Loading...
BLD20110196.pdfIIII��III V y OF E� CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 q� PHONE: (425) 771-0220 - FAX: (425) 771-0221 R , STATUS: ISSUED 7/20/2011 -Permit #.BLD`20�1101�96 BUILDING PERMIT Expiration Date: 7/20/2012 j Project Addres , i929 LAKE BALLINGER`, WAYaSW; 1 EDMONDS Parcel No: 00491100001302 PANERA BREAD (FOR SUZAN, LLC) ARCVISION WILCOX CONSTRUCTION INC LEE & BARBARA AGELOPOULOUS JENNIFER PATTERSON 234 5TH AVE S 4025 196TH ST SW 2350 AIRPORT FRWY., SUITE 150 EDMONDS, WA 98020 LYNNWOOD, WA 98036 BEDFORD, TX 76022- ( ) - EXT: (817) 391-3970 EXT: (425) 774-4185 EXT: LICENSE #: WILCOC" 194QO EXP:12/10/2011 NEW 4413SF RESTAURANT WITH DRIVE-THRU AND OUTDOOR SEATING AREA, SEPARATE DEMO PERMIT FOR EXISTING BUILDING. VALUATION: $526,912.20 PERMIT TYPE: Commercial PERMIT GROUP: 45 - New Commercial GRADING: N CYDS: 0 TYPE OF CONSTRUCTION: VB RETAINING WALL ROCKERY: N OCCUPANT GROUP: A2 OCCUPANT LOAD: 163 110111 I= FENCE: N ( 0 X 0 FT.) CODE: 09 OTHER: N ----OTHER DESC: ZONE: CG NUMBER OF STORIES: 0 1 VESTED DATE: NUMBER OF DWELLING UNITS: 0 LOT #: BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 BASEMENT: 0 1 ST FLOOR: 4116 2ND FLOOR: 0 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 13RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 FRONTSETBACK LEQUIRED:4 PROPOSED: 4+ RE UIRED:0 PROPOSED: 0+ RE UIRED: PROPOSED: IEIGHT ALLOWED:60 PROPOSED: 18.3 1 REQUIRED: PROPOSED: ETBACK NOTES: See also PLN20110002 for conditions. 1 AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE" AND RCW 18:27. T IS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FE ARE PAID. ,U�U Od(twk(— VeLay-1 Adams -712-0/if - Signature Print Name Date Released By Date ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109/ IBCI10/ IRC I 10. = ONLINE = APPLICANT = ASSESSOR ® OTHER STATUS: ISSUED BLD20110196 • SPECIAL INSPECTIONS ARE REQUIRED FOR THE FOLLOWING: • • Excavation, Grading, and Site Preparation • • Placement of Structural Fill and Compaction • • Soil Bearing Verification • • Foundation Drainage Installation • • Concrete Construction, Including Reinforcement • • Concrete Anchor Installation • • Lateral Wood • • Structural Masonry • • Structural Steel Fabrication and Erection, • • Welding (Welders Must Be WABO Certified) • • Adhered Veneer • • Prior to Final Inspection by the Building Division, Final Special Inspection Reports are Required From All Special Inspectors. • Submit Special Inspection Field reports on a weekly basis to the City Building Department. • Separate Permit Required For: Fire Connection, Fire Sprinkler, Fire Alarm. • The current grease interceptor must be inspected when the vessel is pumped out and empty to ensure the vessel in in good condition prior to the Final being signed off. The vessel must pass a 24 hour leak test. Also, if the down -legs are currently not secured, the down -legs will be required to be secured with stainless steel unistrut and conduit holders (two per down -leg) below the water surface. • Lot line stakes must be in place at the time of foundation/setback inspection. • All new, extended, re -built or relocated electrical utility and/or service shall be placed underground. • Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309 • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. • Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is caused by or occurs during the permitted project. