Loading...
bld20110161_Landsverk_ENG1.pdf City of EdmondsBLD20110161 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments PermitApplication:Date: #BLD20110161April 15, 2011 th Project Name/Address: Landsverk –8512–184St SW Contact Person/Address, Fax or E-mail: trisha@lqh-inc.com,duane@lqh-inc.com Reviewer: JENNIFERLAMBERTDivision: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.ci.edmonds.wa.usunder City Government / Development Services Department / Engineering Division then scroll down to Handouts: Drainage/ Utility / TESCPlan: 1)Clearly identify the easements located on the subject lot. a.It appears that a portion of the storm utilities from the east adjacent lot is shown crossing the subject lot outside of the easement. i.Please either relocate these utilities to be within the easement, ii.Orobtain an easement for those portions of the utilities outside of the existing easement. 2)It appears that the tightline stub for the east adjacent lot should actually be the footing drain stub. a.If this line should be the footing drain stub, please do not show this line connected to the detention system. b.Please revise plans accordingly. : Erosion Control 1)Please show the silt fence on the plans. 2)Please note that filter socks will be installed in all downstream catch basins per Edmonds Standard Detail E1.3 DATE E-MAILED4/15/2011PAGE() 1 City of EdmondsBLD20110161 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments Utilities: th 1)Please show the utilities installed with the short plat and 184St SW or attach the final short plat utility as-built to the plans. a.If the utilities installed with the short plat will be shown on the plans, please clearly distinguish between utilities that were installed with short plat and proposed utilities (i.e. label proposed and existing, different line types, etc). 2)Please show a cleanout on the sewer line approximately 2’ from the house. Drainage: 1)There isa note on the plans that the driveway water runoff will flow to CB #6; however there is landscape between the driveway and CB #6. The driveway surface water runoff is not permitted todischargeinto a landscape area. a.Please revise plans to show the driveway surface water runoff to be collected directly to the detention system. Please resubmit 3 copies of the revised traffic control plansand associated documents with a written response to each item to an Engineering Technician. Please contact me at425-771-0220ext 1321or by e- mail at jennifer.lambert@ci.edmonds.wa.usif you have specific questions regarding these plan corrections. DATE E-MAILED4/15/2011PAGE() 2