab Insulation • B -Plumb Ground Work • B -Plumb Rough In • B -Gas Test/Pipe • B -Mechanical Rough In • 13 -Exterior Wall Sheathing • B -Roof Sheathing • B -Ceiling Grid • B -Height Verification • B -Framing • 13-Insulation/Energy • B-Sheetrock Nail • B -Building Final • F -Extinguishers • F -Fire Dept Inspection • F -Addressing Visibility • F -Fire Final • P -Planning Final • E-Curb/Gutter Post -Pour (com/multi) • E -Sidewalk Post -Pour (comm/multi) • E-Tightline Drain Connection ,own 4,m LL 0 z w W ol z ca 0 era O wz z W wi o 4),� 0 E m aro ui > LLI 0 z Im U) V c m m 0 E V LU C%l m 0. 0 0 0 Z,D� C4 ZrG C4, a= q 20' 4a co 0 8, CD ol z ca 0 era O wz W wi CYl 0 0 E m aro ui > LLI 0 z U) V c m m 0 E V LU C%l m 0. 0 0 0 ol z ca 0 z O wz W wi CYl 0 W W LL aro 4-x LLI 0 z x C; Z,D� C4 ZrG C4, a= q 20' 4a co 0 8, CD w M 7 I uj 0)� CROW)LL'. N W,o LU R Vj z x 0 _j -tb -U)�7 W 0,-ui CL cri w IL a. wo/ Q� 0 co 0 U c z 0 ri 3—Z 4 w o -E --o LU W LL E 0 w < N= 0 E m uj w 5 1% o L) 0 OW v ROUZ Z u. Uzo L OLD ui z 0 0. M Lu 0 Z w IL uj � N o AN "v z azo a Ri � G) { D ry m i�2c °� plyl wo TQ HS D m 999 011 isa� A�iR II l$, a 55 a Cn 1 m z / Scanned ,_; oiN O 1ST. SECURRY BANK 1 p EDMOwDSS BRANCH Scanned ,_; RESUB I1AY 13 2011 or t otic 13t 1v M A off. SPECIAL -INSPECTION AND TESTING AGREEMENT 'c="h Permit#: i3LD201.1-0158 Project: First Security Banlc sr, L7?c Prior to issuan=ce of a permit, this form must be completed in its entirety and returned to tlae City for apl)rovai. The completed form must have signatures of acknowledgment by all parties, DXITMS AND RESPONSIBILITIES Special Inspection Firm and Snecial Inspectors,, t The Special Inspection Finn of &1,101CI '�V�._ will perform special inspection for the following types of work {separate forms most be submitted if more than one firm is to be employed): ❑ Reinforced Concrete ❑ Bolting in Concrete ❑ Prestressed Concrete ❑ Shotcrete ❑ Strtletuial Masonry ❑ Structural SteeUWelding ❑ Spray applied Fireproofing ❑ Smoke Control Systems CI Lateral Wood ❑ Structural Observation Gradinglsoils ❑ Other ❑ High Strength Bolting ❑ Other All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector and the firm are qualified by education and experience to perform the worlc and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall include: G A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming worlc shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. o A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed hi colifomiance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. i,.Zuilding New Folder 2010UbnnslSpC681 inspection farm,doc4171201 l • 0 Contractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at the jobsite for the use of the special inspector*and the City inspector. The contractor sliall maintain ull daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. Building Department: The building department shall review any revisions and addenda. The City inspector will monitor the special inspection functions for complianoe with the agieentont and the approved plans. The City inspector shall be responsible for approving various stages ofeonstruction to be covered and for -work to proceed. Desigg Professionals: The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required. and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to insure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconfonning items have been resolved. ACKNOWLEDGIVMLNTS I have read and agree to comply with the terms and conditions o his agreement, . Owner: X—I Signature Date Contractor: Hcy � .