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) BUILDING (425) 771-0220 EXT. 1333 1 ENGINEERING (425) 771-0220 EXT. 1326 1 FIRE (425) 775-7720 1 • PUBLIC WORKS 425) 771-0235 PRE-TREATMENT 425 672-5755 1 RECYCLING 425 275-4801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon. • E -Pre -Con • E -Erosion Control/Mobilization • E -Traffic Control • E -Storm Tightline • E -Storm Connect to Stub • E -Storm Detention System • E -Pre -Water Main Connect, Trench • E -Pre -Water Main Con, Valve Cluster • E -Water Service Line • E -Double Check Detector Assem Vault • E -Remote Reader Installation • E-RPBA with HotBox • E -Driveway Form & Slope Ver. • E -Access Slope & Width Verification • E -Pavement Striping • E -Trash Enclosure • E -Engineering Final • Asbuilt of Civil Site Improvements • B-Preconstruction meeting • B -Setbacks • B -Footings • B -Foundation Wall B -Foundation Drainage • B -Isolated Footings/Piers • B -Retaining Wall • B -Slab Insulation • B -Plumb Ground Work • B -Plumb Rough In • B -Gas Test/Pipe • B -Mechanical Rough In • B -Exterior Wall Sheathing • B -Roof Sheathing • B -Stucco • B -Masonry • B -Ceiling Grid • B -Height Verification • B -Framing • B -Wall Insulation/Caulk • B-Insulation/Energy • B-Sheetrock Nail • B -Plumbing Final • B -Mechanical Final • B -Building Final • F -Extinguishers • F -Fire Dept Inspection • F -Addressing Visibility • F -Fire Final • P -Planning Final E34 E34 E" /�f - -s./ �: 31 E Ea* W E IF Ec- @ E30% EAD EA5 ��y E4 EAD 22S � m m m �Z a a' 0m��° c OZZ O mCDn `v �D Q l v OZ 3 �O �o 0!o Cra1 T�a0) N zv r 0z ;; r �O 3 nn= O K naves �3 NmW (o nNm o c .1 n maZ a' � O, Do—CL m� /M m H co m 0. 4 � W m N cQ', r. fn T 7' to C.' N 0111 m;u Om nO o C a9 Z < -Zi aN z v �+ ix m C N cno m coo ov X20 Z = O 00 n 0 0 A O D 0 n c � N Orl y �D a = ' CD CL rr d r. ? m N a 0 3 CD o n \ CL VJ CD �o M On N M_ m c Z Caa m W c c COL r= m a dl 3 N Z (D `n 3 ` J Ica r v N 0 L W Z O oCQ U) CA a' 10 c c mCDn `v r" Q l v 1m. cn 3 �O �o 0!o vTW c ;; s ?a 3 0111 m;u Om nO o C a9 Z < -Zi aN z v �+ ix m C N cno m coo ov X20 Z = O 00 n 0 0 A O D 0 n c � N Orl y �D a = ' CD CL rr d r. ? m N a 0 3 CD o n \ CL VJ CD �o M On N M_ m c Z Caa m W c c COL r= m a dl 3 N Z (D `n 3 ` J Ica r v N 0 L W Z O oCQ U) 2 O 7o4r ��<i SFJ scanned (TO REMAIN) TOP=]78.82 - FL -388.0 - - - 2"TH STREET SW (PUBLIC RIGHT OF WAY -VARIES IN WIDTH) N884434'W-1421.05' _ _ - --- - (N89 4434'W- 1421.097 BASIS OF BEARINGS APPROVED BY PLANNING I-VA4V O(.2�S 20 11 PLN 2oil0002 N N70�J /Flag Zan G Comer g_ Setbacks aired Actual Front + ' `f• ' (- Sides 0/ Rear Other H •t (vU Ia/If CITY OF EDMON.DS 121 5th AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 • FAX (425) 771-0221 Website: www.ci.edmondsma.us DEVELOPMENT SERVICES DEPARTMENT MIKE COOPER MAYOR SPECI:- L INSPECTIOf- AND `TESTING AGREEMENT ' Permit #i+: 7.�-(l' oL9� Project: Prior to issuance of a permit, this for» t must be completed in its entirety and returned to the City fur approval. The completed fora: uttist have signatures of acknowledgment by all parties. DUTIES AIND RESPONSII3II.ITIFS Special Inspection Firm and Special Inspectors: The Special Inspection firm of �2�7y 1t� will perform special inspection for the following types of work (separate forms must be submitted if more than one firm is to be employed): )4kcinforced Concrete "Bolting in Concrete 0 Prestressed Concrete ❑ Shoicrete ,S Structural Masonry `,>i�Structural SteellWelding High Strength Bolting 0 Spray applied Fireproofing ❑ Smoke Control Systems Lateral Wood El Structural Observation Grading/soils ❑ Other ❑ Other _ Ail individual inspectors to be employed on this project will be WABO certified fur the type of work they are to inspect. (f inspection is for work that is not covered by the WABO categories, or the inspector is not WA130 certified, a detailed resume of the inspector and fain must be submitted. The resume must show that the inspector and the firm are qualified by education and experience to perform the work and testing required by the project design and specifications. The work snail be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall include: • A daily record to be maintained