BLD20110437.pdfCITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 STATUS: ISSUED 7/15/2011 Permit #: BLD20110437 BUILDING PERMIT Expiration Date: 7/15/2012 Project Address: 1056 DALEY ST, EDMONDS! Parcel No: 00434204301500 WENDY PRIEST WENDY PRIEST LEXAR HOMES OF BURLINGTON 315 DALEY ST 315 DALEY ST 485 ANDIS RD EDMONDS, WA 98020 EDMONDS, WA 98020 BURLINGTON, WA 98233 (425) 778-1827 EXT: (425) 778-1827 EXT: ( ) EXT: LICENSE 4: LEXARHB905RF EXP: 12/6/2012 OB DESCRIPTION NEW SFR VALUATION: $220,228.80 COMPLETED PERMIT TYPE: Residential PERMIT GROUP: 64 - Single Family Residence ew GRADING: Y CYDS: 350 TYPE OF CONSTRUCTION: VB RETAINING WALL ROCKERY: N OCCUPANT GROUP: R3 OCCUPANT LOAD: FENCE: N ( 0 X 0 FT.) CODE: 09 OTHER: N ----OTHER DESC: ZONE: RS -6 NUMBER OF STORIES: 0 VESTED DATE: NUMBER OF DWELLING UNITS: I LOT 4: BASEMENT: 0 IST FLOOR: 0 2ND FLOOR: 0 BASEMENT: 0 1ST FLOOR: 1940 2ND FLOOR: 0 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 13RD FLOOR: 0 GARAGE: 528 DECK: 72 OTHER: 0 FRONTSETBACK SIDE SETBACK REAR REQUIRED: 20 PROPOSED: 20 REQUIRED: 5 PROPOSED: 7.9 RE UIRED:15 PROPOSED: 40 HEIGHT ALLOWED: 25 PROPOSED:15.9 REQUIRED: 5 PROPOSED: 5 SETBACK NOTES: 1 AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPLWW AND ALL FEES ARE PAID. �ytesk —I t Siurdlure Print Name Date Relea d B Date ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC 109/ IBC I 10/ IRC 110. ONLINE APPLICANT ASSESSOR �eQ�\'L/ STATUS: ISSUED BLD20110437 • Lot line stakes must be in place at the time of foundation/setback inspection. • Installer shall provide the manufacturer ""s installation, operating instructions, and a whole house ventilation system operation description. A label shall be affixed to the whole house timer control that reads "Whole House Ventilation" (see operating instructions). • Special inspections have been called for on this project and are noted on the approved construction plans and building permit. It is the owner and/or contractors responsibility to assure that reports are provided to the City on a weekly basis. Be advised -- if special inspection reports are not forthcoming, the Building Official may issue a "Stop Work" and no City inspections will be provided until such time as the reporting agency has complied and reports are reviewed and approved by the City. • Hose Bibbs (exterior faucets) are required to have a permanently affixed anti -siphon device installed. • In addition to the required pressure/relief valve, an approved listed expansion tank shall be installed on all hot water tanks. Per UPC 608. • Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309 • Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted. • Submit all special inspection reports to the City Building Inspector on a weekly basis. • Final approval on a.project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Provide combustion air per IMC Chapter 7 for commercial and multi -family residential installations, and IRC Chapter 17 for one and two-family dwellings. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City ""s ability to enforce any ordinance provision. • New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible from the street or road fronting the property. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be legible from the public way, at least 4 inches high with a %i inch min. stroke width on a contrasting background. • Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is caused by or occurs during the permitted project. • Owner/Contractor to provide Water Service Line asbuilt at final inspection. See City Standards for requirements. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) BUILDING (425) 771-0220 EXT. 1333 1 ENGINEERING (425) 771-0220 EXT. 1326 1 FIRE (425) 775-7720 1 PUBLIC WORKS 425 771-0235 PRE-TREATMENT 425) 672-5755 RECYCLING 425 275-4801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection beine reauested. Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon. • E -Erosion Control/Mobilization • E -Storm Tightline E -Infiltration System • E -Footing Drywell • E -Water Service Line • E -Driveway Form & Slope Ver. • E -Engineering Final B-Preconstruction meeting • B -Setbacks • B -Footings B -Foundation Wall • B -Foundation Drainage B -First Floor Framing • B -Plumb Rough In • B -Gas Test/Pipe • B -Mechanical Rough In • B -Exterior Wall Sheathing • B -Roof Sheathing • B -Height Verification • B -Framing • B -Wall Insulation/Caulk • B-Insulation/Energy B-Sheetrock Nail • B -Building Final E-Curb/Gutter Post -Pour i om rte., 1 f a)l a � p c �a d O O N M O � CL •a d L W d N EO� 0 d LL O M M w CL .0 y Os O O O O d L N VJ C s O• d +' O 3 s ,0 O H o aL O s N N s d N W O V m d U A m m r m O Z M O r r N O J m 'O a L r O N .N y�! ZLU '. Q.Do N jV m �.� ~ •O ,. ? E� �� 1` . .. LL p to105 Iz WRQ. M O Z.O Z \ \ _ c_ a yE �- IL Z H C d N O m O � c1 V .a LU N V% s o L Q - d s E O O N M O s N L d rte+ _ N V d V:O � •L E O V y 0 Q 0 Z Q rte., 1 f a)l a � p c �a d O O N M O � CL •a d L W d N EO� 0 d LL O M M w CL .0 y Os O O O O d L N VJ C s O• d +' O 3 s ,0 O H o aL O s N N s d N W O V m d U A m m r CA Q) Lc) O T- O N O co O (6 c O .a W (D U cu Lo U - U o U) �o co r CL C co C W Cl O O 0 O N M O O N 75 U L co CL LL OL Cr O N CO Z M O - 6 LONC14 �' m W to o U 1n -j m 9 Q)a UJ o o ai m j 04 O ai rn 'c L (L LLl w W U > moi' 7 G S58'-0" c I - 20'-0" ao 40'-1" U N N `\ 0 N O w N0CL U ' N O LL a _ I o O N` cr oy U rn i 1 > o o co > a� °� cu o 0 ami 00 :c a v cn ti ; CD t - CL Y cSf 0'5 c o 'a >>` o c o ZOp� O O U o co tOq n o c c v� ` p M a` cc A I w a� 0 > — m t S S _� a.. w! w U Y� I ` MV\ 0 3 con � 117'-6" o 0 m � Imo- a0 i O101 w U + N Q N 5 ow 5Q (�1 CD a�i z w w �Lu r CA Q) Lc) O T- O N O co O (6 c O .a W (D U cu Lo U - U o U) �o co r CL C co C W Cl O O 0 O N M O O N 75 U L co CL LL OL Cr O N CO Z M O - 6 LONC14 00 W 7.,- 0 1n -j Q Q UJ o 04 O N rn 'c WtCIC o Cs � z N ¢� cam, o w 0 an - 6 LONC14 00 W II + L -j Q Q 7 WtCIC o Cs � z N ¢� cam, o w 0 an l) �y iy C •x (Q - 6 LONC14 00 W II + L -j Q Q l) �y iy C •x (Q aF EDo SPECIAL INSPECTION AND TESTING AGREEMENT V~ N Permit #: U -0 fJ2 Project: FSr. t 89° —` Prior to issuance of a permit, this fora: must be completed in its entirety and returned to the City for approval. The completed form must have signatures of acknowledgment by all parties. DUTIES AND RESPONSIBILITIES Special Inspection Firm and Special Inspectors: The Special Inspection firm of 1-1 I+( it /�4 0 C;` le s will perform special inspection for the following types of w k (separate forms must be submitted if more than one firm is to be employed): ❑ Reinforced Concrete ❑ Bolting in Concrete ❑ Prestressed Concrete ❑ Shotcrete ❑ Structural Masonry ❑ Structural Steel/Welding ❑ High Strength Bolting ❑ Spray applied Fireproofing ❑ Smoke Control Systems ❑ Lateral Wood ❑ Structural Observation J@ Grading/soils ❑ Other ❑ Other All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector and the firm are qualified by education and experience to perform the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall include: A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. LABuilding New Folder 2010\F0rms\Specia1 inspection form.docl 0/25/20 10 Intrigue of the Past: Lesson 2.4 Activity Sheet In what year of growth was there the most rainfall? PDI version This lesson Next lesson Main menu RLA home Page 2 of 2 k http:"/rla.unc.edu/lessons/Lesson/L204/H2O4b.htm 6/12/2011 �r Contractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at the jobsite for the use of the special inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. BuBdinst Department: The building department shall review any revisions and addenda. The City inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Design Professionals: The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required. and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to insure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS I have read and agree to comply with the terms and conditions of this agreement. !