� e YK Signature Date: _Y12-11111 Arch./Eng: Signature Date: , Special Insp. �J�'� Meug 1"VV C--, Signature Date: 4 I L4 / ACCEPTED ICOR ITIS CITY OI' EDMONDS BUILDING DEPT. By: n bate:J/(* LAUuildin{; Mew raldcr 201U1Forms4Spccinl inspcciinn hfmi_doe41712011 j. ..; I'A;P I-Af 13 2011 601111114M -i- 1,�L'•�. • of 2134,0 SPECIAL INSPECTION AND TESTING AGREEMENT v � 41 I Permit #: BLD2011-0158 Project: First Security Bank bar, 189 Priorto issuance of a permit, ibis form must be completed in its entirety and rettnwed to the City for approval, The completed form must have signatures of acknowledgment by all parties. DUTIES AND 11 SPONSIBILITIES Special Inspection Flrin andSpecial Inspectors: The Special Inspection firm of' � will perform special inspection for the following types o4 work agotefrms submitted if more tan one firm is to be employed): ❑ Reinforced Concrete Bolting in Concrete ❑ Prestressed Concrete 11 Shotcrete ❑ Structural Masottry Structural Stee)/Welding High Strength Bolting ❑ Spray applied Fireproofing ❑ Smoke Control Systems X Lateral Wood ❑ Structural Observation ❑ Grading/soils ❑ Other ❑ Other All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. if inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector and the firm are qualified by education and experience to perform the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall include: A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming wmrk shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City; detailing the inspections and testing perforated, listing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building departmentprior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. 1-\auilding New Polder 20101FormstSpec1a1 impaction forni.doc4nno 1 l Contractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at the jobsite for the use of the special inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. Building Department: The building department shall review any revisions and addenda. The City inspector will mouitor the special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Desi n Professionals: The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required, and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to insure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENIi ORCEM:ENT A failure of the special inspector or firm to perform in keeping with the requirements of the ®C, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACYNOWLEDGMENTS I have read and agree to comply with the terms and conditions of this agreeme t. Owner. �in�'�'= - / Signature / ! Ll�d // nate • lC�)c Atvt S Contractor Signature G�A� Date: re /Eng:, Signature Date: U� Special Insp.,T Signature ACCEPTED FOR -CHIT: CITY OF EDMONDS BUILDING DEPT. By: c Date: 1 1BoildinSWcw Fuldcr 20101FonnsLSpcciol inspcckian rormdoc4n12011 EVERGREEN REFRIGERATION, LLC 727 S KENYON ST. SEATTLE, WA. 98108 206-763-1744 CONTR. # EVERG1201 D7 TEST AND BALANCE REPORT Project: 1St Security Bank Evergreen Job #: 511232 Date: September 2, 2011 Location: 00 /=jtM o'Id s I,/Al FciMOnd c ) l✓A 980dio Engineer: EVERGREEN REFRIGERATION LLC Evergreen Refrigeration LLC, has balanced the system described in accordance with the plans, specifications, and within the limitations of the equipment. The testing, balancing, and adjusting has been performed in accordance with