on site, itemzing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. • A wceldy report shall be submitted to the City; detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. • A final report shall be subrnitwd to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresoived discrepancies must be detailed in the final report. UARL;iiding New "older 20101Fa;-u�Sixcfa; incpCOt 01; formdcc4f29/2011 JUN 212011 DEVE C TY OF N DS SERVICES C i i;. • Incorporated August 11, 1890 •�{� Sister City - Hekinan, Japan MICRIL It? C. 1890 CITY OF EDMONDS 121 5th AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 • FAX (425) 771-0221 Website: wwwdedmondsma.us DEVELOPMENT SERVICES DEPARTMENT —IT�l MIKE COOPER MAYOR Contractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at the jobsite for the use of the special inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by she City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. Buildiue Department: The building department shali review any revisions and addenda. The City inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Design Professionals: The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required. and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to insure that all required City approvals arc obtained, prior to work shown on the revisions being performed in the field. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firm to perform in keeping with the requirements of the IEiC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS I have read a0 agree to comply with the terms and conditions of i gree�mjent. / G 6�� �- L Si wr,� % / t Date a/ / Owner: gnat r �/tING. Contractor. slut LCG)( ilor�l�it�T7�gnaturC_ _Date: rlbti►1En %!{'�. TUQ` `� �yrr uy —/��� L Signature � Date: H TukU/ Special Insp. 14442,,1 _Signator Date; !0 ACCEPTED FOR IHE CITY OF EDMONDS BUILD N / By: �—__ __ Date: // %f �` 1 1.-19uild ng New Foider 201WFon 51SpeciW inspection ro:mdoc4P29/201 I • Incorporated August 11, 1890 • Sister City - Hekinan, Japan r • • OF ED4 0�° SPECIAL INSPECTION AND TESTING AGREEMENT V N eat. 1 S9 o Permit #: 'lel C- G! y� Project: Fa,�tz,' Prior to issuance of a permit, this form must be completed in its entirety and returned to the City for approval The completed form must have signatures of acknowledgment by allparties. DUTIES AND RESPONSIBILITIES S1leclal inspection Flrm and Special Inspectors: The Special Inspection firm of will perform special inspection for the following types of work (separate forms must be submitted if more than one firm is to be employed): )Llkcinforced Concrete "Bolting in Concrete ❑ Prestressed Concrete ❑ Shotcrete Structural Masonry `4 Structural Steel/Welding High Strength Bolting ❑ Spray applied Fireproofing ❑ Smoke Control Systems el�Lateral Wood ❑ Structural Observation ° &Grading/soils ❑ Other All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. If inspection is for work that is not coveted by the WABO categories, or the inspector is not WABO certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector and the firm are qualified by education and experience to perform the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall include: A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. LAftildinNew poida 2o101FmreSp=1&1 *pwdan formdod129/2011 JUN - 3 2g11 OUILDING DEPARTMEWT CITY OF C' MONDE 0 0 Contractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at the jobsite for the use of the special inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. Buildine Department: The building department shall review any revisions and addenda. The City inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Resign Professionals: The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required. and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to