�1 end�Irt-e_S4�, Date z �' Owner: U_____ Signature J� Date: 27 Contractor: SGL .CH��//9''�� G c C Signature �� �� tJ i P, i U t.. IU )Arch./Eng:. jeG �t �_ t . Signa Date: Special Insp. Signature Date: ACCEPTED FO THE CrN OF EDMONDS BUILDING DEPT. By: Date: �'2,Y4 UBuilding Naw Foldar 201"ormsl,Spe W MINCOM form.doc10/25/2010 LILT & ASSOCIATES, INC. Geotechnical Engirteesing - Engineering Geology - � June 13, 2012 -- Mr. Wendy :Priest foss L9)6`Daley Street Edmonds, WA 44020 Dear Mi s. Priest: Subject: Final Inspection Report Priest Residence IV 5(, ;d0l Daley Street Edmonds, Washington L&A Job No. 11-004 j�Zol (-0. f3 Earth Science We ha-ve provided geotechnical inspection services for the construction € f the subject residence. Items we have inspected include: 1) temporary erasion control withdristallation of salt fence and rolls of hay on the downhill side of the residence site, 2) verification of soil at bottom of infiltration trenches, 3) footing Bearing soil verification. 4) .subgrade soil protection with compacted crushed rock fill, and 5) final erosion control. The Daily Field Reports documenting our inspections of the above items are attached hereto for your review. Based on our observations, it is our Opinion that the geotechnical construction work items listed above are completed in accordance with city approved plans and specifications, and is acceptable. Please contact Attach.: Daily Field Reports I through a Yours very truly, LTU SSOCIA , NC. r I S. ((Ju cart) Liu, Ph,D,, P.E. Consulting; Geotechnical Engineer 19213 Kenlalce Place NE Kenmore, Washington 98029 Phone (425) 483-9134 - Fax (425) 486-2746 DAILY FIELD REPORT JO F().. jL Helcl eep, 7a-ge --[TeT3ff7F5. LTU & ASSOCIATES, INC 1 1-OG4 J. Liu I of 1 1 Fit--iuctrinu. Ex,^n�-,rinv ciz,,,,,�- & v.ir,i s,:; i7iles Tmo Cn Site Cay of Weei 32 12:20P 8/912011 Tues. 192.13 KenlakePlace NT- Travel -time ,Prs- :,ma C f.- Site 'Weather KCTI.T.110M. Wasbington 98028 1 12.:45P Cloudy Phonc-:14215,;483-91.34 Fax: (42-5)486-2146 --P- -- 75-FiTle I's on $1. e r3 (--�a rd project tot) C-cabon Wendy Priest ResWen.ce 1056 Daley Street. Edmoftds Wendy Priest General Contractor General Contract --r Pxoj, Nla.-janer 9eceived Unchecked By. SCL Enterprises LLC Shaun Leiser Sa-11!T,Vor1x G=jactor Earth=-rk Contractor Supt. ReQeived Checked By At the request of Shaun Leiser with SCL Enterprises LLC, I come on site today to obsenm erosion mitigation measures being implemented for the subject project site. At the time of my site visit, a silt fence has already been installed along the north (downhill) side of the site east of the existing paved driveway. Also, SCL has a worker installing rollers of hay wad along the east and west sides of the site where required to prevent sediment movement by runoff. It is my opinion that the erosion mitigation measures already implemented are acceptable. .. ......... ....... ...... F -t-4455 77 171 Copy to, Continued 11 Shaun Leiser/SCL. Enterprises LLC 2) Wendy Priest on Next 4) Page DAILY FIELD: REPORT I-JU & ASSOCIATES, INC. 11-004 J. Liu 1 of 1 2 32 Trra! 1:15P Date 813012011 -141 ".. vVe" Tues, 02 1 ', Kerslake PMU NE Tra-vel'rime (Hrs) rime orr Site V'Veatmr Kenn.iore, Washington IM28 1 1:35P Partly Cloudy `remcie Hfs cri 51e HrS Charged 1 %viors Phonc., ! 42 5) 4S,3-9 13-4 Fa.-,. t425) 486-2-74o 1.25 Project cryLjOU40A Residence 056 Daiey Street, Edmonds %i%lendy P.-.iest -Wend,y_Pries! General Contractor Gerveral Grntraut^.r -Pro," P4ar,"Iger Receiwd Unrhecked Sy SCL EnterrAses LLC Shaun Leiser At the request of Shaun Le iser with SC L Enterp6ses Ll -C, I come on site today to observe the 1 rifi Itrat i o n trench already excavated and the soil condition in the trench. The trench is about 6 ft wide by 5 ft deep by 40 ft long, and . ......... . ..... is CLA through a 2.5 layer of peat and layers of sand and gravelly sand about 2.5 to 3 feet thick., then into a silty Sand deposit. Minor groundwater seepage is observed at bottom of the trench,, It is myopinionthat the trench meets the requirement shown_ on the plans. 1) Shaun Leiser/SCL EoterlpilSeS LLC El Continued 2) Wendy PdQzit I on Ncxt LIU & ASSOUXTES, INC. 11-004 i I 1. J.dr.� hes 32 1921. ' , Kmlake Pldx NE N�ne iq KCHTM - ).rC, Washington t)80_)� .(4) l Phenc:i425)4S3-91_'34 Fax . 5086-2'46 Vehicie Hrs J. Liu 1 1 of 1 3 •1 rie -:;r. Site Da"a 1:15P 1813M'201 Tues. ; ime Off Site Weather 1:45P I Sun ny r�,rs Charged1visitars 1 1.5 1 Wendy Drtest Res!denc� 11055 r, a: e Y street. Ed m o r. d s; 1`41endy Priest. --I Gereml Contractor General Contractor Proi. klanagef 'Recacmd Unchecked By SOL Enterprises LLC 18halin Leiser At the: request of Shaun Leiser with SCL Enterprises LLC, I come on site today to observe preparation of footing beadng subgrade soil . At the time of my site visit, $CL Enterprises has already completed building footprint excavation, Due to the presence of loose organic soil, the building footprint has to be aver -excavated up to 3 to 4 feet, -rock spall fill. The organic soil has Mostly been excavated out down to a blue -gray deposit of slightly silt fine to medWrn sand with a trace to some gravel. Two puddles of standing water lie at the, northeast and the south-viest corner of the excavation. It is my recommendation that any loose disturbed soil at bottom of excavation should be. removed down to firm native bearing soil. The over-rexcavallon should then be backfilled with 2 -to -4 -inch fork spalls to finish.subqlade. The rocX. spalls shoutd be placed in lifts no more thar, Ed.' inches J'ntck, with c2ch 51 -ft compacted to a non-yie!d1rg state with a vibratory mechanical compactor. -The rock spall fill should oe topped wiln ti 6-ich layer of 2 -inch -minus crushed rock. also to be compacted to a non -yielding State. The footing foundations may Men be poured on the crushed rock base, .A sump pit should be installed at one of the comers, of the building footpOnt. Tije pit should be lined by a layer.of non -woven filter fabric and backfilled with clean viasbed,3M-W-24nch gravel. A surnp pump should be installed if) the SUMP Pit to PUMP out water which may accumulate in the 4oUM1119 footprint excavation. .. . . ...... 71 ISO Continued 1) Shaun LeisevSCL Enterprises LLC Z) Weady Priest on Next q1 41 Page DAILY FIELD REPORT JoD No. �ta Neo,Fage —7e—P—r1r7,T-- LIU & ASSOCUTES, INC. 11-004 J. Liu 1 of 1 4 GvAcdmi,wl Enguwcnng, LLI�;MCtrUL'. & E Ta FLh�-, Mijes 1':rr.-e On Site Date Day of Week 32 12:15P 916/2011 Tues. 192111 Kee lane Place NF, Travel Time (Hrsj Time Off &1e Weather Kcnjvot-C, W1,01filgilon 98029 1 12:40P Isunny 1,111o7ic. (4"4) (415) JR .2;46 Vehic!F, Hrs --n S �Ie Hr-- charged VhAtars 1,25 , endy Priest Residence 'N 1056 Latey Street, Edmonds Wendv Priest General Contractor Goriaraclv Proi, Man -ager Received Unchecked 6y SCL Enterprises LLC Shaun Leiser Eaethwork Conuzirtor E@,Qhwark CantTac4or Supt.. Received Chocked By At the request of Shaun Leiser with SCL Enterprises LLC, I come on site today to observe preparation of subgcade soil and placement of rock spalls to backfill building footprint over -excavation. SCL Enterprises has brr�ught in several mirk loads of 2 -to -4 -inch rock spalls to the site and has a haavy vibratory roller compactor onsite to compact the rock spall fill. ------ Loose disturbed soil has been removed from bottom of building footprint e=avatjon. SCL has started pjacing rock spalls in the northeast corner area of the excavation and compacted the rock fill with the roller compactor. The already placed rock spall fill appears to have been compacted to a very dense state. 