industry standards. The results of these tests are herein recorded. Commissioning Technician: < '-,{' 1^� S� \ $ �'✓ Date completed: :7 EAREEN REFRIGERATION, LLC AIR OUTLET TEST REPORT - SUPPLY Page 1 Project: 1st Security Bank Job #: 511232 Date: 9/2/11 Unit # Area Served Outlet Design Target Preliminary Final No Type Size C.F.M. C.F.M. C.F.M. C.F.M. C.F.M. RTU -1 Central S1.1 30ORS 12x6 150 1 ,D / e f C- } L- !' Central S1.2 30ORS 12x6 150 i G' 1'75r'o Central S1.3 MCD 6 90 Central S 1.4 30ORS 12x6 150 r' �L7 j Central S1.5 30ORS 12x6 150 Northern S1.6 MCD 6 125 Northern S1.7 MCD 6 125 Central S1.8 30ORS 12x6 150 E' Central S1.9 30ORS 12x6 150 Western S1.10 MCD 8 180 " r . Western S1.11 30ORS 6x5 30 Central S1.12 30ORS 12x6 150 Southern S1.13 30ORS 6x5 50 j, Total CFM 1650 OSA CFM 330 Tonnage 4.1 AIR OUTLET TEST REPORT - SUPPLY Project: 1st Security Bank Job #: 511232 Date: 9/2/11 Page -2 Unit # Area Served Outlet Design Target Preliminary Final No Type Size C.F.M. C.F.M. C.F.M. C.F.M. C.F.M. RTU -2 SE S2.1 MCD 8 175 1 V-1 SE S2.2 MCD 8 175 / 'J Eastern S2.3 MCD 6 65 450 -5-) i {� Eastern S2.4 MCD 4 30 3 3 7, '7 Eastern 52.5 MCD 4 30 Central S2.6 MCD 6 90 Eastern S2.7 MCD 4 60 G% Northern S2.8 MCD 6 50S '`,'J ; : t Western S2.9 MCD 8 170 /,4>> Western S2.10 MCD 6 120 Total CFM 965 I/ "o I OSA CFM 193 Tonnage 2.4 October 18, 2011 Jeff Martin Wilcox Construction 234 5' Ave. S. Edmonds, WA: 98020 Re: Bank Building Ridge Height Dear Jeff, This letter states the ridge height elevation and the difference between the ridge height and the existing ground adjacent to the building. On 9-20-1.1 by field survey methods we located the. ridge height of the new Bank building at 620 Edmonds Way. We found the ridge height to be at elevation 300.3 and the adjacent ground at 277.0. The benchmark is one that we have used for the site construction and is on NAVD 88 datum. The difference in height is 23.3 feet. Also, see the enclosed map dated 10-7-11. Please contact me if you have any questions or comments. Sincerely, Tim Griffin, P A G 7537 11th Ave. NE Seattle, WA 98115 Phone 206-525-3660 Fax: 206-525-0334 www.tyeesurveyors.com BANK BUILDING (NEW CONSTRUCTION) 620 EDMONDS WAY EDMONDS, WA 98020 X GROUND EL= 277.0 RIDGE /-EL=300.3 x Scale 1 " = 20' 4 DATUM: NAVD-88 N FOUNDATION TF 1. THE INTENT OF THISDRAWING IS THE SHOW THE ELEVATION OF THE RIDGE HEIGHT AND A REPRESENTATIVE EXISTING GROUND ELEVATION 2. OBSERVED 9-20-11 3. SITE BENCH= .6dB NAIL IN POWER POLE EL=282.12 /a•i8•!/ RIDGE HEIGHT for WILCOX CONSTRUCTION SHEET: 1 OF 1 TVEE T�yee Surve ors SURNEVOR•s PRO SSIONAL LAND ZIRVEYORS SCALE: 7537 11TH AVE. NE, SEATTLE, WA. 98115 (206) 525-3660 1"=20' DRAWN BY: CHKO BY: DATE: JOB NO.: RG TG 10-7-11 11082 SIGNAGE BY OTHERS 0 x7!5"s 0 2' 4' 8' r—lower— =09 SCALE: 1/4" = 1'-0" 9�2j MAX HT. 122.78. 003 ACT. HT. 122.37 380.36 6X8, ARCH. GRADE PAR 2X8, ARCH. GRADE 013 014 013 Y DATE Q = B' Nm 10139 m Z 10139A7.01.DWG ow ru ELEVATIONS m coVJ Q o N co LUZo� w U)pgo Z WLU R o RLMM 013 014 013 DATE MAY 12, 2011 B' Nm 10139 Amo FM 10139A7.01.DWG ow ru ELEVATIONS as.3� 360.80 2-1 5.31 ------------- 2y.g9 Dkitr A) I WT. i�Jo►f� �Y� - s,�e_ . (A a 0-cA - R Pc%jcf Pole- Gr-,d� EL too ® BCRA A7.01 BID SET 07/15/2011 15:02 4258275424 ASSOC. EARTH SCIENCE Associated Earth Sciences, Inc. Technical Memorandum Date: 15 July 2011 Page 1 PAGE 01/01 To: Edmonds Building Department Project Name: Edmonds First Security Bank 1125-77/- 02,Z l 1 ° Associated Earth