insure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to -perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner: Signature Date Contractor: Signature Date- ArchAng: Signature Date: Special Insp. 1L� 4- igna Date: /c7 44WAn- ACCEPTED FOR TIM CITY OF EDMONDS BUILDING By: LABuilding New Fulda 20101Famw\Spxia1 ingmdon formdoc4/29/2011 Date: PERMIT # 11-196 — PANERA BREAD CAFE #1515 HEIGHT CHECK VERIFICATION I surveyed the building roof elevation as -built on Nov. 16th, 2011, and found it to be at 394.47 feet. The design finished floor elevation for the new building is 368.46 feet which matches the finished floor elevation of the old building according to the Pre - Construction A.L.T.A./A.C.S.M. Title Survey for Commercial Due Diligence Services, by Matthew Anthony Ruettgers (Washington PLS #41965), dated Dec. 22nd, 2010. From my calculations from said survey, the average grade of the building Quad was 368.00 feet. In conclusion, since the as -built building height is 23.46 feet and is not within 12 inches of the maximum height Permitted for zone CC, which is 60 feet, an Elevation Survey is not required. A.S.P.I. 4532-B Evergreen Way Everett, WA 98208 425-252-1884 I:\ JOBS\2011\211084-PANERA-EDMONDS\DOCUMENTS\HT VERIFICATION.doc; 11/22/2011 MICROFILM 1�rmr® ra.P-.An & A S S 0 C I A T AS, INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION FORENSIC INVESTIGATION December 15, 2011 Mr. Mark Etherington (E -Mail) PANERA BREAD, LLC 3630 S. Geyer Road, Suite #100 Sunset Hills, MO 63127 RE: Geotechnical Special Inspections Final Letter Panera Bread #1515 7935 244m Street Edmonds, Washington Dear Mr. Etherington, KA No. 096-11205 Permit No. BLD2011-0196 In accordance with your request and authorization, we have performed periodic geotechnical special inspection services for the above referenced project. The special inspections for this project were: • Auger Cast Pile Installation • Pin Pile Installation • Final Erosion Control To the best of our knowledge, the deep foundations have been installed in general accordance with the approved plans and specifications our recommendations. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office at (425) 485-5519. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Michael D. Rundquist Senior Project Manager MDR/ C.C. WILCOX CONSTRUCTION (EMAIL) CITY OF EDMONDS DEC 16 2011 DEVELOP ENT SERVICES CTR. CITY OF EDMONDS 11715 North Creek Parkway South C-106 Bothell, Washington 98011• (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States taxiimer.w. c:..It--n.,. MICROFILM _ E-� ILE I =n & ASSOCIATES IN f5 �" � GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION FORENSIC INVESTIGATION December 15, 2011 Mr. Mark Etherington (E -Mail) PANERA BREAD, LLC 3630 S. Geyer Road, Suite #100 Sunset Hills, MO 63127 RE: FINAL LETTER — Panera Bread #1515 7935 244th Street Edmonds, Washington Dear Mr. Etherington, KA No. 096-11205 Permit No. BLD2011-0196 In accordance with your request and authorization, we have performed periodic special testing and inspection services for the above referenced project. The special inspections for this project were: • Lateral Framing • Proprietary Anchor • Reinforced Concrete • Structural Steel Erection To the best of our knowledge, the above referenced items have been found to be in general accordance with the approved plans and specifications. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office at (425) 485-5519. WN C.C. WILCOX CONSTRUCTION (EMAIL) CITY OF EDMONDS .,pjv� DEC 16 2011 UEVELurniiENT SERVICES CTR. CITY OF EDMONDS MICROFILM 11715 North Creek Parkway South C-106 Bothell, Washington 98011• (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States nom iins17;, 1r--A— Inspection Comments BLD20110196 45 - New Commercial Applied: 03/22/2011 Issued: 07/20/2011 Expires: 07/20/2012 Address: 7929 LAKE BALLINGER WAY SW, EDMONDS INSPECTION DATE INSPECTOR ACTION'. 