7 01;80M 71171 411VI3 copy to, Continued 1) Shaur, LeiseriSCL Entcrpdses LLC 2) Wendy Priest on Next 3), 4" Page DAILY FIELD REPORT - Job No. .. _., laJo ED... ._ agE ..... LTi & ASSOCIATES, CiCUi�li}liUCgt Egi iwvftn_, Lll`_-it-evriu- Gioulug� & Euth ,Sticrim J 11-004 J. Liu 1 of 1 � miles Time Or. Sae ate Day of Wee 32 1:50P 6/13/`2012 Wed. I 1!Y213 Keniake Place \7E Travel Time (Hrs) Time Off Site bveather Y-enmflre_ lVashingto.n 93028 1 2 ubl- Light Rain Phone- 02>) 433-9l34 Fnx: 44?51 136-2?4fi Vehicle Hrson Sita Hrs Charged 'rsitors 1.2 rater'Job Urcabon utient Wendy Priest Residence 1 C Daley$treet, Edmonds. Wendy.Priest General C4M1racUw General Contractor Prot, Manage Received Unchecled By SCL Enterprises LL -C Shaun Leiser EaxthwD&,,Contractor Earthwork contractcn Supt. Received Checked Sy At the request of Rick Godsalve, I come on site today to have an observation of final erosion control of the subject project site. At the time of my site visit, final grading of the site has been completed and the ground within the site is graded nearly level except along the north boundary of the site where it drops.off northward about 1 to 4 feet down to Daley Street. No signs of erosion from surface runoff or groundwaterseepage are observed within the site. The _ unpaved exposers ground is covered by grass sod, shredded bark and crushed rock, Planting of trees and shrubs may ensue, but it is my opinion that final erasion control is completed for the site. — --- L- _- t Copy to. Q Continued 1) Shaun Leiser/SCL Enterprises LLC 2) Wendy Priest on Next 3) 4) Page °� E°^'� Inspection Comments N BLD20110437 64 - Single Family Residence New Applied: 06/09/2011 Issued: 07/15/2011 Expires: 07/15/2012 �qc. 1890 Address: 1056 DALEY ST, EDMONDS INSPECTION ------ _ -- ---DATE - -INSPECTOR ACTION 1001 - E -Erosion Control/Mobilization 01/11/2012 ZULAUF COM Comment: ok 1001 - E -Erosion Control/Mobilization 06/26/2012 ZULAUF CMP Comment: ok at final 1013 - E -Storm Tightline 01/09/2012 SIBREL CMP Comment: Tightlines OK. CB in driveway moved east and is now located where the front infiltration system overflow is. Driveway runoff directed to CB via a curtain drain. 1014 - E-Asbuilt 06/12/2012 ZULAUF CMP Comment: received 1016 - E -Infiltration System 01/09/2012 SIBREL CMP Comment: Rear infiltration system installed and inspected by geotech. Inspection is acceptable. 1 1018 - E -Footing Drywell 01/11/2012. ZULAUF CMP Comment: 1034 - E -Water Service Line 12/30/2011 LAMBERTJ PAR Comment: OK to backfill - Connected to meter Need: -Verify connection at house -Tracer wire needs to be grounded at house and meter -Asbuilt 1034 - E -Water Service Line 06/12/2012 ZULAUF COM Comment: received as built 1034 - E -Water Service Line 06/26/2012 ZULAUF CMP Comment: ok at final 1044 - E -Driveway Form A Slope Ver. 06/26/2012 ZULAUF CMP Comment: ok at final 1077 - E -Engineering Final 06/26/2012 ZULAUF CMP Comment: ok to final 1101 - B-Preconstruction meeting 08/26/2011 LAWLER CMP Comment: 1106 - B -Setbacks 12/16/2011 LAWLER CMP Comment: 1108 - B -Footings 12/12/2011 LAWLER CMP Comment: 1110 - B -Foundation Wall 12/16/2011 LAWLER CMP Comment: 6/27/2012 7:29:07 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 1 of 3 JINSPECTION- DATE . INSPECTOR= 1112 - B -Foundation Drainage 12/20/2011 LAWLER CMP Comment: 1114 - B -Isolated Footings/Piers 12/20/2011 LAWLER CMP Comment: 1122 - B -First Floor Framing 01/12/2012 LAWLER CMP Comment: 1126 - B -Plumb Rough In 01/31/2012 LAWLER CMP Comment: 1128 - B -Gas Test/Pipe 02/06/2012 LAWLER COR Comment: low test bond with #6 AWG 1128 - B -Gas Test/Pipe 02/21/2012 LAWLER COR Comment: Low test, bonding okay 1128 - B -Gas Test/Pipe 02/23/2012 LAWLER CMP Comment: 1130 - B -Mechanical Rough In 02/06/2012 LAWLER COM Comment: install fireplace _ J 1130 - B -Mechanical Rough In 02/21/2012 LAWLER COR Comment: Sleeve csst at fireplace 1130 - B -Mechanical Rough In 02/23/2012 LAWLER CMP Comment: 1132 - B -Exterior Wall Sheathing 01/24/2012 LAWLER CMP Comment: 1133 - B -Roof Sheathing 01/24/2012 LAWLER CMP Comment: 1142 - B -Framing 02/06/2012 LAWLER COR Comment: (Gas test at less than minimum for gauge CSST gas piping to be bonded with min. #6 AWG copper wire at point of entry to building. Install fireplace.) Floor sheathing nailing is severely over penetrated, retail with flush fasteners, one additional for each two overdriven, and no more than 1 inch from panel edge. 1142 - B -Framing 02/21/2012 LAWLER PAR Comment: Pending gas piping and HVAC corrections 1142 - B -Framing 05/17/2012 LAWLER CMP Comment: 1144 - B -Wall Insulation/Caulk 03/07/2012 LAWLER CMP Comment: 1146 - B-Insulation/Energy 06/26/2012 LAWLER CMP Comment: 1150 - B-Sheetrock Nail 03/09/2012 LAWLER CMP Comment: 6/27/2012 7:29:07 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 2 of 3 INSPECTION DATE :. INSPECTOR``ACTION 1158 - B -Building Final 06/26/2012 LAWLER CMP Comment: 3017 - E-Curb/Gutter Post -Pour 06/26/2012 ZULAUF CMP Comment: ok at final. O 6 - 6/27/2012 7:29:07 AM 121 5th Ave, Edmonds Washington 7 Phone: (425) 771-0220 Page 3 of 3 e -&-D no I 1 -0 Orl �r t- o,t,a City of Edmonds "- Site Classification Worksheet _ The project's Classification serves to identify the specific Stormwater Management requirements applicable to your site. Complete the worksheet below to determine whether your project falls into the classification of a Large Site, Small Site (Category 1 or Category 2), or a Minor Site. Sten 1: Determine the Exempt Impervious Surface Area for your project and enter it on line 1 of the table (yellow box). Step 2: Determine the Replaced Impervious Surface Area for your project and enter it on line 2 of the table below dividing the total between Exempt and Non -Exempt (orange and blue boxes); either or both may be zero. Step 3: Determine the New Impervious Surface Area for your project. If a portion of the new impervious surface area is also Non -Exempt Replaced Impervious Surface Area subtract this from the total of the new impervious surface area. Enter the final value on line 3 of the table below (blue box). Step 4: Add the values in the Non-exempt column for lines 2 and 3 and enter it into line 4 (green box). Where does the existing site ❑ Direct Discharge runoff discharge? Supplement (Check all that apply) Chapter 2.3 ❑ Edmonds Way Basin ❑ Creek Lake Basin See Watershed Map Figure -B, Handout pg 4 or Line Type Area (square Feet) Impervious surface: Supplement 1. Exempt How much and what type? Chapter 2.2 (fill in colored boxes)& Exempt it Non -Exempt See Definitions, Handout pg 9 Figure -C 2. Replaced Figure -C, Handout pg 7 Examples, Handout pg 10 3. New L4. ) _ Total Replaced +New (Non -Exempt) (add numbers in blue boxes) Land -disturbing activity area Supplement See Definitions, Handout pg 9 Chapter 8 sf Grading, Fill or Excavation Q4 (P S s5t5 - C1-4 Area Will project convert % acre or more of native vegetation to El YES �NO lawn or landscaped area? Proceed to the Project Classification Chart (Figure D, pg 8) and use the data collected above to follow the flow chart and determine the classification of your project. O Large Site (Handout E72a) mall Site (Handout E72b) ❑ Minor Site (Handout E72c) RECEIVED Revised on 719110 E72 - Stormwater Afanagement Erosion Control-FINAL2 JUN 0 8 2 W S of 11 BUILDING DEPARTMENT CITY OF EDMONDS Wendy Priest Project 1056 Daley St. Edmonds, Wa. 98020 Geotechnical Report Signed Copy � 4 4 JUN 0 q 2011 BUILDING DEPARTMENT GTY OF EDMONDS a LIU & ASSOCIATES, INC. Geotechnical Engineering Engineering Geology Earth Science March 15, 2011 Ms. Wendy Priest 315 Daley Street