BLD20110411.pdfV�oF E�o��
0
STATUS: ISSUED 8/2/2011
Expiration Date: 8/2/2012
Parcel No: 27033600106100
CITY OF EDMONDS
121 5TH AVENUE NORTH - EDMONDS, WA 98020
PHONE: (425) 771-0220 - FAX: (425) 771-0221
Permit #: BLD2011041
Project Address: 23014 EDMONDS WAY. E
GRE EDMONDS WAY LLC STUDIO MENG STRAZZARA VENTURE GENERAL CONTRACTING INC.
2801 ALASKAN WAY SUITE 310 CHRIS DAVIDSON 2801 ALASKAN WAY SUITE 310
SEATTLE, WA 98121 2001 WESTERN AVE, SUITE 200 SEATTLE, WA 98121
SEATTLE, WA 98121
(206) 215-9734 EXT: (206) 587-3797 EXT: (206) 834-6402 EXT:
LICENSE #: VENTUGC899LZ EXP:6/9/2013
45 SOLDIER PILES SHORING WALL.
VALUATION: $179,000.00
.co'm"'PLETED
PERMIT TYPE: Commercial
PERMIT GROUP: 58 - Retaining Wall/Bulkhead
GRADING: N CYDS: I
TYPE OF CONSTRUCTION:
RETAINING WALL ROCKERY: N
OCCUPANT GROUP:
OCCUPANT LOAD:
FENCE: N 0 X 0 FT.
CODE: 09
OTHER: N ----- OTHER DESC:
ZONE:
NUMBER OF STORIES: 0
VESTED DATE:
NUMBER OF DWELLING UNITS: 0
LOT #:
BASEMENT: 0 I ST FLOOR: 0 2ND FLOOR: 0
BASEMENT: 0 IST FLOOR: 0 2ND FLOOR: 0
3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
3RD FLOOR: 0 GARAGE. 0 DECK. 0 OTHER. 0
FRONTSETBACK SIDE SETBACK REAR SETBACK
REQUIRED: PROPOSED: RE UIRED: PROPOSED: I REQUIRED: PROPOSED:
HEIGHT ALLOWED:O PROPOSED:O I REQUIRED: PROPOSED:
SETBACK NOTES:
1 AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO
PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S
COMPENSATION INSURANCE AND RCW 18:27.
THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID.
me
ATTENTION
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF
OCCUPANCY HAS BEEN GRANTED. UBC 109/ IBCI 10/ IRCI 10.
ONLINE APPLICANT ASSESSOR OTHE
•
•
STATUS: ISSUED BLD20110411
CONDITIONS
• Grading and TESC associated with retaining wall construction per civils under building permit bld20110410.
• Lot line stakes must be in place at the time of foundation/setback inspection.
• Special inspections have been called for on this project and are noted on the approved construction plans and building permit.
It is the owner and/or contractors responsibility to assure that reports are provided to the City on a weekly basis. Be advised—
if special inspection reports are not forthcoming, the Building Official may issue a "Stop Work" and no City inspections will
be provided until such time as the reporting agency has complied and reports are reviewed and approved by the City.
• *Pre -inspection required.
• *Street to be cleaned of debris.
• *Side sewer must be capped at property line.
• *Water Service must be disconnected from Water meter and or hose bib with AVB installed.
• *Dump at approved dump site only.
• *See demolition inspection checklist on back of job card for inspection requirements.
• Submit all special inspection reports to the City Building Inspector on a weekly basis. '
• Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of
the building or structure. Check the job card for all required City inspections including final project approval and final
occupancy inspections.
• Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from
adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing
fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable.
• Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been
specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision
of city code or state law does not approve any items not to code specification.
• Fences, gates, and arbors shall be located on private property. Property owner responsible for determining property lines.
Fence shall not enclose or prevent access to any City maintained utilities.
• Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits
of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays,
excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must
comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
• Maintain erosion & sedimentation control per city standards.
• Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is
caused by or occurs during the permitted project.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE
PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION.
PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6)
CALL FOR INSPECTIONS
BUILDING 425 771-0220 EXT. 1333 ENGINEERING 425 771-0220 EXT. 1326 FIRE 425 775-7720
PUBLIC WORKS 425) 771-0235 1 PRE-TREATMENT 425) 672-5755 1 RECYCLING 425) 275-4801
When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection
being requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon.
• E -Erosion Control/Mobilization
• E -Retaining Wall Drainage
• E -Engineering Final
• B -Setbacks
• B -Foundation Drainage
• B -Isolated Footings/Piers
• B -Retaining Wall
• B -Building Final
•
0 X -Special Inspection
•
Inspection
Comments
BLD20110411
58 - Retaining Wall/Bulkhead
Applied: 06/01/2011
Issued: 08/02/2011
Expires:
Address: 23014 EDMONDS WAY, EDMONDS
INSPECTION
DATE
INSPECTOR
1001 - E -Erosion Control/Mobilization
07/13/2012
MCCONNELL
Comment: Site restoration complete.
1054 - E -Retaining Wall Drainage
07/13/2012
MCCONNELL
Comment: Engineering did not inspect wall drainage. All done by special inspection.
1077 - E -Engineering Final
07/13/2012
MCCONNELL
Comment: Site construction complete.
Okay to final.
1106 - B -Setbacks
04/23/2012
LAWLER
Comment:
1112 - B -Foundation Drainage
04/23/2012
LAWLER
Comment:
1114 - B -Isolated Footings/Piers
04/23/2012
LAWLER
Comment:
1116 - B -Retaining Wall
04/23/2012
LAWLER
Comment:
1158 - B -Building Final
04/23/2012
LAWLER
Comment:
3004 - X -Special Inspection
04/23/2012
LAWLER
Comment:
08/02/2012
ACTION
CMP
CMP
CMP
CMP
CMP
CMP
CMP
CMP
CMP
2/5/2013 8:24:11 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 1 of 1