1000 - E -Pre -Con 08/04/2011 MCCONNELL . CMP Comment: J.McConnell, J.Lambert, M.Smith and Building Division on site. Discussed project details with contractor. Need to follow up regarding water system and potential changes. 1001 - E -Erosion Control/Mobilization 11/17/2011 ZULAUF COM Comment: ok 1001 - E -Erosion Control/Mobilization 12/15/2011 ZULAUF CMP Comment: ok at final 1015 - E -Storm Detention System 10/17/2011 MCCONNELL 1002 - E -Traffic Control 11/22/2011 ZULAUF COM Comment: ok MCCONNELL COM Comment: Valve cluster installation may not be required. See attached email to contractor. 1002 - E -Traffic Control 12/15/2011 ZULAUF CMP Comment: ok 1028 - E -Pre -Water Main Con, Valve Cluster 08/04/2011 1013 - E -Storm Tightline 09/27/2011 LAMBERTJ PAR Comment: Partial, ok to backfill. LAMBERTJ CMP Comment: ok 1013 - E -Storm Tightline 10/05/2011 LAMBERTJ CMP Comment: t/I connected and ok to b/f 1014 - E -Storm Connect to Stub 10/05/2011 MCCONNELL CMP Comment: Contractor ran PVC all the way to State 77 as existing stub was pert CMP. Contractor is aware that permit should be obtained from the State for work within limited access area. 1015 - E -Storm Detention System 09/19/2011 ZULAUF PAR Comment: Partial, ok to backfill. 1015 - E -Storm Detention System 10/17/2011 MCCONNELL CMP Comment: Inspected control tee orifice. Ok, sized correctly. 1027 - E -Pre -Water Main Connect, Trench 08/04/2011 MCCONNELL COM Comment: Valve cluster installation may not be required. See attached email to contractor. 1027 - E -Pre -Water Main Connect, Trench 11/23/2011 LAMBERTJ CMP Comment: ok 1028 - E -Pre -Water Main Con, Valve Cluster 08/04/2011 MCCONNELL COM Comment: Valve cluster installation may not be required. See attached email to contractor. 1028 - E -Pre -Water Main Con, Valve Cluster 12/23/2011 LAMBERTJ CMP Comment: ok 1034 - E -Water Service Line 07/26/2011 MCCONNELL COM Comment: Met with J.Waite, K.Kuhnhausen and L.McMurphy regarding water system. Additional research required by PW Operations. 1034 - E -Water Service Line 08/04/2011 MCCONNELL COM Comment: See attached email to contractor regarding service line and meter revisions. 12/20/2011.9:43:47 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 1 of 5 INSPECTION DATE INSPECTOR TACTION 1034 - E -Water Service Line 11/23/2011 LAMBERTJ CMP Comment: verified connection of existing wsl to new connection at building Mike Delilla on site. 1036 - E -Double Check Detector Assem Vault 12/14/2011 MCMURPHY CMP Comment: inspection complete 1037 - E -Remote Reader Installation 12/14/2011 MCMURPHY CMP Comment: ok 1039 - E-RPBA with HotBox 12/14/2011 MCMURPHY CMP Comment: approved 1041 - E -Fire Hydrant Install/Thrust Block 11/30/2011 SMITHM CMP Comment: APPROVED 1042 - E -Fire Hydrant Flush 11/30/2011 SMITHM CMP Comment: APPROVED 1044 - E -Driveway Form & Slope Ver. 11/18/2011 SIBREL CMP Comment: Slope < 14%. No forms (dwy to be asphalt to the curbing) 1048 - E -Access Slope & Width Verification 11/18/2011 SIBREL COM Comment: Access width to match original existing. Side slope < 2% via form measurement. Downhill ped ramp form < 8.3% and uphill ped ramp is 15ft long (thus meeting ADA regs.) 1048 - E -Access Slope & Width Verification 12/14/2011 ZULAUF CMP Comment: ok at final 1051 - E -Pavement Striping 12/14/2011 ZULAUF CMP Comment: ok 1075 - E -Trash Enclosure 12/14/2011 ZULAUF COM Comment: not completed 1075 - E -Trash Enclosure 12/15/2011 ZULAUF CMP Comment: approved 1077 - E -Engineering Final 12/14/2011 ZULAUF COM Comment: see attached cn 1077 - E -Engineering Final 12/15/2011 ZULAUF CMP Comment: approved 1081 - Asbuilt of Civil Site Improvements 06/14/2011 MCCONNELL COM Comment: Contractor shall provide asbuilt of all civil site improvements to the City prior to final project approval. 