Loading...
BLD20110410.pdfCid OF E� Oyn d STATUS: ISSUED 8/2/2011 Expiration Date: 2/2/2012 Parcel No: 27033600106100 CITY OF EDMONDS. 121 5TH AVENUE NORTH - EDMONDS, WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 i Permit #: BI,D2011 ___Project Address: 23014: EDMONDS WAY, ED GRE EDMONDS WAY LLC STUDIO MENG STRAZZARA VENTURE GENERAL CONTRACTING INC. 2801 ALASKAN WAY SUITE 310 CHRIS DAVIDSON 2801 ALASKAN WAY SUITE 310 SEATTLE, WA 98121 2001 WESTERN AVE, SUITE 200 SEATTLE, WA 98121 SEATTLE, WA 98121 (206) 215-9734 EXT: (206) 587-3797 EXT: (206) 834-6402 EXT: LICENSE #: VENTUec899lz EXP:6/9/2013 CLEARING, GRADING, DEMOLITION. VALUATION: $0.00 PERMIT TYPE: Commercial PERMIT GROUP: 28 - Fill/Grade/Excavate GRADING: Y CYDS: 4900 TYPE OF CONSTRUCTION: RETAINING WALL ROCKERY: N OCCUPANT GROUP: OCCUPANT LOAD: FENCE: N 0 X 0 FT. CODE: 09 OTHER: N ----- OTHER DESC: ZONE: NUMBER OF STORIES: 0 VESTED DATE: NUMBER OF DWELLING UNITS: 0 LOT #: BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 3RD FLOOR: 0 GARAGE. 0 DECK. 0 OTHER: 0 13RD FLOOR. 0 GARAGE: 0 DECK: 0 OTHER: 0 FRONTSETBACK SIDE SETBACK REAR SETBACK tE UIRED: PROPOSED: RE UIRED: PROPOSED: RE UIRED: PROPOSED: -1EIGHT ALLOWED:O PROPOSED:O RE UIRED: PROPOSED: 'ETBACK NOTES: I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND AI L FEES ARE PAID. Signature Print Name Date Released By Date ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC 109/ IBC 10/ IRC I 10. ONLINE APPLICANT ASSESSOR OTHE "--ASP 01 0 STATUS: ISSUED BLD20110410 • REQUIRED SPECIAL INSPECTIONS FOR THIS PROJECT: • 1) Excavation, grading, & site preparation • 2) Soil bearing verification • 3) Placement of fill & compaction • 4) Footing drain • 5) Temporary Erosion Control • 6) Final Erosion Control • 7) Site retaining wall/ rockery construction. • 8) General site monitoring • 9) Final letter from geotechnical engineer of record • 10) Soldier pile placement • 11) Field Welding • 12) Concrete • Special inspections have been called for on this project and are noted on the approved construction plans and building permit. It is the owner and/or contractors responsibility to assure that reports are provided to the City on a weekly basis. Be advised -- if special inspection reports are not forthcoming, the Building Official may issue a "Stop Work" and no City inspections will be provided until such time as the reporting agency has complied and reports are reviewed and approved by the City. • Submit all special inspection reports to the City Building Inspector on a weekly basis. • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from O adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City ""s ability to enforce any ordinance provision. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) CALL FOR INSPECTIONS BUILDING 425) 771-0220 EXT. 1333 1 ENGINEERING 425 771-0220 EXT. 1326 FIRE 425 775-7720 PUBLIC WORKS 425) 771-0235 1 PRE-TREATMENT 425) 672-5755 1 RECYCLING 425) 275-4801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being reauested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon. • E -Pre -Con • E -Erosion Control/Mobilization • E -Storm Tightline 0 • E-Storm Connect to Stub • E-Infiltration System • E-Pavement Striping E-Tree Protection Fencing • E-Trash Enclosure E-Engineering Final • E-Project Asbuilt • B-Building Final • Special Inspecton-Final Report • E-Tightline Drain Connection 0 OV E°Mo Inspection Comments BLD20110410 28 - Fill/Grade/Excavate enc 1 Applied: 06/01/2011 Issued: 08/02/2011 Expires: 05/24/2012 g9p Address: 23014 EDMONDS WAY, EDMONDS INSPECTION DATE *INSPECTOR ACTIQN -- - -- -- - - - ------------------------/2-5-/2--01-1 1000 - E -Pre -Con 07/25/2011 MCCONNELL COM Comment: Appendix 7 of the SWPPP - Construction Site Sediment Damage Potential has been reviewed. By approving the SWPPP we agree with their TESC approach. ' 1000 - E -Pre -Con 07/27/2011 MCCONNELL COM Comment: Did a site walk through to discuss frontage, TESC, etc. 1000 - E -Pre -Con 09/23/2011 MCCONNELL COM Comment: Met on site to discuss staging of frontage improvements, traffic control, inspections, etc. Will submit TCP requesting night closure while they are doing curb and asphalt restoration. 1000 - E -Pre -Con Comment: Project finaled. 