Edmonds, WA 98020 Dear Ms. Priest: Subject: Geotechnical Engineering Study New Single -Family Residence 315 Daley Street Edmonds, Washington L&A Job No. 11-004 INTRODUCTION We have completed a geotechnical engineering study for the site of a proposed new single-family residence, located at the above address in Edmonds, Washington. The general location of the residence site is shown on Plate 1 — Vicinity Map. We understand that the proposed development for the site is to build a new single-family residence to replace the existing one currently occupying the site. The purpose of this study is to characterize the subsurface condition of the site, evaluate feasibility of onsite stormwater disposal, and provide geotechnical recommendations for onsite stormwater disposal (if feasible), grading, erosion mitigation, surface and ground water drainage control, foundation design and construction, etc., for the proposed - development of the site. Presented in this report are our findings, conclusion and recommendations. PROJECT DESCRIPTION For our use in this study, you provided us with a property boundary plan of the residence site. According to this plan, the site is fronted by Daley Street with a 70 foot frontage and is about 19213 Kenlake Place NE - Kenmore, Washington 98028 Phone (425) 483-9134 - Fax (425) 486-2746 March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 2 117.5 feet deep. An existing house currently occupies the northern half of the site, which is to be demolished to make way for the planned new residence. The existing driveway will also be removed and replaced with a new paved driveway. We understand the new house is to be located approximately over the footprint of the existing house and is to be an above -grade, wood -framed structure supported on perimeter concrete foundation walls and interior bearing walls and columns. The building pad is relatively flat and construction of the new house would require minimal cut or fill. We also understand that onsite stormwater disposal with infiltration trenches is planned. SCOPE OF SERVICES To achieve the above purposes, our scope of services for this study comprises specifically the following: 1 Review the geologic and soil conditions at the site based on a published geologic map. 2. Explore the site for subsurface conditions with backhoe test pits to a firm bearing soil stratum and/or to a percolable soil stratum, or to the maximum depth (about 10 feet) capable by the backhoe used in excavating the test pits, whichever occurs first. 3. Perform necessary geotechnical analyses, evaluate feasibility of using an infiltration system to dispose stormwater onsite, and provide geotechnical recommendations for onsite stormwater proposal, grading, erosion mitigation, surface and ground water drainage control, foundation design and construction, etc., based on subsurface conditions encountered by the test pits and results of our geotechnical analyses. 4. Prepare a written report to present our findings, conclusions, and recommendations. LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 3 SITE CONDITIONS SURFACE CONDITIONS The site is situated on a gentle, northerly to northwesterly declining slope. It is bounded by Daley Street to the north and adjoined by single-family residences on its south, east and west sides. Within the residence site, the ground generally slopes very gently northward to its north boundary, then drops steeply a few feet down to the road level of Daley Street. This steep slope appears to be resulted from grading of Daley Street. The unpaved area of the site is mostly covered with lawn grass and dotted with occasional ornamental trees and shrubs. GEOLOGIC SETTING The Geologic Map of the Edmonds East and Part of the Edmonds West Quadrangles, Snohomish and King Counties, by James P. Minard, published by U. S. Geological Survey in 1983, was referenced for the geologic and soil conditions at the residence site. According to this publication, the surficial soil unit at and in the vicinity of the subject site is mapped as Advance Outwash (Qva) deposits. The geology of the Puget Sound Lowland has been modified by the advance and retreat of several glaciers in the past and subsequent deposits and erosions. The latest glacier advanced to the Puget Sound Lowland is referred to as the Vashon Stade of the Fraser Glaciation which had occurred during the later stages of the Pleistocene Epoch, and retreated from the region some 14,500 years ago. The advance outwash soil unit is composed of stratified sand and gravel with minor amounts of silt and clay, deposited by the meltwater of advancing glacial ice. Due to its generally granular composition, the advance outwash unit is of moderately high permeability and generally drains LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 4 well. The advance outwash deposits had been overridden by glacial ice and is generally dense to very dense in its natural, undisturbed state, except the top 2 to 4 feet where exposed which may be weathered to a loose to medium -dense state. The advance outwash soil can stand in steep cuts or natural slopes for a prolong period when undisturbed. Where exposed on slopes with poor vegetation cover and subjected to storm runoff, the advance outwash deposits can be gradually eroded and may slough off and re -deposited to a flatter inclination. The advance outwash deposits in their native, undisturbed state can provide good foundation support with< little settlement expected for light to moderate residential structures. SOIL CONDITION Subsurface condition of the site was explored with two test pits. These test pits were excavated on February 17, 2011, with a track -mounted backhoe to depth of 8.0 and 9.5 feet. The approximate locations of the test pits are shown on Plate 2 - Site and Exploration Location Plan. The test pits were located with either a tape measure or by visual reference to existing topographic features in the field and on the topographic survey map, and their locations should be considered only accurate to the measuring method used. A geotechnical engineer from our office was present during subsurface exploration, who examined the soil and geologic conditions encountered and completed logs of test pits. Soil samples obtained from each soil unit in the test pits were visually classified in general accordance with United Soil Classification System, a copy of which is presented on Plate 3. Detailed descriptions of soils encountered during site exploration are presented in test pit logs on Plate 4. LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 5 Test Pit 1, located near the southwest corner of the site, encountered a layer of topsoil about 8 inches thick. This topsoil is underlain to the depth explored by interbedded layers of medium - dense, silty fine sand, gravelly medium to coarse sand, fine sand and medium to coarse sand. Test Pit 2, located near the northeast corner of the site encountered about 2.5 feet of loose fill underlain by a foot of relic topsoil. The topsoil is again underlain to the depth explored by interbedded layers of medium -dense, gravelly slightly -silty sand, silty sand and fine sand. The residence site appears to be located in an old drainage swell and these interbedded sand layers underlying the site appear to be of alluvium deposits which were laid down by water flowing in the swale. The alluvium deposits are generally loose to medium -dense in their native, undisturbed state. The coarser deposits are of high permeability, while the fine-grained deposits are moderately permeable. GROUNDWATER CONDITION Minor specks of groundwater seepage was encountered in Test Pit 1 at about 3.0 feet deep and groundwater was not encountered in Test Pit 