CITY OF EDMONDS
121 5TH AVENUE NORTH - EDMONDS, WA 98020
q�
PHONE: (425) 771-0220 - FAX: (425) 771-0221
R ,
STATUS: ISSUED 7/20/2011 -Permit #.BLD`20�1101�96
BUILDING PERMIT
Expiration Date: 7/20/2012 j Project Addres , i929 LAKE BALLINGER`, WAYaSW;
1 EDMONDS
Parcel No: 00491100001302
PANERA BREAD (FOR SUZAN, LLC) ARCVISION WILCOX CONSTRUCTION INC
LEE & BARBARA AGELOPOULOUS JENNIFER PATTERSON 234 5TH AVE S
4025 196TH ST SW 2350 AIRPORT FRWY., SUITE 150 EDMONDS, WA 98020
LYNNWOOD, WA 98036 BEDFORD, TX 76022-
( ) - EXT: (817) 391-3970 EXT: (425) 774-4185 EXT:
LICENSE #: WILCOC" 194QO EXP:12/10/2011
NEW 4413SF RESTAURANT WITH DRIVE-THRU AND OUTDOOR SEATING AREA, SEPARATE DEMO PERMIT FOR
EXISTING BUILDING.
VALUATION: $526,912.20
PERMIT TYPE: Commercial
PERMIT GROUP: 45 - New Commercial
GRADING: N CYDS: 0
TYPE OF CONSTRUCTION: VB
RETAINING WALL ROCKERY: N
OCCUPANT GROUP: A2
OCCUPANT LOAD: 163 110111 I=
FENCE: N ( 0 X 0 FT.)
CODE: 09
OTHER: N ----OTHER DESC:
ZONE: CG
NUMBER OF STORIES: 0
1 VESTED DATE:
NUMBER OF DWELLING UNITS: 0
LOT #:
BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0
BASEMENT: 0 1 ST FLOOR: 4116 2ND FLOOR: 0
3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
13RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
FRONTSETBACK
LEQUIRED:4 PROPOSED: 4+ RE UIRED:0 PROPOSED: 0+ RE UIRED: PROPOSED:
IEIGHT ALLOWED:60 PROPOSED: 18.3 1 REQUIRED: PROPOSED:
ETBACK NOTES: See also PLN20110002 for conditions.
1 AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO
PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S
COMPENSATION INSURANCE" AND RCW 18:27.
T IS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FE ARE PAID.
,U�U Od(twk(— VeLay-1 Adams -712-0/if -
Signature Print Name Date Released By Date
ATTENTION
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF
OCCUPANCY HAS BEEN GRANTED. UBC109/ IBCI10/ IRC I 10.
= ONLINE = APPLICANT = ASSESSOR ® OTHER
STATUS: ISSUED BLD20110196
• SPECIAL INSPECTIONS ARE REQUIRED FOR THE FOLLOWING:
• • Excavation, Grading, and Site Preparation
• • Placement of Structural Fill and Compaction
• • Soil Bearing Verification
• • Foundation Drainage Installation
• • Concrete Construction, Including Reinforcement
• • Concrete Anchor Installation
• • Lateral Wood
• • Structural Masonry
• • Structural Steel Fabrication and Erection,
• • Welding (Welders Must Be WABO Certified)
• • Adhered Veneer
• • Prior to Final Inspection by the Building Division, Final Special Inspection Reports are Required From All Special
Inspectors.
• Submit Special Inspection Field reports on a weekly basis to the City Building Department.
• Separate Permit Required For: Fire Connection, Fire Sprinkler, Fire Alarm.
• The current grease interceptor must be inspected when the vessel is pumped out and empty to ensure the vessel in in good
condition prior to the Final being signed off. The vessel must pass a 24 hour leak test. Also, if the down -legs are currently not
secured, the down -legs will be required to be secured with stainless steel unistrut and conduit holders (two per down -leg)
below the water surface.
• Lot line stakes must be in place at the time of foundation/setback inspection.
• All new, extended, re -built or relocated electrical utility and/or service shall be placed underground.
• Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309
• Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of
the building or structure. Check the job card for all required City inspections including final project approval and final
occupancy inspections.
• Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from
adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing
fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable.
• Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been
specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision
of city code or state law does not approve any items not to code specification.
• Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits
of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays,
excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must
comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
• Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold
harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to
modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any
ordinance provision.
• Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is
caused by or occurs during the permitted project.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE
PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION.
PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6)
BUILDING (425) 771-0220 EXT. 1333 1 ENGINEERING (425) 771-0220 EXT. 1326 1 FIRE (425) 775-7720 1
•
PUBLIC WORKS 425) 771-0235 PRE-TREATMENT 425 672-5755 1 RECYCLING 425 275-4801
When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection
being requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon.
• E -Pre -Con
• E -Erosion Control/Mobilization
• E -Traffic Control
• E -Storm Tightline
• E -Storm Connect to Stub
• E -Storm Detention System
• E -Pre -Water Main Connect, Trench
• E -Pre -Water Main Con, Valve Cluster
• E -Water Service Line
• E -Double Check Detector Assem Vault
• E -Remote Reader Installation
• E-RPBA with HotBox
• E -Driveway Form & Slope Ver.
• E -Access Slope & Width Verification
• E -Pavement Striping
• E -Trash Enclosure
• E -Engineering Final
• Asbuilt of Civil Site Improvements
• B-Preconstruction meeting
• B -Setbacks
• B -Footings
• B -Foundation Wall
B -Foundation Drainage
• B -Isolated Footings/Piers
• B -Retaining Wall
• B -Slab Insulation
• B -Plumb Ground Work
• B -Plumb Rough In
• B -Gas Test/Pipe
• B -Mechanical Rough In
• B -Exterior Wall Sheathing
• B -Roof Sheathing
• B -Stucco
• B -Masonry
• B -Ceiling Grid
• B -Height Verification
• B -Framing
• B -Wall Insulation/Caulk
• B-Insulation/Energy
• B-Sheetrock Nail
• B -Plumbing Final
• B -Mechanical Final
• B -Building Final
• F -Extinguishers
• F -Fire Dept Inspection
• F -Addressing Visibility
• F -Fire Final
• P -Planning Final
E34
E34
E" /�f
-
-s./ �:
31
E
Ea*
W
E IF
Ec- @
E30%
EAD
EA5
��y
E4
EAD
22S �
m m m
�Z
a
a'
0m��°
c
OZZ
O
mCDn
`v
�D
Q
l
v
OZ
3
�O
�o
0!o
Cra1
T�a0)
N
zv
r
0z
;;
r
�O
3
nn= O
K
naves
�3
NmW (o
nNm
o c
.1
n
maZ a'
� O,
Do—CL
m�
/M m H
co
m 0.
4 �
W m
N
cQ', r.
fn
T 7'
to
C.'
N
0111
m;u
Om
nO
o C
a9
Z
< -Zi
aN
z
v �+
ix
m
C N
cno
m coo
ov
X20
Z
= O
00
n
0
0
A
O D
0
n
c
� N
Orl
y �D
a
= '
CD
CL
rr
d
r.
? m
N a
0 3
CD o
n \ CL
VJ
CD
�o
M
On
N
M_
m
c Z
Caa
m W
c c
COL r=
m a
dl 3 N Z
(D
`n
3 `
J
Ica
r
v
N
0
L
W
Z
O
oCQ
U)
CA
a'
10 c
c
mCDn
`v
r"
Q
l
v
1m. cn
3
�O
�o
0!o
vTW
c
;;
s ?a
3
0111
m;u
Om
nO
o C
a9
Z
< -Zi
aN
z
v �+
ix
m
C N
cno
m coo
ov
X20
Z
= O
00
n
0
0
A
O D
0
n
c
� N
Orl
y �D
a
= '
CD
CL
rr
d
r.
? m
N a
0 3
CD o
n \ CL
VJ
CD
�o
M
On
N
M_
m
c Z
Caa
m W
c c
COL r=
m a
dl 3 N Z
(D
`n
3 `
J
Ica
r
v
N
0
L
W
Z
O
oCQ
U)
2
O
7o4r ��<i
SFJ
scanned
(TO REMAIN)
TOP=]78.82
- FL -388.0 - - -
2"TH STREET SW
(PUBLIC RIGHT OF WAY -VARIES IN WIDTH)
N884434'W-1421.05' _ _ - --- -
(N89 4434'W- 1421.097
BASIS OF BEARINGS
APPROVED BY PLANNING
I-VA4V O(.2�S 20 11
PLN 2oil0002
N N70�J
/Flag
Zan G Comer
g_
Setbacks aired
Actual
Front +
' `f• ' (-
Sides 0/
Rear
Other
H •t (vU
Ia/If
CITY OF EDMON.DS
121 5th AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 • FAX (425) 771-0221
Website: www.ci.edmondsma.us
DEVELOPMENT SERVICES DEPARTMENT
MIKE COOPER
MAYOR
SPECI:- L INSPECTIOf- AND `TESTING AGREEMENT
' Permit #i+: 7.�-(l' oL9� Project:
Prior to issuance of a permit, this for» t must be completed in its entirety and returned to the City fur
approval. The completed fora: uttist have signatures of acknowledgment by all parties.
