Loading...
BLD20110357.pdfIlll�jlll T '✓ y OF E� CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 STATUS: ISSUED 5/18/2011 Expiration Date: 5/18/201' Parcel No: 00564900201000 %y STEPHANIE K PAAVOLA 24225 107TH PL W EDMONDS, WA 98020 (206) 326-9912 EXT: STEPHANIE K PAAVOLA 24225 107TH PL W EDMONDS, WA 98020 (206) 326-9912 EXT: TO COMPLETE WORK FROM EXPIRED PERMIT BLD2008-0141 FINISH DRYWALL, KITCHEN CABINETS AND FLOORING. VALUATION: $0.00 OWNER EXEMPTION TAKEN ( ) - EXT: LICENSE N: EXP: PERMIT TYPE: Residential PERMIT GROUP: 18 - Complete Minor Work GRADING: N CYDS: 0 TYPE OF CONSTRUCTION: RETAINING WALL ROCKERY: N OCCUPANT GROUP: OCCUPANT LOAD: FE' CE: N 0 X 0 FT.) CODE: 09 O i HER: N ----- OTHER DESC: ZONE: NUMBER OF STORIES: 0 VESTED DATE: NUMBER OF DWELLING UNITS: 1 LOT t!: BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 I-RONTSETBACK SIDE, SE-111ACK REAR SETBACK .E UIRED: PROPOSED: RE UIRED: PROPOSED: RE UIRED: PROPOSED: [EIGHT ALLOWED:O PROPOSED:O RE UIRED: PROPOSED: ETBACK NOTES: 1 AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27, THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEP TY AND ALL FEES ARE PAID. a -p -v VlgZl( l Signature Print Name Date f Rele ed Date ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109/ IBCI 10/ IRCI 10. ONLINE APPLICANT ASSESSOR C', -PGA1a/t3 �,� STATUS: ISSUED BLD20110357 • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final'project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City ""s ability to enforce any ordinance provision. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) BUILDING (425) 771-0220 EXT. 1333 1 ENGINEERING (425) 771-0220 EXT. 1326 1 FIRE (425) 775-7720 PUBLIC WORKS 425) 771-0235 1 PRE-TREATMENT 425) 672-5755 1 RECYCLING 425) 275-4801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon. • SEE INSPECTIONS BLD20080141 Inspection Comments BLD20080141 38 - Incomplete/Abandoned Project PeRwo�TTRax Applied: 02/21/2008 Issued: 05/22/2010 Expires: 05/22/2011 Address: 24225 107TH PL W, EDMONDS INSPECTION.: - DATE-; INSPECTOR: ACTION_ 1001 - E -Erosion Control/Mobilization Comment: 1077 - E -Engineering Final/Downspout Connection Comment: 1106 - B -Setbacks 06/15/2009 steinike CMP Comment: 1108 - B -Footings 06/15/2009 steinike CMP Comment: 1110 - B -Foundation Wall 06/15/2009 STEINIKE CMP Comment: 1122 - B -First Floor Framing 07/02/2009 steinike INC Comment: Not Complete but will Inspect at Sheathing from crawl space. 1126 - B -Plumb Rough In 01/24/2011 STEINIKE CMP Comment: 1136 - B -Shear Nailing 04/20/2009 steinike INC Comment: Ok for Small Addition only! 1136 - B -Shear Nailing 07/17/2009' steinike CMP .Comment: 1142 - B -Framing 01/27/2011 STEINIKE PAR Comment: Sheathing ONLY! 1142 - B -Framing 01/27/2011 STEINIKE CMP Comment: 1144 - B -Wall Insulation/Caulk 01/27/2011 STEINIKE J CMP Comment: 1146 - B -Floor Insulation/Caulk Comment: 1148 - B -Ceiling Insulation/Caulk 01/27/2011 STEINIKE CMP Comment: 1150 - B-Sheetrock Nail ' Comment: 1158 - B -Building Final 05/17/2011 STEINIKE COM Comment: Needs to renew, drywall not complete and finals. 4/28/2014 9:08:45 AM Page 1 of 1 Inspection Comments PERMITTRAX BLD20110357 18 - Complete Minor Work Applied: 05/18/2011 Issued: 05/18/2011 Expires: 05/18/2014 Address: 24225 107TH PL W, EDMONDS INSPECTION _ DATE = INSPECTOR ACTION°. 1158 SEE INSPECTIONS BLD20080141 04/09/2014 LAWLER COR Comment: 1.) air gap at dishwasher 2.) AAV at bar sink 1158 - SEE INSPECTIONS BLD20080141 04/25/2014 LAWLER CMP Comment: 4/28/2014 9:07:59 AM Page 1 of 1 STATUS: ISSUED Expiration Date: Parce I No: 00564900201000 STEPHANIE & JOUNI PAAVOLA 24225 107TH PL W EDMONDS, WA 98020 206-621-3549 CITYrof CQ SEE7OF EDMONDS I �� 121 5TH AVENUE NORTH - EDMONDS,WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 Permiit #� RT,n2�(1R(1141 ` Adress:" 24225 107TH PL W, EDMONDS' STEPHANIE & JOUNI PAAVOLA 24225 107TH PL W EDMONDS, WA 98020 206-621-3549 HOMEOWNER EXEMPTION TAKEN LICENSE #: EXP: OB DESCRIPTION ADD 292SF TO BATHROOM, KITCHEN, DIMNQ UTILITY ADD 212SF MASTER BEDROOM VALUATION: $67,426 PERMIT TYPE: Residential PERMIT GROUP: 2 - Addition GRADING: N CYDS: 0 TYPE OF CONSTRUCTION: VB RETAINING WALL ROCKERY: N OCCUPANT GROUP: R3 OCCUPANT LOAD: FENCE: N ( 0 X 0 FT.) CODE: 2006 OTHER: N ------- OTHER DESC: ZONE: RS -8 NUMBER OF STORIES: 0 VESTED DATE: NUMBER OF DWELLING UNITS: 1 BASEMENT: 0 1ST FLOOR: 0 2ND FLOOR: 0 BASEMENT: 0 1ST FLOOR: 504 2ND FLOOR: 0 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 13RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 1 REQUIRED: 25' PROPOSED: 27.8' REQUIRED:7.5' PROPOSED: 9.2' REQUIRED: 15' PROPOSED: 48.8' HEIGHT ALLOWED:25 PROPOSED:15.82 REQUIRED: 7.5' PROPOSED: 9.2' SETBACK NOTES: FRONT SETBACK 27.8' APPLIES TO PROPOSAL ONLY. 1 AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. HIS APPLICATION ISNOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HLR DEPUTY AND ALL FEES ARE PAID. W. Signature Print Name Date ATTENTION . '-- IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HASIBEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED, UB-109/IBCI 10/.;rRCI 10. ARCHIVE APPLICANT ASSESSOR -NOTHFR r�etc�� �lIbl to -��-l'�lcd,'l�*" a��1�� q -ted 5-11�1Oq STATUS: ISSUED BLD20080141 • REQUIRED SPECIAL INSPECTIONS FOR THIS PROJECT: 1) EPDXY BOLTS • Lot line stakes must be in place at the time of foundation/setback inspection. • Approval of this foundation design is conditional subject to inspection of existing site soil conditions. Retaining Walls must be designed and constructed to resist the lateral pressure of the retained material. Provisions must be made forthe control and drainage of surface water around buildings. • Installer shall provide the manufacturer's installation, operating instructions, and a whole house ventilation system operation description. A label shall be affixed to the whole house timer control that reads "Whole House Ventilation" (see operating instructions). • Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309 • Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted. • Submit all special inspection reports to the City Building Inspector on a weekly basis. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. Sound/Noise originating fromtemporary construction sites as a result of construction activity are exempt fromthe noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activites must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance fo this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance not limit in any way the City's ability to enforce any ordinance provision. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) BUILDING (425) 771-0220 EXT. 1333 1 ENGINEERING (425) 771-0220 EXT. 1326 1 FIRE (425) 771-0215 PUBLIC WORKS 425 771-0235 1 PRE-TREATMENT 425 672-5755 1 RECYCLING 425 275-4801 When calling for an inspection please lease the following information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon. • E•Erosion Control/Mobilization &Engineering Final/Downspout Connection • B -Setbacks • B -Footings • B -Foundation Wall • B -Foundation Drainage • B -Isolated Footings/Piers • B -First Floor Framing • B -Plumb Rough In • B -Gas Test/Pipe • B`ShearNdiling • B -Framing • B-WallInsulation/Caulk • B-FloorInsulation/Caulk • B -Ceiling Insulation/Caulk • B-Sheetrock Nail • B -Building Final N C O W W j O rn CD Z rr W W z Al HJV7d IPLOI a Q� uj 5- v � ! �z �CC i a W 2O C m a — vi �� LO ai `� O O W lQi. O nj 00 IZ- O cn"on, Z Li W 0^ 03 W Q � N Lu z O rn vooZZ z U�QZZ OD � vi rnwi Q Z O O lOn 0 Q Zc Q ti amQoo o� a� �r--izz W U) Lnt- �W�'`.,a� exo 0 0 N C O W W j O rn CD Z rr W W z Al HJV7d IPLOI a Q� uj 5- EXEMPTION FROM CONTRACTOR REGISTRATION VERIFICATION FORM D FE 7 The undersigned property owner or authorized person as described be7oVwE,,0,Wra lura building permit from the City of Edmonds and claims that he/she/it is exempt frop'knding contractor registration in accordance with the provisions of RCW 18.27. The property owner or authorized person, by their signature below, hereby verifies to the City of Edmonds that: O Value of work under $500.00. The aggregate contract price of labor and materials and all other items required for the project is less than $500.00 and is not part of a larger operation to be undertaken on the property. This exemption does not apply to a person who advertises or puts out any sign or card or other device which might indicate to the public that he/she is a contractor, or that he/she is qualified to engage in the business of contractor. RCW 18.27.090(9). Owner who contracts for a