2. The encountered groundwater in Test Pit 1 appears to be stormwater infiltrating into the -ground and trapped over localized, less -permeable, silty fine sand pockets. The depth to pockets of perched groundwater may fluctuate seasonally, depending on precipitation, surface runoff, ground vegetation cover, site utilization, and other factors. The pockets of groundwater may completely dry up during the Summer and Fall seasons. The test pits were excavated in the middle of Winter season when groundwater would be at .its highest. Yet only a very minor speck of groundwater seepage were encountered by one of the two test pits. Therefore, it is our opinion that groundwater should have minimal impact on the construction of the proposed development for the site or the planned onsite stormwater disposal facility. LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 6 DISCUSSION AND RECOMMENDATIONS GENERAL Based on the soil conditions encountered in subsurface exploration, it is our opinion that the site is suitable for the proposed development from the geotechnical engineering viewpoint, provided that the recommendations in this report are fully implemented and observed during construction. The fill, topsoil and loose soil at shallow depth should be completely stripped within the driveway and the building pad of the new residence, and in areas where structural fill is to be placed. The underlying medium -dense sand, silty sand and gravelly sand soils should be able to provide adequate foundation support to the proposed new residence and driveway. GEOLOGIC HAZARDS The subject residence site is not mapped in geologic hazard areas. The site is very gently sloped and there is a lack of continuous, extensive groundwater table under the site at shallow depth. Therefore, it is our opinion that the potential for erosion, landslide and seismic hazards to occur on the site should be minimal. However, the Puget Sound region is in an active seismic zone and the new residence should be designed for seismic forces induced by strong earthquakes. Based on the soil conditions encountered by the test pits, it is our opinion that Seismic Use Group I and Site Class D should be used in the seismic design of the proposed residences in accordance with the 2006 International Building Code (IBC). TEMPORARY DRAINAGE AND EROSION CONTROL The onsite surficial soils contain a high percentage of fines which are sensitive to moisture and can be easily disturbed by construction traffic. A layer of clean, 2 -to -4 -inch quarry spalls should be placed over areas of frequent traffic, such as the entrance to the site and heavy equipment LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 7 operation areas, as required, to protect the subgrade ' soils from disturbance by construction traffic. A silt fence should be installed along the downhill boundaries of the site to minimize transport of sediment onto neighboring properties or the street during construction. The bottom of the filter cloth of the silt fences should be anchored in a trench filled with onsite soils. Ditches or interceptor trench drains should be installed on the uphill sides of construction areas, as required, to intercept and drain away storm runoff and near -surface groundwater seepage, if any, to facilitate construction work. Only clean and clear water captured by such ditches or interceptor trench drains may be discharged into a nearby storm inlet. The storm inlet should be covered with a filter sock to prevent sediment from entering the storm sewer system. The filter sock should be cleaned frequently during construction to prevent clogging, and should be removed after completion of construction. Spoil soils should be hauled off of the site as soon as possible. Spoil soils and imported structural fill material to be stored on site should be located in areas where the ground surface is no steeper than 15% grade, and should be covered with plastic tarps securely weighted down with sandbags. SITE PREPARATION AND GENERAL GRADING The vegetation within construction limits should be cleared and their roots thoroughly grubbed. Surficial loose fill, topsoil and loose surficial soils should be stripped within the driveway, building pad and in areas where structural fill is to be placed. The exposed soils after stripping should be compacted to a non -yielding state with a vibratory roller compactor and proof -rolled LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 8 with a fully loaded dump truck or water truck. Any areas with excessive flexing or pumping should have the weak soil over -excavated and backfilled with structural fill in accordance with recommendations in the STRUCTURAL FILL section of this report. EXCAVATION AND FILL SLOPES Under no circumstances should excavation slopes be greater than the limits specified by local, state and federal safety regulations if workers have to perform construction work in excavated areas. Unsupported temporary cuts greater than 4 feet in height should be no steeper than 1 H:1 V and unsupported permanent cut banks should be no steeper than 2-1/4H: IV. Permanent fill embankments required to support structural or traffic load should be constructed with compacted structural fill placed over undisturbed, proof -rolled, firm, native, advance outwash soils after the surficial unsuitable soils are completely stripped. The slope of permanent fill embankments should be no steeper than 2-1/4H: IV. Upon completion, the sloping face of permanent fill embankments should be thoroughly compacted to a non -yielding state with a hoe - pack. The soil units and stability of cut banks should be verified by a geotechnical engineer during excavation. The above recommended cut and fill slopes are under the assumption that groundwater seepage would not be encountered during construction. If groundwater seepage is encountered!*the,-construetibnrshoufdtbe�immediately- halted and the slope stability re-evaluated. The slopes may have to be flattened and other measures taken to .stabilize the slopes. Surface runoff should not be allowed to flow uncontrolled over the top of cut or fill slopes. Permanent cut slopes or fill embankments should be vegetated as soon as possible for long-term stability, LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 9 and should be covered with clear plastic sheets, as required, to protect them from stormwater until the vegetation is fully established. STRUCTURAL FILL Structural fill is the fill that support structural or traffic load. Structural fill should consist of clean granular soil with particles not larger than three inches and should be free of organic and other deleterious substances. Structural fill should have a moisture content within one percent of its optimum moisture content at the time of placement. The optimum moisture content is the water content in the soil that enable the soil to be compacted to the highest dry density for a given compaction effort. The onsite clean sandy soil meeting the above requirements may be used as structural fill. Imported material to be used as structural fill, if required, should be clean, free -draining, granular soils containing no more than 5 percent by weight finer than the No. 200 sieve based on the fraction of the material passing No. 4 sieve, and should have individual particles not larger than four inches. The ground over which structural fill is to be placed should be prepared in accordance with recommendations in the SITE PREPARATION AND GENERAL GRADING and EXCAVATION AND FILL SLOPES sections of this report. Structural fill should be placed in lifts no more than 10 inches thick in its loose state, with each lift compacted to a minimum percentage of the maximum dry density determined