DUTIES AIND RESPONSII3II.ITIFS
Special Inspection Firm and Special Inspectors:
The Special Inspection firm of �2�7y 1t� will perform special
inspection for the following types of work (separate forms must be submitted if more than one firm is to be
employed):
)4kcinforced Concrete
"Bolting in Concrete
0 Prestressed Concrete
❑ Shoicrete
,S Structural Masonry
`,>i�Structural SteellWelding
High Strength Bolting
0 Spray applied Fireproofing
❑ Smoke Control Systems
Lateral Wood
El Structural Observation
Grading/soils
❑ Other
❑ Other _
Ail individual inspectors to be employed on this project will be WABO certified fur the type of work they are to
inspect. (f inspection is for work that is not covered by the WABO categories, or the inspector is not WA130
certified, a detailed resume of the inspector and fain must be submitted. The resume must show that the
inspector and the firm are qualified by education and experience to perform the work and testing required by the
project design and specifications.
The work snail be inspected for conformance with the plans and specifications approved by the City. Revisions
and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection
records shall include:
• A daily record to be maintained on site, itemzing the inspections performed. Any nonconforming work
shall be brought to the immediate attention of the contractor for resolution.
• A wceldy report shall be submitted to the City; detailing the inspections and testing performed, listing
any nonconforming work and resolution of nonconforming items.
• A final report shall be subrnitwd to the building department prior to the Certificate of Occupancy being
issued. This report will indicate that inspection and testing was completed in conformance with the
approved plans, specifications and approved revisions or addenda. Any unresoived discrepancies must
be detailed in the final report.
UARL;iiding New "older 20101Fa;-u�Sixcfa; incpCOt 01; formdcc4f29/2011
JUN 212011
DEVE C TY OF N DS SERVICES C i i;.
• Incorporated August 11, 1890 •�{�
Sister City - Hekinan, Japan MICRIL
It? C. 1890
CITY OF EDMONDS
121 5th AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 • FAX (425) 771-0221
Website: wwwdedmondsma.us
DEVELOPMENT SERVICES DEPARTMENT
—IT�l
MIKE COOPER
MAYOR
Contractor:
The contractor shall provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plan and specifications must be made available, at the jobsite for the use of the special
inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by
all parties.
The special inspection functions are considered to be in addition to the normal inspections performed by she City
and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be
poured or other work covered until approval is given by the City inspector.
Buildiue Department:
The building department shali review any revisions and addenda. The City inspector will monitor the special
inspection functions for compliance with the agreement and the approved plans. The City inspector shall be
responsible for approving various stages of construction to be covered and for work to proceed.
Design Professionals:
The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special
inspection required. and shall include a schedule for inspection and testing. The architect and/or engineer will
coordinate their revision and addenda process in such a way as to insure that all required City approvals arc
obtained, prior to work shown on the revisions being performed in the field.
Owner:
The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or
agency.
ENFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of the IEiC, the approved
plans and this document, may void this agreement and the Building Official's approval of the special inspector.
In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the
design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK
notice being posted on the project until nonconforming items have been resolved.
ACKNOWLEDGMENTS
I have read a0 agree to comply with the terms and conditions of i gree�mjent. /
G 6�� �- L Si wr,� % / t Date a/ /
Owner: gnat
r
�/tING.