07/13/2012 MCCONNELL CMP 1001 - E -Erosion Control/Mobilization 07/25/2011 MCCONNELL COM Comment: Appendix 7 of the SWPPP - Construction Site Sediment Damage Potential has been reviewed. By approving the SWPPP we agree with their TESC approach. 1001 - E -Erosion Control/Mobilization Comment: TESC adequate at this time. 1001 - E -Erosion Control/Mobilization Comment: Project finaled. 08/19/2011 MCCONNELL PAR 07/13/2012 MCCONNELL CMP 1013 - E -Storm Tightline 08/31/2011 ZULAUF, COM Comment: Hit 24" storm pipe not shown on plans. Not a City line. Met with Jeff on site -determined that the pipe is unused and discussed with Jerry. Permission given to demo pipe on Apt property. Lonnie will fill/cap pipe with blocks and CDF. 1013 - E -Storm Tightline 08/31/2011 ZULAUF COM Comment: placement of CB#6 and CB#8 and connection between 1013 - E -Storm Tightline 09/29/2011 MCCONNELL COM Comment: Okay to backfill from CB4 to CB 5 and stub out from CB 5 for south building roof & footing connections. 1013 - E -Storm Tightline 10/19/2011 ZULAUF PAR Comment: partial t/I ok to b/f - see civils. 1013 - E -Storm Tightline 10/19/2011 MCCONNELL PAR Comment: Partial - south section of tightline on north building. Connected to storm infiltration system. Also mudding on manhole near south building entrance. See civils. 1013 - E -Storm Tightline 04/18/2012 MCCONNELL COM Comment: ... with Sibrel. Inspection done in conjunction with final for bld20110566. All CB's mudded properly behind north building. CB at entrance to and inside south building not inspected for final approval. Entire system needs to be cleaned again. 1013 - E -Storm Tightline 07/13/2012 MCCONNELL CMP Comment: Approved. 9/7/2012 11:11:09 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 1 of 3 --- ----- — INSPECTION— —DATE INSPECTOR' ---� ACTION-' --- --- 1014 - E -Storm Connect to Stub 09/02/2011 ZULAUF COM Comment: connection to existing cb at northeast property corner to stub for rain garden. 1014 - E -Storm Connect to Stub 07/13/2012 MCCONNELL CMP Comment: Approved 1016 - E -Infiltration System 09/23/2011 MCCONNELL COM Comment: Partial - north end of system up to manhole in middle. See civils. 1016 - E -Infiltration System 09/26/2011 LAMBERTJ PAR Comment: Partial - middle of system to approx 3/4 to the east 1016 - E -Infiltration System 09/27/2011 LAMBERTJ COM Comment: Partial - completed the infiltration system - system was bedded properly and wrapped in landscape fabric 1016 - E -Infiltration System 05/04/2012 MCCONNELL CMP Comment: Approved 1051 - E -Pavement Striping 05/04/2012 MCCONNELL CMP Comment: Approved 1059 - E -Tree Protection Fencing 07/13/2012 MCCONNELL CMP Comment: Project finaled. 1075 - E -Trash Enclosure 07/13/2012 MCCONNELL CMP Comment: Approved 1075 - E -Trash Enclosure 08/28/2012 MCCONNELL COM Comment: Gates being installed - not finished yet. 1075 - E -Trash Enclosure 08/30/2012 MCCONNELL COM Comment: AM inspection: Gates installed. Gates are scheduled for painting 8/30. 1075 - E -Trash Enclosure 09/07/2012 MCCONNELL CMP Comment: Ok to final. 1077 - E -Engineering Final 07/25/2011 MCCONNELL COM Comment: Pedestrian easement required for those portions of sidewalk that extend onto private property. 1077 - E -Engineering Final 07/13/2012 MCCONNELL COM Comment: Site construction approved. Working with Bruce and Lonnie on eaesments. 1077 - E -Engineering Final 08/09/2012 MCCONNELL COM Comment: 8/14 - Easements scheduled for PPP Committee 8/21 - Easements scheduled for Council Approval 1077 - E -Engineering Final 08/10/2012 MCCONNELL CMP Comment: Easement recording complete. ' 1079 - E -Project Asbuilt 05/04/2012 MCCONNELL CMP Comment: Asbuilts submitted to City in May. 1120 - B -Plumb Ground Work 08/19/2011 LAWLER PAR Comment: building drain approved to gridline 19 9/7/2012 11:11:09 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 2 of 3 INSPECTION DATE INSPECTOR, z- ACTION 1 1120 - B-Plumb Ground Work 07/13/2012 MCCONNELL CMP Comment: Project finaled 1158 - B -Building Final Comment: 04/30/2012 LAWLER 3004 - Special Inspecton-Final Report 08/09/2012 Comment: See permits bId20110567 and bId20110566 MCCONNELL CMP CMP 9/7/2012 11:11:09 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 3 of 3