by ASTM 01557 (Modified Proctor Method) as follows: LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 10 Application Within building pads of the building lots Roadway/driveway subgrade Retaining wall backfill Utility trench backfill ONSITE STORMWATER DISPOSAL Feasibility % of Maximum Dry Density 95% 95% for top 3 feet and 90% below 90% 95% for top 4 feet and 90% below Two soil samples were selected for Particle Size Distribution tests in laboratory to determine feasibility of using infiltration trenches to dispose stormwater onsite for the new residence. The first soil sample was obtained from Test Pit 1 at 4.0 feet deep, the second from Test Pit 2 at 3.5 feet deep. The reports of these tests are presented in APPENDIX — Laboratory tests, attached hereto. As shown on the particle Size Distribution reports, Soil Sample 1 (Test Pit 1 at 4.0 feet deep) was composed of fine sand with a clay content of 6.3% and sand content of 75.6%; Soil Sample 2 (Test Pit 2 at 3.5 feet deep) was composed of gravelly fine to coarse sand with a clay content of 3.3% and sand content of 85.3%. According to the USDA Texture Triangle (from U.S. Department of Agriculture), shown under Appendix, Soil Samples 1 and 2 are classified as Loamy Sand and Sand, respectively. Both types of soils should be able to support infiltration trenches for onsite stormwater disposal. Design Infiltration Rate According to Table 3.7 of the Stormwater Management Manual for Western Washington, 2005 by Washington State Department of Ecology, the estimated long-term (design) infiltration rate is LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 11 0.5 iph (inch per hour) based on a correction factor of 4 on a short-term infiltration rate of 2 iph for loamy sand, and is 2.0 iph based on a correction factor of 4 on a short-term infiltration rate of 8 iph for sand. Due to the interbedded silty sand, sand and gravelly sand layers of the alluvium deposits underlying the residence site, we recommend a design infiltration rate of 0.75 iph be used for the design of infiltration trenches to be used for onsite dispose of stormwater for the new residence. Construction Recommendations We understand that infiltration trenches are to be located at the south and/or the north end of the site. The infiltration trenches should be set back at least 5 feet from property lines and at least 8 feet from nearby house foundations. The schematic presentation of an infiltration trench with a single dispersion pipe is shown on Plate 5. The infiltration trench should be at least 24 inches wide. The schematic presentation of an infiltration trench with multiple dispersion pipes, is shown on Plate 6. Multiple dispersion pipes, if used in an infiltration trench, should be placed at least 2 feet off the trench walls and spaced at no closer than 4 feet on centers. The bottom of infiltration trenches should be excavated at least 6 inches into a target loamy sand or sand layer into which stormwater is to be dispersed. To reach these soil layers, the infiltration trenches will have to be excavated to at about 3.0 feet at the south end and about 3.5 feet deep at the north end of the site. The soil unit at bottom of infiltration trenches should be verified by a geotechnical engineer. The side walls of the trenches should be lined with a layer of non -woven filter fabric. The trenches are then filled with clean washed 3/4 to 1-1/2 inch gravel or crushed rock to within about 8 inches of the finish grade. The dispersion pipes should be constructed of 4 -inch rigid LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 12 PVC pipes and laid level in the gravel or crushed rock filled trenches at about 12 inches below the top of trenches. The top of the gravel or crushed rock fill should also be covered with the filter fabric liner. The remaining trenches should then be backfilled with compacted onsite clean soils. Stormwater captured over paved driveway should be routed into a sediment control structure/oil-water separator catch basin before being released into the infiltration trenches. BUILDING FOUNDATIONS Conventional footing foundations may be used to support the new residence. Footing trenches should be excavated to at least 4 feet deep into native, undisturbed, medium -dense sand, silty sand or gravelly sand soil. -Soil exposed at the bottom of footing trenches should be compacted to a non -yield state with a vibratory mechanical.compactor, then covered with a minimum 8 -inch layer of 2 -inch crushed rock compacted to a non -yielding state: Footingfifounda0ons may then be poured on the crushed rock base. If the above recommendations are followed, our recommended design criteria for footing foundations are as follows: • Allowable soil bearing pressure, including dead and live loads, should be no greater than 2,000 psf for footings. The preparation of the subgrade soils and the placement of crushed rock base should be verified by a geotechnical engineer' before the footings are poured. • The minimum depth to bottom of perimeter footings below adjacent final exterior grade should be no less than 18 inches. The minimum depth to bottom of the interior footings below top of floor slab should be no less than 12 inches. • The minimum width should be no less than 16 inches for continuous footings, and no less than 24 inches for individual footings, except those footings supporting light -weight decks and porches. LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 13 A one-third increase in the above recommended allowable soil bearing pressure may be used when considering short-term, transitory, wind or seismic loads. For footing foundations designed and constructed per recommendations above, we estimate that the maximum total post - construction settlement of the buildings should be 3/4 inch or less and the differential settlement across building width should be 1/2 inch or less. Lateral loads on buildings can be resisted by the friction force between the foundations and the subgrade soils or the passive earth pressure acting on the below -grade portion of the foundations. For the latter, the foundations must be poured "neat" against undisturbed soils or backfilled with a clean, free -draining, compacted structural fill. We recommend that an equivalent fluid density (EFD) of 300 pcf (pounds per cubic foot) for the passive earth pressure be used for lateral resistance. The above passive pressure assumes that the backfill is level or inclines upward behind the foundations for a horizontal distance at least twice the depth of the foundations below final grade. A coefficient of friction of 0.55 between the foundations and the subgrade soils may be used. These are unfactored values, and a proper factor of safety should be used in calculating the resisting forces against lateral loads on the building. SLAB -ON -GRADE FLOORS Slab -on -grade floors, if used, should be placed on firm subgrade soils prepared as outlined in the SITE PREPARATION AND GENERAL EARTHWORK and the BUILDING FOUNDATIONS sections of this report. The slab -on -grade floors may be poured on the crushed rock base described in the BUILDING FOUNDATIONS section. The rock spall fill and the crushed rock can also serve as a capillary break to prevent moisture from migrating upward through the concrete floor slabs. LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 14 DRIVEWAY PAVEMENT Performance of driveway pavement is critically related to the conditions of the underlying subgrade soils. We recommend that the subgrade soils within the driveways be treated and prepared as described in the SITE PREPARATION AND GENERAL EARTHWORK and STRUCTURAL FILL sections of this report. Prior to placing base material, the subgrade soils should be compacted