Contractor. slut LCG)( ilor�l�it�T7�gnaturC_ _Date:
rlbti►1En %!{'�. TUQ` `� �yrr uy —/���
L Signature � Date:
H TukU/
Special Insp. 14442,,1 _Signator Date; !0
ACCEPTED FOR IHE CITY OF EDMONDS BUILD N /
By: �—__ __ Date: //
%f �` 1
1.-19uild ng New Foider 201WFon 51SpeciW inspection ro:mdoc4P29/201 I
• Incorporated August 11, 1890 •
Sister City - Hekinan, Japan
r • •
OF ED4
0�° SPECIAL INSPECTION AND TESTING AGREEMENT
V N
eat. 1 S9
o Permit #: 'lel C- G! y� Project: Fa,�tz,'
Prior to issuance of a permit, this form must be completed in its entirety and returned to the City for
approval The completed form must have signatures of acknowledgment by allparties.
DUTIES AND RESPONSIBILITIES
S1leclal inspection Flrm and Special Inspectors:
The Special Inspection firm of will perform special
inspection for the following types of work (separate forms must be submitted if more than one firm is to be
employed):
)Llkcinforced Concrete
"Bolting in Concrete
❑ Prestressed Concrete
❑ Shotcrete
Structural Masonry
`4 Structural Steel/Welding
High Strength Bolting
❑ Spray applied Fireproofing
❑ Smoke Control Systems
el�Lateral Wood
❑ Structural Observation
° &Grading/soils
❑ Other
All individual inspectors to be employed on this project will be WABO certified for the type of work they are to
inspect. If inspection is for work that is not coveted by the WABO categories, or the inspector is not WABO
certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the
inspector and the firm are qualified by education and experience to perform the work and testing required by the
project design and specifications.
The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions
and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection
records shall include:
A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work
shall be brought to the immediate attention of the contractor for resolution.
A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing
any nonconforming work and resolution of nonconforming items.
A final report shall be submitted to the building department prior to the Certificate of Occupancy being
issued. This report will indicate that inspection and testing was completed in conformance with the
approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must
be detailed in the final report.
LAftildinNew poida 2o101FmreSp=1&1 *pwdan formdod129/2011 JUN - 3 2g11
OUILDING DEPARTMEWT
CITY OF C' MONDE
0 0
Contractor:
The contractor shall provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plan and specifications must be made available, at the jobsite for the use of the special
inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by
all parties.
The special inspection functions are considered to be in addition to the normal inspections performed by the City
and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be
poured or other work covered until approval is given by the City inspector.
Buildine Department:
The building department shall review any revisions and addenda. The City inspector will monitor the special
inspection functions for compliance with the agreement and the approved plans. The City inspector shall be
responsible for approving various stages of construction to be covered and for work to proceed.
Resign Professionals:
The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special
inspection required. and shall include a schedule for inspection and testing. The architect and/or engineer will
coordinate their revision and addenda process in such a way as to insure that all required City approvals are
obtained, prior to work shown on the revisions being performed in the field.
Owner:
The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or
agency.
ENFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved
plans and this document, may void this agreement and the Building Official's approval of the special inspector.
In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the
design and/or construction parties to -perform in accordance with this agreement may result in a STOP WORK
notice being posted on the project until nonconforming items have been resolved.
ACKNOWLEDGMENTS
I have read and agree to comply with the terms and conditions of this agreement.
Owner: Signature Date
Contractor: Signature Date-
ArchAng: Signature
Date:
Special Insp. 1L� 4- igna Date: /c7
44WAn-
ACCEPTED FOR TIM CITY OF EDMONDS BUILDING
By:
LABuilding New Fulda 20101Famw\Spxia1 ingmdon formdoc4/29/2011
Date:
PERMIT # 11-196 — PANERA BREAD CAFE #1515
HEIGHT CHECK VERIFICATION
I surveyed the building roof elevation as -built on Nov. 16th, 2011, and found it
to be at 394.47 feet.
The design finished floor elevation for the new building is 368.46 feet which
matches the finished floor elevation of the old building according to the Pre -
Construction A.L.T.A./A.C.S.M. Title Survey for Commercial Due Diligence
Services, by Matthew Anthony Ruettgers (Washington PLS #41965), dated Dec.
22nd, 2010.
From my calculations from said survey, the average grade of the building Quad
was 368.00 feet.
In conclusion, since the as -built building height is 23.46 feet and is not within
12 inches of the maximum height Permitted for zone CC, which is 60 feet, an
Elevation Survey is not required.
A.S.P.I.
