Loading...
BLD20110411.pdfV�oF E�o�� 0 STATUS: ISSUED 8/2/2011 Expiration Date: 8/2/2012 Parcel No: 27033600106100 CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 Permit #: BLD2011041 Project Address: 23014 EDMONDS WAY. E GRE EDMONDS WAY LLC STUDIO MENG STRAZZARA VENTURE GENERAL CONTRACTING INC. 2801 ALASKAN WAY SUITE 310 CHRIS DAVIDSON 2801 ALASKAN WAY SUITE 310 SEATTLE, WA 98121 2001 WESTERN AVE, SUITE 200 SEATTLE, WA 98121 SEATTLE, WA 98121 (206) 215-9734 EXT: (206) 587-3797 EXT: (206) 834-6402 EXT: LICENSE #: VENTUGC899LZ EXP:6/9/2013 45 SOLDIER PILES SHORING WALL. VALUATION: $179,000.00 .co'm"'PLETED PERMIT TYPE: Commercial PERMIT GROUP: 58 - Retaining Wall/Bulkhead GRADING: N CYDS: I TYPE OF CONSTRUCTION: RETAINING WALL ROCKERY: N OCCUPANT GROUP: OCCUPANT LOAD: FENCE: N 0 X 0 FT. CODE: 09 OTHER: N ----- OTHER DESC: ZONE: NUMBER OF STORIES: 0 VESTED DATE: NUMBER OF DWELLING UNITS: 0 LOT #: BASEMENT: 0 I ST FLOOR: 0 2ND FLOOR: 0 BASEMENT: 0 IST FLOOR: 0 2ND FLOOR: 0 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 3RD FLOOR: 0 GARAGE. 0 DECK. 0 OTHER. 0 FRONTSETBACK SIDE SETBACK REAR SETBACK REQUIRED: PROPOSED: RE UIRED: PROPOSED: I REQUIRED: PROPOSED: HEIGHT ALLOWED:O PROPOSED:O I REQUIRED: PROPOSED: SETBACK NOTES: 1 AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. me ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC 109/ IBCI 10/ IRCI 10. ONLINE APPLICANT ASSESSOR OTHE • • STATUS: ISSUED BLD20110411 CONDITIONS • Grading and TESC associated with retaining wall construction per civils under building permit bld20110410. • Lot line stakes must be in place at the time of foundation/setback inspection. • Special inspections have been called for on this project and are noted on the approved construction plans and building permit. It is the owner and/or contractors responsibility to assure that reports are provided to the City on a weekly basis. Be advised— if special inspection reports are not forthcoming, the Building Official may issue a "Stop Work" and no City inspections will be provided until such time as the reporting agency has complied and reports are reviewed and approved by the City. • *Pre -inspection required. • *Street to be cleaned of debris. • *Side sewer must be capped at property line. • *Water Service must be disconnected from Water meter and or hose bib with AVB installed. • *Dump at approved dump site only. • *See demolition inspection checklist on back of job card for inspection requirements. • Submit all special inspection reports to the City Building Inspector on a weekly basis. ' • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Fences, gates, and arbors shall be located on private property. Property owner responsible for determining property lines. Fence shall not enclose or prevent access to any City maintained utilities. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Maintain erosion & sedimentation control per city standards. • Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is caused by or occurs during the permitted project. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) CALL FOR INSPECTIONS BUILDING 425 771-0220 EXT. 1333 ENGINEERING 425 771-0220 EXT. 1326 FIRE 425 775-7720 PUBLIC WORKS 425) 771-0235 1 PRE-TREATMENT 425) 672-5755 1 RECYCLING 425) 275-4801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon. • E -Erosion Control/Mobilization • E -Retaining Wall Drainage • E -Engineering Final • B -Setbacks • B -Foundation Drainage • B -Isolated Footings/Piers • B -Retaining Wall • B -Building Final • 0 X -Special Inspection • Inspection Comments BLD20110411 58 - Retaining Wall/Bulkhead Applied: 06/01/2011 Issued: 08/02/2011 Expires: Address: 23014 EDMONDS WAY, EDMONDS INSPECTION DATE INSPECTOR 1001 - E -Erosion Control/Mobilization 07/13/2012 MCCONNELL Comment: Site restoration complete. 1054 - E -Retaining Wall Drainage 07/13/2012 MCCONNELL Comment: Engineering did not inspect wall drainage. All done by special inspection. 1077 - E -Engineering Final 07/13/2012 MCCONNELL Comment: Site construction complete. Okay to final. 1106 - B -Setbacks 04/23/2012 LAWLER Comment: 1112 - B -Foundation Drainage 04/23/2012 LAWLER Comment: 1114 - B -Isolated Footings/Piers 04/23/2012 LAWLER Comment: 1116 - B -Retaining Wall 04/23/2012 LAWLER Comment: 1158 - B -Building Final 04/23/2012 LAWLER Comment: 3004 - X -Special Inspection 04/23/2012 LAWLER Comment: 08/02/2012 ACTION CMP CMP CMP CMP CMP CMP CMP CMP CMP 2/5/2013 8:24:11 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 1 of 1