to a non -yielding state with a vibratory roller compactor and proof -rolled with a piece of heavy construction equipment, such as a fully -loaded dump truck. Any areas with excessive flexing or deflection should be over -excavated and re -compacted or replaced with a structural fill or crushed rock placed and compacted in accordance with the recommendations provided in the STRUCTURAL FILL section of this report. We recommend that a 4 -inch -thick minimum, compacted, crushed rock base (CRB), consisting of 7/8 -inch -minus crushed rock, be used for the driveway. The crushed rock base should be topped by 3 -inch -thick Class B asphalt concrete (AC). DRAINAGE CONTROL Site and Driveway Grading The onsite surficial soils can be saturated quickly and heavy runoff and near -surface groundwater may be encountered during periods of heavy rain. To minimize potential difficulties for site grading work due to storm runoff and groundwater seepage during construction, one or more lines of ditches or interceptor trench drains should be installed, as required, along the uphill side of the site to intercept storm runoff and near -surface groundwater flow. Water thus collected should be direct into a nearby storm inlet covered with a filter sack. LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 15 Excavation of Building Footprint Excavation of building footprints, if encountering groundwater, should have the bottom of excavation sloped and ditches excavated along the bases of cut banks to direct groundwater seepage to flow into a sump pit from which water can be pumped out of the pit into a storage/settling pond onsite. The over -excavation of the building footing should be backfilled per recommendations under the BUILDING FOUNDATIONS section of this report. Runoff over Impervious Surfaces Storm runoff over impervious surfaces, such as roofs and paved driveway, should be collected by underground drain line systems connected to downspouts and by catch basins installed in the driveway. Stormwater thus collected should be tightlined to discharge into a storm sewer or a suitable onsite stormwater disposal facility such as infiltration trenches. Building Footing Drain A subdrain� should`be� installed around the, perimeter -footing& of the, new residence. The subdrain should consist of a 4 -inch -minimum -diameter, perforated, rigid, drain pipe, laid a few inches below bottom of the perimeter footings of the new garage. The trench and the drain line should have a sufficient gradient (0.5% minimum) to generate flow by gravity. The drain line should be wrapped with a filter fabric sock and completely enclosed in clean washed =gravel:' The remaining trench may be backfilled with clean onsite soils. Water collected by the perimeter footing subdrain systems should be tightlined, separately from the roof and surface stormwater drain lines, to discharge into a storm sewer or a suitable stormwater disposal facility such as infiltration trenches. LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 16 Surface Drainage Water should not be allowed to stand in any areas where footings, slabs, or pavement is to be constructed. Finish ground surface should be graded to flow away from the proposed residential building. We recornmendikeffifinishogrIoundibevsloped-4at raig.radient-6f*.3tpercentmihimum�f6r a distance of at least 10 feet away from the buildings, except in the areas to be paved" Cleanouts Sufficient number of cleanouts at strategic locations should be provided for the underground drain line systems. The underground drain line systems should be maintained periodically to prevent clogging. LIMITATIONS This report has been prepared for the specific application to the subject project for the exclusive use by Mrs. Wendy Priest and her associates, consultants and contractors. We recommend that this report, in its entirety, be included in the project contract documents for information of and estimating and bidding purposes by prospective' contractors and for compliance to the recommendations in this report during construction. The conclusions and interpretations in this report, however, should not be construed as a warranty of the subsurface conditions. The scope of this study does not include services related to construction safety precautions and our recommendations are not intended to direct the contractor's methods, techniques, sequences or procedures, except as specifically described in this report for design considerations. Our recommendations and conclusions are based on soil conditions encountered in the test pits, our engineering analyses, and our experience and engineering judgment. The conclusions and recommendations are professional opinions derived in a manner consistent with the level of care LIU & ASSOCIATES, INC. March 15, 2011 Wendy Priest Residence L&A Job No. 11-004 Page 17 and skill ordinarily exercised by other members of the profession currently practicing under similar conditions in this area. No warranty, expressed or implied, is made. The actual subsurface conditions encountered during construction may vary from those encountered in the test pits. The nature and extent of such variations may not become evident until construction starts. If variations occur then, Liu & Associates, Inc., should be retained to re-evaluate the recommendations of this report, and to verify or modify them in writing prior to further construction. CLOSURE We are pleased to be of service to you on this project. Please feel free to call us if you have any questions regarding this report or need further consultation. Six plates attached Yours very truly, LIU & ASSOCIATES, INC. J. S. (Julian) Liu, Ph.D., P.E. Consulting Geotechnical Engineer LIU & ASSOCIATES, INC. IaI 890 ST OVERLOOK PKC > PL sw _ 7c Ovw M s, I 182ND PL Sw at �a3�c ti e► l a IIZT ; szoo t ' = 8508 IBM rn a' 185TH .: 185TH HUTT:PL sl PL SW _ < . _ 1 f�JtiPK. 1861M PL18TIH.: 186TH ST - sw. 287T ST . SW ST Sw 3 ( I PL SW ,. ty 08 8: 188TH" � 018 ST SWeloo-' 189TH ST SN .. 3 m.. < _ , 9410 3 8 3 f 184TH PL SII m aJ. p W ER T y ' e KE PL 19 ST SW (] ¢ 190TH ST SW CHERR ST �q� S`1 t ' cz" '191sT ' ttR¢r' 9 PL s ...191ST ST �$ z 9600 o Q� .< 2yo rn --,13 92110 sPC I < ' 192ND. S7 sW SW m "�Trn �F2S a _Sw 1 . _ s� 8M n 5.,. sraEAy fi �� FOREST r o ., o Q a ^q� �Afei�rn <h �Cp ti0 G�(t0 utL DR lvL ST21- S 194TH x .. �j`Tt '1P E%ELSIOR-�-. SPL M PL sw. : 194TH 3 a O00 Hi " r1 196TH 196T ST MELODY LN 19rTx PUGET PU J ` .:: UR . ST SW" 8600 &� I �� WY a x /- o ST SW2 C a 3 BROOKMERE HINDLEY LN V EWLAND = WY„ 00 " OR 1000 - 00 z z 700 BRWKMERE ST > z .. 3 c PL SW EDMOND'S z z z ¢ :: r o IGpP� I '. 1 - UNDERWATER SPE S ST Z VIEwN00R -- ST SW ." �° > 3 :. m mo PARK: GILTNER L VISTA ' 800. 1Wnr�tn VISTA & WY JTER LN PL o LH E LM M1 .1 200TH o $T $W 8300 BRACKETTS. J At 'O $ > ¢ CASEJDE 201ST_ L a LANDING % Q Law ur ST AL 0 A°aCHARD CAROL Q SIERRA : la Q z ROL < BEACH, op GL N ST T Q GLEN ST IP RRA PROJECT zD �2`3RD S > < p . 203RD L SW `• �` Q ^U ¢ 0 24 ;q .d ° ' 4z.' SITE pL�W� 203RD PL SW E p F y DALEY < ST 1. 2NTMH n sw fERRY IERYIKIL [VI 700 ACO 0 ti - 1. lOC I�WWDi - ZOIT e dF' Sr `fiTR` �IAIIE. 8-- 1„•4 . PL W 'UhDT �0' _ HUMMIN 2 1 3 'FPINE 205TH3IaPARK ,8 pp Sl 2 EDS =HILL PKC ST = I( sTsw a 0 Pwc O Q m ^ 7co _ rn I r mt P< 206TH ELL. ST �---- ELL HI 207i1I I, i'r y, ST SW' O• h 800 ap 207TH x " o o > Dlr7vlE 9* 0xtsr ST OR xIp sr 9E CI 4' m F s m IN g 2 ST PL SW aI_ -- IPL Sw co TION N8 112' c fRSCO rt . y o 208 ST ti)' DAYTON L ST Lfi f a c6 w A su . . 