4532-B Evergreen Way
Everett, WA 98208
425-252-1884
I:\ JOBS\2011\211084-PANERA-EDMONDS\DOCUMENTS\HT VERIFICATION.doc; 11/22/2011
MICROFILM
1�rmr®
ra.P-.An & A S S 0 C I A T AS, INC.
GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING & INSPECTION
FORENSIC INVESTIGATION
December 15, 2011
Mr. Mark Etherington (E -Mail)
PANERA BREAD, LLC
3630 S. Geyer Road, Suite #100
Sunset Hills, MO 63127
RE: Geotechnical Special Inspections Final Letter
Panera Bread #1515
7935 244m Street
Edmonds, Washington
Dear Mr. Etherington,
KA No. 096-11205
Permit No. BLD2011-0196
In accordance with your request and authorization, we have performed periodic geotechnical special
inspection services for the above referenced project. The special inspections for this project were:
• Auger Cast Pile Installation
• Pin Pile Installation
• Final Erosion Control
To the best of our knowledge, the deep foundations have been installed in general accordance with the
approved plans and specifications our recommendations.
If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office
at (425) 485-5519.
Respectfully submitted,
KRAZAN & ASSOCIATES, INC.
Michael D. Rundquist
Senior Project Manager
MDR/
C.C. WILCOX CONSTRUCTION (EMAIL)
CITY OF EDMONDS
DEC 16 2011
DEVELOP ENT SERVICES CTR.
CITY OF EDMONDS
11715 North Creek Parkway South C-106 Bothell, Washington 98011• (425) 485-5519 • FAX (425) 485-6837
With Offices Serving the Western United States
taxiimer.w. c:..It--n.,.
MICROFILM
_ E-� ILE
I
=n & ASSOCIATES IN f5
�" �
GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING
CONSTRUCTION TESTING & INSPECTION
FORENSIC INVESTIGATION
December 15, 2011
Mr. Mark Etherington (E -Mail)
PANERA BREAD, LLC
3630 S. Geyer Road, Suite #100
Sunset Hills, MO 63127
RE: FINAL LETTER —
Panera Bread #1515
7935 244th Street
Edmonds, Washington
Dear Mr. Etherington,
KA No. 096-11205
Permit No. BLD2011-0196
In accordance with your request and authorization, we have performed periodic special testing and
inspection services for the above referenced project. The special inspections for this project were:
• Lateral Framing
• Proprietary Anchor
• Reinforced Concrete
• Structural Steel Erection
To the best of our knowledge, the above referenced items have been found to be in general accordance
with the approved plans and specifications.
If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office
at (425) 485-5519.
WN
C.C. WILCOX CONSTRUCTION (EMAIL)
CITY OF EDMONDS
.,pjv�
DEC 16 2011
UEVELurniiENT SERVICES CTR.
CITY OF EDMONDS
MICROFILM
11715 North Creek Parkway South C-106 Bothell, Washington 98011• (425) 485-5519 • FAX (425) 485-6837
With Offices Serving the Western United States
nom iins17;, 1r--A—
Inspection Comments
BLD20110196 45 - New Commercial
Applied: 03/22/2011 Issued: 07/20/2011 Expires: 07/20/2012
Address: 7929 LAKE BALLINGER WAY SW, EDMONDS
INSPECTION DATE INSPECTOR ACTION'.
1000 - E -Pre -Con 08/04/2011 MCCONNELL . CMP
Comment: J.McConnell, J.Lambert, M.Smith and Building Division on site. Discussed project details with
contractor. Need to follow up regarding water system and potential changes.
1001 - E -Erosion Control/Mobilization 11/17/2011 ZULAUF COM
Comment: ok
1001 - E -Erosion Control/Mobilization
12/15/2011
ZULAUF
CMP
Comment: ok at final
1015 - E -Storm Detention System 10/17/2011
MCCONNELL
1002 - E -Traffic Control
11/22/2011
ZULAUF
COM
Comment: ok
MCCONNELL
COM
Comment: Valve cluster installation may not be required. See attached email to contractor.
1002 - E -Traffic Control
12/15/2011
ZULAUF
CMP
Comment: ok
1028 - E -Pre -Water Main Con, Valve Cluster 08/04/2011
1013 - E -Storm Tightline
09/27/2011
LAMBERTJ
PAR
Comment: Partial, ok to backfill.