1081 - Asbuilt of Civil Site Improvements 12/15/2011 ZULAUF CMP Comment: asbuilts will be emailed 1101 - B-Preconstruction meeting 07/20/2011 STEINIKE CMP Comment: 1106 - B -Setbacks 08/15/2011 STEINIKE CMP Comment: 12/20/2011 9:43:47 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 2 of 5 ,INSPECTION DATE INSPECTOR ACTION 1108 - B-Footings 08/15/2011 STEINIKE PAR Comment: Not ready! 1108 - B-Footings 08/19/2011 LAWLER CMP Comment: 1110 - B-Foundation Wall 08/19/2011 LAWLER CMP Comment: 1112 - B-Foundation Drainage 10/06/2011 STEINIKE COM Comment: Footings for drive through. 1112 - B-Foundation Drainage 10/10/2011 LAWLER CMP Comment: 1114 - B-Isolated Footings/Piers 08/19/2011 LAWLER CMP Comment: 1114 - B-Isolated Footings/Piers 09/20/2011 BJORBACK COM Comment: Added inspection for pin pile revision. 1118 - B-Slab Insulation 10/10/2011 LAWLER CMP Comment: 1120 - B-Plumb Ground Work 10/06/2011 STEINIKE PAR Comment: DWV Only! 1120 - B-Plumb Ground Work 10/07/2011 LAWLER PAR Comment: CPVC water line under footing to riser inside building 1120 - B-Plumb Ground Work 11/07/2011 LAWLER CMP Comment: roof drains, interior 1122 - B-Structural Slab 10/12/2011 STEINIKE CMP Comment: 1126 - B-Plumb Rough In 11/02/2011 STEINIKE CMP Comment: 1128 - B-Gas Test/Pipe 11/10/2011 STEINIKE CMP Comment: 1130 - B-Mechanical Rough In 11/16/2011 STEINIKE CMP Comment: 1132 - B-Exterior Wall Sheathing 10/31/2011 STEINIKE CMP Comment: 1133 - B-Roof Sheathing 11/14/2011 LAWLER CMP Comment: 1134 - B-Stucco 11/07/2011 LAWLER CMP Comment: 1138 - B-Ceiling Grid 11/30/2011 LAWLER COR Comment: See correction notice 12/20/2011 9:43:47 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 3 of 5 INSPECTION DATE INSPECTOR ACTION- CTIO1138 1138- B-Ceiling Grid 12/01/2011 LAWLER PAR Comment: approved with the exception of slack wires at electrical fixtures 1138 - B-Ceiling Grid 12/07/2011 LAWLER CMP Comment: 1140 - B-Height Verification 11/07/2011 LAWLER COR Comment: needs survey letter that height complies with approved plans 1140 - B-Height Verification 12/01/2011 LAWLER CMP Comment: received survey letter identifying max 60' height, so survey not necessary 1142 - B-Framing 11/07/2011 LAWLER CMP Comment: 1144 - B-Wall Insulation/Caulk 11/09/2011 LAWLER CMP Comment: 1146 - B-Insulation/Energy 11/14/2011 LAWLER CMP Comment: 1150 - B-Sheetrock Nail 11/14/2011 LAWLER CMP Comment: 1152 - B-Plumbing Final 12/06/2011 LAWLER PAR Comment: Added green tag on gas piping 1152 - B-Plumbing Final 12/12/2011 LAWLER COR Comment: Air gap or RPBA at ice machines 1152 - B-Plumbing Final 12/16/2011 LAWLER CMP Comment: 1154 - B-masonry 12/07/2011 LAWLER CMP Comment: 1156 - B-Mechanical Final 12/16/2011 LAWLER 'CMP Comment: 1158 - B-Building Final 12/16/2011 LAWLER COR Comment: Building final approved pending planning final approval. Okay to move equipment and furnishing, but no customers(can't open for business)until after planning final approval. 1158 - B-Building Final 12/19/2011 BJORBACK CMP Comment: 1955 - F-Extinguishers 12/15/2011 WESTFALL CMP Comment: 1975 - F-Fire Dept Inspection 12/15/2011 WESTFALL CMP Comment: 1980 - F-Addressing Visibility 12/15/2011 WESTFALL CMP Comment: 1985 - F-Fire Final 12/19/2011 WESTFALL CMP Comment: 12/20/2011 9:43:47 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 4 of 5 INSPECTION 2000 - P -Planning Final DATE INSPECTOR ACTION 06/28/2011 COCCIA COM Comment: Review landscaping and building design. Double check signage (they wanted more than allowed by code). 2000 - P -Planning Final Comment: Will install ground cover by west facade 12/16/2011 CUNNINGD CMP 12/20/2011 9:43:47 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 5 of 5