project. A property owner contracting with registered contractors for the project, and who him/herself is not performing any activity of a contractor for the purpose of leasing or selling improved property that he/she has owned for less than twelve months. RCW 18.27.090(11). O Work performed personally on own property. Anyone personally working on property he/she owns, or at which he/she resides, as long as the property owner, or resident, does not perform any activity of a contractor on his/her property for the purpose of selling, demolishing, or leasing the property. RCW 18.27.090(12). O Use of own employees. Property owner using him/herself or his/her own employees .to perform maintenance, repair, and alteration work in of upon his/her own property. RCW 18.27.090(13). O Licensed Architect, engineer, electrician or plumber. All work performed under this permit will be performed by an architect, civil or professional engineer, certified electrician or certified plumber operating within the scope of his/her certification. RCW 18.72.090(14). O Other. Specify which provision of RCW 18.27.090 applies: THE UNDERSIGNED PROPERTY OWNER OR AUTHORIZED PERSON HEREBY VERIFIES THAT ALL INFORMATION PROVIDED ON THIS FORM IS TRUE AND ACCURATE TO THE BEST OF HIS OR HER KNOWLEDGE AND ACKNOWLEDGES THAT IF ANY OF THE INFORMATION PROVIDED ON THIS FORM IS FALSE HE OR SHE UNDERSTANDS THAT THE BUILDING PERMIT WILL BE IMMEDIATELY REVOKED AND ALL FEES PAID FORFEITED. DATED this day of T e Q . PROPERTY OWNER/AUTHORIZED PERSON ga-et'�- ature Vd�aa%rolG Print Name REVISED 7/07 2008. WITNESS Signature CQ�' " , /- Print Name -4 Fax page APR -17-20M 14:09 MMES TESTING 1 of SD,yO 6„ 1 WS CITY OF EDMONDS SPECIAL INSPEC nON AND 'ICh:STING AGREEMENT PERMIT it !=ix D(Li4 DATE•! v I i% PROJECT SITE ADDM: PROJECT NAME: T as sL� IAL INSPECTION AGENCYq" A1^1 � 0Oneform mast be cotapleted by each Spa sial tispection Agcn or lnspeetor. Page 2 of 2 P.01/04 SPECIAL INSPECTIONS REQUIRED: Special inspections are required for this project in accordance with IBC Cbapter 17 or in accordance with IRC 81092 as applicable. IBC Section 170CI requires the owner or the registered design professional in charge to employ an independent testing4aspection agency/special inspector to perform requited special inspections. The independent agency hired to perform the dutirs of $pedal inspection is required to be a registered agency with WABO under the Special Inspection Registration Program (SIRP). The special inspector shall be a qualified person with enmpetence for iaspectioa of the Particular type of construction or operation requiring special inspection (•COQ may be required by the Building Official} The otvaer, registered professional, contractor and special ia-spectortagenry shall complete the attached form and submit directly to the Building Division. WORK REOURING SPECIAL INSPECTION: Special inspections will be required for the Wowing c2ttg0rtta of work in arrordanee with IBC Chapter 17 and IRC R109R2: FOR SPECIFIC INFORMATION REGARDING REQUIRED SPE INSPECTIONS SEE THE STATEMENT OF SPECIAL INSPECTION QATTACHED &]? ROVED PLAN SHEET BEFORF A PERMIT CAN BE ISSUED: The owner and contractor and speeial inspector shall complete this agreement and the attached SpeeW Inspection Information Foran. including the required seknowledgemeats and return to the Building Division for approval prior to permit issuauoe. W:Wui1diz401ANDWT 1CODEMFORM WEML INSPEC71ON AGREENMM FORM.doc71Q7 3) �-. , ,1 I A,,� L- c - ���J i ) APR 17 � ,' 1. .`� �•,' .. `. :�_�: F;' https://www2.sea.accessline. com/exec/teleweb?uifwa=convertJpeg&-=tdifnnixlampnlI&m... 4/17/2008 'APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the Building Oficial prior to performing any duties or inspections. The company performing inspections must be WABO certified as well as the individual completing inspections. When required by the Building Official, each special inspector shall submit Statement of Qualifications to the City for review. Special inspectors shall display identification when performing special inspections on the project site. Special inspection and testing shall meet the minimum requirements of IBC Chapter 17 and the following: A. Duties and Responsibilities of the Special Inspector 1. OBSERVE WORK The