LAMBERTJ
CMP
Comment: ok
1013 - E -Storm Tightline
10/05/2011
LAMBERTJ
CMP
Comment: t/I connected and ok to b/f
1014 - E -Storm Connect to Stub 10/05/2011 MCCONNELL CMP
Comment: Contractor ran PVC all the way to State 77 as existing stub was pert CMP. Contractor is aware that
permit should be obtained from the State for work within limited access area.
1015 - E -Storm Detention System 09/19/2011
ZULAUF
PAR
Comment: Partial, ok to backfill.
1015 - E -Storm Detention System 10/17/2011
MCCONNELL
CMP
Comment: Inspected control tee orifice. Ok, sized correctly.
1027 - E -Pre -Water Main Connect, Trench 08/04/2011
MCCONNELL
COM
Comment: Valve cluster installation may not be required. See attached email to contractor.
1027 - E -Pre -Water Main Connect, Trench 11/23/2011
LAMBERTJ
CMP
Comment: ok
1028 - E -Pre -Water Main Con, Valve Cluster 08/04/2011
MCCONNELL
COM
Comment: Valve cluster installation may not be required. See attached email to contractor.
1028 - E -Pre -Water Main Con, Valve Cluster 12/23/2011
LAMBERTJ
CMP
Comment: ok
1034 - E -Water Service Line 07/26/2011 MCCONNELL COM
Comment: Met with J.Waite, K.Kuhnhausen and L.McMurphy regarding water system. Additional research
required by PW Operations.
1034 - E -Water Service Line 08/04/2011 MCCONNELL COM
Comment: See attached email to contractor regarding service line and meter revisions.
12/20/2011.9:43:47 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 1 of 5
INSPECTION
DATE
INSPECTOR
TACTION
1034 - E -Water Service Line
11/23/2011
LAMBERTJ
CMP
Comment: verified connection of existing wsl to new connection at building
Mike Delilla on site.
1036 - E -Double Check Detector Assem Vault
12/14/2011
MCMURPHY
CMP
Comment: inspection complete
1037 - E -Remote Reader Installation
12/14/2011
MCMURPHY
CMP
Comment: ok
1039 - E-RPBA with HotBox
12/14/2011
MCMURPHY
CMP
Comment: approved
1041 - E -Fire Hydrant Install/Thrust Block
11/30/2011
SMITHM
CMP
Comment: APPROVED
1042 - E -Fire Hydrant Flush
11/30/2011
SMITHM
CMP
Comment: APPROVED
1044 - E -Driveway Form & Slope Ver.
11/18/2011
SIBREL
CMP
Comment: Slope < 14%. No forms (dwy to be asphalt to the curbing)
1048 - E -Access Slope & Width Verification
11/18/2011
SIBREL
COM
Comment: Access width to match original existing.
Side slope < 2% via form measurement. Downhill ped ramp
form < 8.3% and uphill ped ramp is 15ft
long (thus meeting ADA
regs.)
1048 - E -Access Slope & Width Verification
12/14/2011
ZULAUF
CMP
Comment: ok at final
1051 - E -Pavement Striping
12/14/2011
ZULAUF
CMP
Comment: ok
1075 - E -Trash Enclosure
12/14/2011
ZULAUF
COM
Comment: not completed
1075 - E -Trash Enclosure
12/15/2011
ZULAUF
CMP
Comment: approved
1077 - E -Engineering Final
12/14/2011
ZULAUF
COM
Comment: see attached cn
1077 - E -Engineering Final
12/15/2011
ZULAUF
CMP
Comment: approved
1081 - Asbuilt of Civil Site Improvements
06/14/2011
MCCONNELL
COM
Comment: Contractor shall provide asbuilt of all civil site improvements to the City prior to final project approval.
1081 - Asbuilt of Civil Site Improvements
12/15/2011
ZULAUF
CMP
Comment: asbuilts will be emailed
1101 - B-Preconstruction meeting
07/20/2011
STEINIKE
CMP
Comment:
1106 - B -Setbacks
08/15/2011
STEINIKE
CMP
Comment:
12/20/2011 9:43:47 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 2 of 5
,INSPECTION
DATE
INSPECTOR
ACTION
1108 - B-Footings
08/15/2011
STEINIKE
PAR
Comment: Not ready!