Sciences, Inc. BLD2011-0158 prom: Attn. Bruce Guenzler Project No: AESI KE1.00209B • Subject: Weekly Special Inspection Summary ° As required by the Special Inspection and Testing Agreement, this memorandum sununarizes geotechnical engineering special inspection activities for there �erenccd project for the previous week. Fach site visit by AESI was documented with a. daily field report distributed to the design and construction team. Site clearing and grading activities were started, AESI visited dic site to observe initial progress and collect soil ° samples for laboratory maximum density testing. RECEIVED JUL 15 2011 DEVELOPMENT SERVICES CTR. ° CITY OF EDMONDS • Kirkland Office • 911 Fifth Avenue, Suite 1.00 • Kirkland, WA 98033 • P 1 (425) 827-7701 • F 1 (425) 827-5424' Everett Once • 2917.1/7. Hewitt Avenue, Suite 2. • Everett, WA 98201. • P 1 (425) 259.0522 ° F 1 (425) 252-34.08 ` Tacoma Oflfcrl'• 805 Martin Luther King.ir. Way • Taroma, WA 9z?AUS • P � (2531722 7.992 • F 1 (253) 72'2-2993 vArvw.ae,sg�o.corn 0 MAYES TENG ENGINEERS, INC. October 14, 2011 City of Edmonds 121 5th Avenue N Edmonds, WA 98020-3146 Attention: Building Department Re: First Security Bank Edmonds Branch Final Letter 620 Edmonds Way Permit No. BLD2011-0158 Edmonds, WA Project No. L11163 Paft►bombe 7911 NE33fd Dhe 5190 Paft-40897211 Ph503281.7515 b(503291.7579 This is to inform you that registered special inspections have been completed for this project as per our reports, copies of which have been sent to you. Special inspection was provided for: • Reinforced Concrete • Structural Steel Fabrication • Lateral Framing To the best of our knowledge, all work inspected was either performed in accordance with, or corrected to conform to, the city approved drawings, or engineer approved changes. We trust this provides you with the information that you require. Should you have any questions please call us at 425/742-9360. Sincerely, Mayes Testing Engineer, Inc. T1-9 Timothy G. Beckerle, P.E. Branch Manager Ss�f)ff�De 202 0a&rVabyRood 58110 LPV44V Aseais ph425.742-MM t3K425.745.1737 Tbemeofte 100?9S.Tao mV4 SUFE -2 T A98488 ph=584253584.3i1D f3(25&584Z/07 Re: First Security Bank Edmonds Branch Final Letter 620 Edmonds Way Permit No. BLD2011-0158 Edmonds, WA Project No. L11163 Paft►bombe 7911 NE33fd Dhe 5190 Paft-40897211 Ph503281.7515 b(503291.7579 This is to inform you that registered special inspections have been completed for this project as per our reports, copies of which have been sent to you. Special inspection was provided for: • Reinforced Concrete • Structural Steel Fabrication • Lateral Framing To the best of our knowledge, all work inspected was either performed in accordance with, or corrected to conform to, the city approved drawings, or engineer approved changes. We trust this provides you with the information that you require. Should you have any questions please call us at 425/742-9360. Sincerely, Mayes Testing Engineer, Inc. T1-9 Timothy G. Beckerle, P.E. Branch Manager • 0 ap EDyjo� Inspection Comments BLD20110158 45 - New Commercial Applied: 03/09/2011 Issued: 07/01/2011 Expires: 07/01/2012 Address: 620 EDMONDS WAY, EDMONDS INSPECTION DATE INSPECTOR ACTIONS r<:. 1000 - E -Pre -Con 07/12/2011 ZULAUF CMP Comment: See Attached Meeting Notes. 