special inspector shall observe the site work for conformance with the approved (stamped) plans and specifications and applicable workmanship provisionsof the IBC. Architect or Engineer reviewed shop drawings may be used only as an aid -to inspection. Special inspections are to be performed on a continuous basis—meaning that the special inspector is on site at all times observing the work requiring special inspection. Periodic inspections are permitted only as specifically noted in the approved project pians in accordance with IBC Chapter 17, and as approved by the Building Official. Continuous Inspection means the same inspector is on site day to day to observe the work requiring special inspection. Periodic Inspection means some inspections may be performed on a periodic basis to satisfy the requirements of continuous inspection, provided these periodic inspections are performed as outlined in the project plans and specifications, and approved by the Building Official. 2. REPORT NONCONFORMING ITEMS The special inspector shall bring non -conforming items to the immediate attention of the contractor and note all such items in the daily field report. Any item not resolved in a timely manner shall be immediate cause of the special inspector to notify the Building Official by telephone at (425-771-0220) or in person at City Hall, of the plan deviation, error, change or omission. It shall also be the duty of the special inspector to promptly notify the engineer or architect of record. 3. DAILY REPORTS KEPT ON SITE WITH CONTRACTOR Each special inspector shall complete and sign a daily report for each day's inspections. The daily reports shall remain at the jobsite with the contractor for review by the City Building Inspector. 4. WEEKLY REPORTS TO CITY The special inspector or inspection agency shall furnish the City with weekly reports of tests and inspections. The project engineer or architect, and others as designated shall also be copied on reports. Weekly reports must include the following.- Description ollowing:Description and date of daily inspections and tests made with applicable locations • List of all non -conforming items and locations Report on status of non -conforming items (how each was resolved or unresolved) Field changes authorized by the Architect, Engineer or City Inspector if not included in non-conformance items. VVl 1Y'. •I 1• �Yr�1\YV ArrT rh/'V Y\Y'�/�l.+�T'. .nt �>`r,IVY.. VV.VAr1T/VT1IV1• •IVT Y^Ti T11T Y^IVT1. / .1//... 5.' FINAL CONSTRUCTION REPORT The special inspector or inspection agency shall submit a final signed report or Certificate of Compliance to the City stating that all items requiring special inspection and testing were fulfilled and reported. And, to the best of his/her knowledge the project is in conformance with the approved plans and specifications, approved change orders and the applicable workmanship provisions of the IBC. Items not in conformance, unresolved items or any discrepancies in inspection coverage (i.e., missed inspections, periodic inspection when continuous inspections were required, etc.) shall be specifically addressed in this report. B. Contractor Responsibilities 1. NOTIFY THE SPECIAL INSPECTOR OF ALL REQUIRED SPECIAL INSPECTIONS It is the duty of the contractor to notify the special inspector when work is ready for special inspection. Note, the items listed on the attached Special Inspection Information Form and as noted on the approved plans and specifications are required to have special inspections. Adequate notice shall be provided by the contractor so that the special inspector has time to become familiar with the project. All work requiring special inspection must be approved prior to concealing or covering said work. 2. PROVIDE ACCESS TO APPROVED PLANS The contractor is responsible for providing the special inspector access to approved plans at the johsite. 3. RETAIN SPECIAL INSPECTION RECORDS The contractor is responsible to retain at the jobsite all special inspection records submitted by the special inspector. These records are to be provided to the City building inspector upon request. C. City of Edmonds Building Division Responsibilities 1. APPROVE SPECIAL INSPECTION The Building Division shall approve all Special Inspectors and special inspection requirements. 