1108 - B-Footings
08/19/2011
LAWLER
CMP
Comment:
1110 - B-Foundation Wall
08/19/2011
LAWLER
CMP
Comment:
1112 - B-Foundation Drainage
10/06/2011
STEINIKE
COM
Comment: Footings for drive through.
1112 - B-Foundation Drainage
10/10/2011
LAWLER
CMP
Comment:
1114 - B-Isolated Footings/Piers
08/19/2011
LAWLER
CMP
Comment:
1114 - B-Isolated Footings/Piers
09/20/2011
BJORBACK
COM
Comment: Added inspection for pin pile revision.
1118 - B-Slab Insulation
10/10/2011
LAWLER
CMP
Comment:
1120 - B-Plumb Ground Work
10/06/2011
STEINIKE
PAR
Comment: DWV Only!
1120 - B-Plumb Ground Work
10/07/2011
LAWLER
PAR
Comment: CPVC water line under footing to riser inside building
1120 - B-Plumb Ground Work
11/07/2011
LAWLER
CMP
Comment: roof drains, interior
1122 - B-Structural Slab
10/12/2011
STEINIKE
CMP
Comment:
1126 - B-Plumb Rough In
11/02/2011
STEINIKE
CMP
Comment:
1128 - B-Gas Test/Pipe
11/10/2011
STEINIKE
CMP
Comment:
1130 - B-Mechanical Rough In
11/16/2011
STEINIKE
CMP
Comment:
1132 - B-Exterior Wall Sheathing
10/31/2011
STEINIKE
CMP
Comment:
1133 - B-Roof Sheathing
11/14/2011
LAWLER
CMP
Comment:
1134 - B-Stucco
11/07/2011
LAWLER
CMP
Comment:
1138 - B-Ceiling Grid
11/30/2011
LAWLER
COR
Comment: See correction notice
12/20/2011 9:43:47 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220
Page 3 of 5
INSPECTION
DATE
INSPECTOR
ACTION-
CTIO1138
1138- B-Ceiling Grid
12/01/2011
LAWLER
PAR
Comment: approved with the exception of slack wires
at electrical fixtures
1138 - B-Ceiling Grid
12/07/2011
LAWLER
CMP
Comment:
1140 - B-Height Verification
11/07/2011
LAWLER
COR
Comment: needs survey letter that height complies with approved plans
1140 - B-Height Verification
12/01/2011
LAWLER
CMP
Comment: received survey letter identifying max 60'
height, so survey not necessary
1142 - B-Framing
11/07/2011
LAWLER
CMP
Comment:
1144 - B-Wall Insulation/Caulk
11/09/2011
LAWLER
CMP
Comment:
1146 - B-Insulation/Energy
11/14/2011
LAWLER
CMP
Comment:
1150 - B-Sheetrock Nail
11/14/2011
LAWLER
CMP
Comment:
1152 - B-Plumbing Final
12/06/2011
LAWLER
PAR
Comment: Added green tag on gas piping
1152 - B-Plumbing Final
12/12/2011
LAWLER
COR
Comment: Air gap or RPBA at ice machines
1152 - B-Plumbing Final
12/16/2011
LAWLER
CMP
Comment:
1154 - B-masonry
12/07/2011
LAWLER
CMP
Comment:
1156 - B-Mechanical Final
12/16/2011
LAWLER
'CMP
Comment:
1158 - B-Building Final
12/16/2011
LAWLER
COR
Comment: Building final approved pending planning final approval. Okay to
move equipment and furnishing, but no
customers(can't open for business)until
after planning final approval.
1158 - B-Building Final
12/19/2011
BJORBACK
CMP
Comment:
1955 - F-Extinguishers
12/15/2011
WESTFALL
CMP
Comment:
1975 - F-Fire Dept Inspection
12/15/2011
WESTFALL
CMP
Comment:
1980 - F-Addressing Visibility
12/15/2011
WESTFALL
CMP
Comment:
1985 - F-Fire Final
12/19/2011
WESTFALL
CMP
Comment:
12/20/2011 9:43:47 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 4 of 5
INSPECTION
2000 - P -Planning Final
DATE INSPECTOR ACTION
06/28/2011 COCCIA COM
Comment: Review landscaping and building design. Double check signage (they wanted more than allowed by
code).
2000 - P -Planning Final
Comment: Will install ground cover by west facade
12/16/2011 CUNNINGD CMP
12/20/2011 9:43:47 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 5 of 5