1001 - E -Erosion Control/Mobilization 07/19/2011 ZULAUF COM Comment: tesc ok 1001 - E -Erosion Control/Mobilization 07/25/2011 ZULAUF COM Comment: tesc ok, excavating foundation 1001 - E -Erosion Control/Mobilization 01/11/2012 ZULAUF COM Comment: landscaping company not done yet. 1001 - E -Erosion Control/Mobilization 02/01/2012 ZULAUF CMP Comment: 1013 - E -Storm Tightline 08/11/2011 LAMBERTJ PAR Comment: OK to backfill - Verified T/L around building, but not connected at this time. 1013 - E -Storm Tightline 01/10/2012 ZULAUF CMP Comment: T/I clean outs at grade and capped. 1016 - E -Infiltration System 12/08/2011 ZULAUF COM Comment: Meeting regarding installation of storm system 1016 - E -Infiltration System 12/09/2011 ZULAUF COM Comment: cb install-ok to b/f 1016 - E -Infiltration System 12/13/2011 ZULAUF COM Comment: Geotech on site. Adequate soils depth for test pits. drainage as expected. Very sandy. 1016 - E -Infiltration System 12/14/2011 ZULAUF COM Comment: installation of Contech system 1016 - E -Infiltration System 12/14/2011 ZULAUF CMP Comment: system cb ok to b/f 1036 - E -Double Check Detector Assem Vault 01/11/2012 ZULAUF CMP Comment: OVWSD inspected-ok 1048 - E -Access Slope & Width Verification 01/10/2012 ZULAUF CMP Comment: ok to final 1051 - E -Pavement Striping 01/11/2012 ZULAUF CMP Comment: ok to final 1060 - E-Fire/Aid Address Sign 01/11/2012 ZULAUF CMP Comment: ok at final 1077 - E -Engineering Final 01/11/2012 ZULAUF COM Comment: landscaping and right of way completion needed for final approval. 3/5/2012 1:25:52 PM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 1 of 3 INSPECTION __- -- ;DATE . :'INSPECTOR 1077 - E -Engineering Final 02/01/2012 ZULAUF COM Comment: all improvements complete -waiting for as-builts 1077 - E -Engineering Final 03/05/2012 ZULAUF CMP Comment: Received asbuilts-ok to final 1080 - E -Pre -Demo Erosion Control 01/10/2012 ZULAUF CMP Comment: same tesc-ok 1101 - B-Preconstruction meeting 07/11/2011 STEINIKE CMP Comment: 1108 - B -Footings 07/28/2011 STEINIKE CMP Comment: 1110 - B -Foundation Wall 08/04/2011 STEINIKE CMP Comment: Okbpending special inspection reports. 1114 - B -Isolated Footings/Piers 08/16/2011 STEINIKE CMP Comment: 1118 - B -Slab Insulation 08/09/2011 STEINIKE CMP Comment: 1120 - B -Plumb Ground Work 08/11/2011 STEINIKE CMP Comment: 1126 - B -Plumb Rough In 09/21/2011 LAWLER CMP Comment: 1128 - B -Gas Test/Pipe 09/21/2011 LAWLER CMP Comment: 1130 - B -Mechanical Rough In 09/26/2011 STEINIKE CMP Comment: 1132 - B -Exterior Wall Sheathing 09/09/2011 STEINIKE CMP Comment: 1133 - B -Roof Sheathing 09/09/2011 STEINIKE CMP Comment: 1138 - B -Ceiling Grid 11/09/2011 LAWLER CMP Comment: 1140 - B -Height Verification 11/22/2011 STEINIKE CMP Comment: 1142 - B -Framing 09/30/2011 LAWLER CMP Comment: height survey on its way 1146 - B-Insulation/Energy 10/11/2011 STEINIKE COR Comment: Not ready! 1146 - B-Insulation/Energy 10/12/2011 STEINIKE CMP Comment: 3/5/2012 1:25:52 PM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 2 of 3 • 10 INSPECTION DATE, INSPECTOR ACT,ION�,, -_ 1158 - B -Building Final 11/22/2011 STEINIKE CMP Comment: Ok for new building only! Egineering and planning will final when exisiting structure is removed. 1955 - F -Extinguishers 01/23/2012 SMITHM CMP Comment: APPROVED 1975 - F -Fire Dept Inspection 01/23/2012 SMITHM CMP Comment: APPROVED 1980 - F -Addressing Visibility 01/23/2012 SMITHM CMP Comment: APPROVED 1985 - F -Fire Final 01/23/2012 SMITHM CMP Comment: APPROVED 2000 - P -Planning Final 02/02/2012 CLUGSTON CMP Comment: Signed off job card 3/5/2012 1:25:52 PM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 3 of 3