2. MONITOR SPECIAL INSPECTIONS AND APPROVE WEEKLY REPORTS Work requiring special inspection and the performance of special inspectors shall be monitored by the City Building Inspector. Building Inspector approval must be obtained prior to placement of concrete or other similar activities in addition to that of the special inspector. 3. ISSUE CERTIFICATE OF OCCUPANCY The Building Oficial may issue a Certificate of Occupancy after all weekly special inspection reports including the final report have been submitted and accepted by the City. D. Owner Responsibilities 1. The project owner or the engineer or architect of record acting as the owner's agent shall fund special inspection services. E. Engineer or Architect of Record Responsibilities I. Prepare Statement of Special Inspections in accordance with IBC Section 1705. 2. Review the special inspection reports and provide corrective action for work that may not. conform to the approved plans. W'1Rnilrtinol{1AT311(7{{T If'f1r1FC1F(1R11�'C1CnRf�leT iAiCAF!`TIf�AE �ron�A,�nwr-rr.�nwR.t�_^»n•a Fax page Page 2 of 2 APR-17-2WB 14:11 MYES TESTING P.04/04 ACKNOWLEDGEMENTS I haw read and agree to com* with the teens acrd' conditions oJtbis apeemrnt Owner name J OU K s .I A A V O L A (please rirri or e) Signature 7Dace a8 `JOU lel e4 6{ 5 (9 Z,� , Geaeral Cootrtctor Company/Owner name0 (please print or type) Signature Date Special Inspector/Agency acme _ 1, 4 Q 1 le� i t'Jyisg ern , •+�.� / !4 "'Osc-q 1 Puldr, (Please ' t oi�yPe) 1/� t,I ��j1i'clrN t' Signature Date -4 • / i ' C ,Ff- i ArchitecUTAgineer of Record name (please print or type) Signature Date Return the original signed agreement to the Building Division City of Edmonds Building Division 121 P Avenue North, City Sall Second Floor Edmonds, WA 980M ACCEPTED BY CITY OF EDMONDS BUILDING DIVISION: City Official Signature Tate Title: U,•►R&lit.i:.w%ypWrW-jj rr At cmt'nt:/hy—.rnTr.�mrrrv►n►�a�_-,Ay, TOTAL P.04 https: //www2. sea. accessl ine. com/exec/tel eweb?uifwa=convertJpeg&---tdifnnixi ampnlI 4/17/2008 .._ ; CITY OF EDMONDS 121 5TH AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 • FAX (425) 771-0221 Website: wwwdedmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT In c 1890 Planning • Building • Engineering April 1, 2009 Stephanie & Jouni Paavola 24225 107th PL W Edmonds, WA 98020 RE: Building Permit Number: BLD20080141 Site Address: 24225 107th PL W Dear Mr. & Mrs. Paavola, GARY HAAKENSON MAYOR The subject building permit is due to expire on May 22"d 2009. ECDC 19.00.005 requires that a progress building inspection be made in order to renew a building permit for a second year. Our records show that no building inspections have been conducted on this project. Due to the difficult economic situation that presently exists, the City Council approved a code amendment allowing a permit applicant to request a waiver of the required progress inspection from the Building Official in order to renew the permit if work has not started on the project and no code violations exist. This request must be made prior to expiration of the permit. The written request to the Building Official must include: V= Statement requesting waiver of progress inspection Statement that work has not started on the project and no code violations exist on the property (this will be verified by the Building Inspector prior to granting of the waiver) Reasonable cause unrelated to the neglect or fault of the permittee as to the reason work has not started on the project Estimated date by which work will begin If the waiver of the progress inspection is granted, the renewal fee shall be charged at a rate of one half the original building permit fee. If you feel your project qualifies for this exception, please submit your request to the Building Official prior to permit expiration. Sincerely, Linda Thornquist Permit Specialist / City of Edmonds L:\TEMP\DST's\Master Letters\TempRenewal.doc4/1/2009 • Incorporated August 11, 1890 • Sister City - Hekinan, Japan v U 00 O n U m 2 E V4) C o CM c 0 0 O O N O @� G A u s x 0 s A u s o s N L 0. ¢- 0, t> ¢ x s L 0 ¢ 0. X cn 0... '^ � L 7 P; O s a O WO A N 0 i s � O ,� A C ¢ C v N 0 C O wQ s i W G N . v o o 0 L 0 o s = c vi L o- 0co H CL o co H lil ti LU J a•a LU 0- �1 f 00 Ev CL 00 V) co H