400 CO'M L7R i• Z'L E i a ,�„ -+ �j - x�' s 208TH PI �. luPLE r w a )Q� MAPLE `n v `' ST :. •t -C. i. J = 209TH PL "�� ,o a SW=�'. �`L 3 3 ER �n soo a N N g g 3'xi... 1�}+c r- SW 2 o P o O 2LDTW x sr a ALDE _ T �: ' _ a PL5y o I. UNION Lz N m 600 g 800 901 0 [1 apt «� <�` e W LNUT ` 1 1000 9 F(( oma' 9, OIL HOUY oR � CEDAR ST O �Fp FS o0 212TH i CE AR O HOWELL WY rn N u > s svaIX _DEE PARK RD . �? _.i 6 0o ST d SW MARSH p 900 D D Pwa, Sva CE > SPRUCE o ST w IN a 1 UNEER �;= 3 N Z . � DR > RL Q � L s � � . z Pl 'YELL LL I 213TH ST R� Q .. HEMLOCK ¢ Q HEHLOCK W+_ 8 o URE _ a < a a _ �.,. ; 214TH PL SW 5w E EBBE ¢ 500 - '� ST IAUREL wr 214 H LN 2 ::;SW'-_'< r ..� 215TH ST 21 TH °.PL Slf �� _ SEAMDNr = LAUREL 215TH ST PL SW > d 215TH < 8 . SW 21ST 5T SW ST SN3 215TH .,_3 z _ e s - 215TH PL in PTPI T— 216TH ST SW } ti h 200 PINES rot 9uo 216 PL 9200 > — r O f' 2 voi FORSYTH J x > 2 > 3 SW 880 MAKAH a.> 217TH ST. SW . 217TH sr w > M FIR FrT Z N N > a s 217TH PL SW ? N a .a PL ' z F R ST a L > 218TH .:. FIR PL - 218TH P ¢ $T $W 00 26.... ¢ 60o g . 700 j 8 > SW BBD a 8400 z y coot% I N S ELM¢ Q m �5 T9SNs'�O 219TH ST lD .:: ; ' . E -ST.. _ 22 TH o a QST . oo '< 1'sw .' .. S7fnMR.`-� ... ' -� ,,< Tao 4 ELM Wr a o n 600 3 =9301 $ 0 9001 N 220TH.PL 9a 82uu VICINITY MAP LIU & ASSOCIATES, INC. WENDY PRIEST RESIDENCE 1056 DALEY STREET Geotechnical Engineering • Engineering Geology Earth Science EDMONDS, WASHINGTON JOB NO. 11-004 I DATE 3/7/2011 1 PLATE 1 of 31 DALEY ST 198. CHISLED SO. TOP CURB I v ® 70.00' S 88'38'56" E IELD o Tp -?-A- 00 I �I I �I w N 0 0 o z I _ 201.9 I 0 AGE M ;20 C. o 4 N EXIST. HOUSE .61 I ##1056 36. �' —1 0 -�- 6 N 78 I d 0 0 CON C. 1 201.5 1 I 0 I 1 I cn 58.1' 2011 5.93' 2014- g, PROPOSED 1 HOUSE r� i iri in . �• 2027 ' •• GE Tp 1 •5 f 203.44 204.0 k_ ��0- 3_4 \ 70.00' ALLEY WAY (V. — 1.0' N 88'38'25" W 1.0 VOL 2 PG 39 SITE AND EXPLORATION LOCATION' PLAN Uu & ASSOCIATES, INC. WENDY PRIEST RESIDENCE 1056 DALEY STREET Geotechnical Engineering • Engineering Geology • Earth Science EDMONDS, WASHINGTON JOB NO. 11-004 DATE 3/7/2011 1 PLATE 2 UNIFIED SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP SYMBOL GROUP NAME COARSE- GRAINED SOILS MORE THAN 50% RETAINED ON THE NO. 200 SIEVE GRAVEL MORE THAN 50% OF COARSE FRACTION RETAINED ON NO. 4 SIEVE CLEAN GRAVEL GW WELL -GRADED GRAVEL, FINE TO COARSE GRAVEL GP POORLY -GRADED GRAVEL GRAVEL WITH FINES GM SILTY GRAVEL GC CLAYEY GRAVEL SAND MORE THAN 50% OF COARSE FRACTION PASSING NO. 4 SIEVE CLEAN SAND SW WELL -GRADED SAND, FINE TO COARSE SAND SP POORLY -GRADED SAND SAND WITH FINES SM SILTY SAND SC CLAYEY SAND FINE- GRAINED SOILS MORE THAN 50% PASSING ON THE NO. 200 SIEVE SILT AND CLAY LIQUID LIMIT LESS THAN 50% INORGANIC ML SILT CL CLAY ORGANIC OL ORGANIC SILT, ORGANIC CLAY SILTY AND CLAY LIQUID LIMIT 50% OR MORE INORGANIC MH SILT OF HIGH PLASTICITY, ELASTIC SILT CH CLAY OF HIGH PLASTICITY, FAT CLAY ORGANIC OH ORGANIC SILT, ORGANIC SILT HIGHLY ORGANIC SOILS PT PEAT AND OTHER HIGHLY ORGANIC SOILS NOTES: 1. FIELD CLASSIFICATION IS BASED ON VISUAL EXAMINATION OF SOIL IN GENERAL ACCORDANCE WITH ASTM D2488-83. 2. SOIL CLASSIFICATION USING LABORATORY TESTS IS BASED ON ASTM D2487-83. 3. DESCRIPTIONS OF SOIL DENSITY OR CONSISTENCY ARE BASED ON INTERPRETATION OF BLOW -COUNT DATA, VISUAL APPEARANCE OF SOILS, AND/OR TEST DATA. LIU & ASSOCIA'T'ES, INC. Geotechnical Engineering • Engineering Geology • Earth Science SOIL MOISTURE MODIFIERS: DRY - ABSENCE OF MOISTURE, DUSTY, DRY TO THE TOUCH SLIGHTLY MOIST - TRACE MOISTURE, NOT DUSTY MOIST - DAMP, BUT NO VISIBLE WATER VERY MOIST - VERY DAMP, MOISTURE FELT TO THE TOUCH WET - VISIBLE FREE WATER OR SATURATED, USUALLY SOIL IS OBTAINED FROM BELOW WATER TABLE UNIFIED SOIL CLASSIFICATION SYSTEM PLATE 3 TEST PIT NO. 1 Logged By: JSL Date: 2/17/2011 Ground EI. ± Depth ft. USCS CLASS. Soil. Description Sample No. W % Other Test OL Dark -brown, slightly silty, fine SAND, loose, organic, with fine 1 — — — — roots, m_oist(TOPSOIL)---- SM Rusty -brown medium -dense, silty fine SAND, trace gravel, 2 ---- ---------------------------------- ------------------------------------------- 3 SW Gray, medium -dense, gravelly, medium to coarse SAND, moist 3 ____ _ (RelicTOPS01�—_____ ' 4 ---- SP ---------------------------------- Gray, medium -dense, fine SAND, moist 4 medium SAND, moist 5 6 --- _ SM ---------------------------------- Gray, medium -dense, silty fine SAND, moist 7 SW Gray with yellowish stains, medium -dense, medium to coarse 7 SAND, trace to some gravel, moist 8 SID Gray, medium -dense, fine SAND, moist 8 9 9 Test pit terminated at 8.0 ft; minor speck of groundwater @ 3.0 ft. 10 11 Test pit terminated at 9.5 ft; groundwater not encountered. TEST PIT, NO. 2 Logged By: JSL Date: 2/17/2011 Ground EI. ± Depth ft. USCS CLASS. Soil Description Sample No. W % Other Test OL Dark -brown, loose, silty fine SAND, with fine roots, organic, moist 1 — — —,TOPS(iL/FILL)------------------�--- SM Light -brown to light -gray, loose, gravelly, silty fine SAND, trace 2 of gravel, moist (FILL) ------------------------------------------- 3 OL Dark -brown, loose, silty fine SAND, with fine roots, organic, moist ____ _ (RelicTOPS01�—_____ ' 4 SM/SP __________ Light -brown to light -gray, medium -dense, gravelly, slightly silty medium SAND, moist 5 --- _ SM ---------------------------------- Gray, medium -dense, silty fine SAND, moist 6 7 ------------------------------------------- SID Gray, medium -dense, fine SAND, moist 8 9 10 Test pit terminated at 9.5 ft; groundwater not encountered. LIU & ASSOCIATES, INC. Geotechnical Engineering• Engineering Geology • Earth Science TEST PIT LOGS WENDY PRIEST RESIDENCE 1056 DALEY STREET EDMONDS, WASHINGTON JOB NO. 11-004 1 DATE 2/21/20111 PLATE 4 � O ► 7z 1n � 7 � � a 0�1 •: 0 t O C cul �w 7Z M 77- '-' O 77 n 7 �� v3 � I l i « iI Z J Al t o u-� o[ z 3� - Z LIU & ASSOCIATES, INC. Geotechnical Engineering • Engineering Geology • Earth Science INFILTRATION TRENCH - SINGLE DISPERSION PIPE WENDY PRIEST RESIDENCE 1056 DALEY STREET EDMONDS, WASHINGTON JOB NO. 11-004 1 DATE 3/14/2011 1 PLATE 5 :- ► 7z 1n � 7 � � a 0�1 •: 0 t O C 77- '-' O •� n 7 �� O :�O O 0 0 O O e 9 9 0 O I l i « iI Z J Al t o u-� o[ z 3� - Z LIU & ASSOCIATES, INC. Geotechnical Engineering • Engineering Geology • Earth Science INFILTRATION TRENCH - SINGLE DISPERSION PIPE WENDY PRIEST RESIDENCE 1056 DALEY STREET EDMONDS, WASHINGTON JOB NO. 11-004 1 DATE 3/14/2011 1 PLATE 5 0o�0 9 o0 a!3 0Z 000 3 n — •ooh � 01— 'L 4-1 ' 010 k1- i O ` 1 10 5� htdJ1 INFILTRATION TRENCH - MULTI DISPERSION PIPES LIU & ASSOCIATES, INC. WENDY PRIEST RESIDENCE 1056. DALEY STREET Geotechnical Engineering Engineering Geology •EarihScience EDMONDS, WASHINGTON JOB NO. 11-004 DATE 3/14/2011 PLATE 6 w72N `o LL Z z Z vi _-g- j p . % 0o�0 9 o0 a!3 0Z 000 3 n — •ooh � 01— 'L 4-1 ' 010 k1- i O ` 1 10 5� htdJ1 INFILTRATION TRENCH - MULTI DISPERSION PIPES LIU & ASSOCIATES, INC. WENDY PRIEST RESIDENCE 1056. DALEY STREET Geotechnical Engineering Engineering Geology •EarihScience EDMONDS, WASHINGTON JOB NO. 11-004 DATE 3/14/2011 PLATE 6 APPENDIX Laboratory Test Results Wendy Priest Residence LIU & ASSOCIATES, INC. Z Z w Q w a 1�101 t- SAM PFS l ASTM C1171136 Particle Size Distribution Report MINE llilillimililillimill 11111111111111 r pillillslill 1 111111111 0111111111111111111111 1111111 011ll1I11 I ILI 111111111111 11 milli 11111111111111111111 HIM GRAIN SIZE - mm % COBBLES % GRAVEL % SAND % FINES SPEC` PERCENT CRS. FINE J CRS. MEDIUMFINE SILT CLAY 0.0 0.0 0.0 0.0 0.6 69.6 -23.5 6.3 SIEVE SIZE PERCENT FINER SPEC` PERCENT PASS? (X=NO) #10 100.0 Atterberg Limits #40 99.4 Coefficients #200 29.8 DSO= 0.0757 D1 5= 0.0221 D10= 0.0115 0.0332 mm. 18.7 Classification 0.0213 mm. 14.7 Remarks 0.0125 mm. 10.7 0.0089 mm. 8.1 0.0063 mm. 6.8 0.0031 mm. 5.7 0.0013 mm. 4.3 (no specification provided) Sample No.: 9728 Source of Sample: Priest Residence - 11-004 Date: 3-14-2011 Location: -TP- ElevJDepth: 4.01 Client: Lui &Associates Project: 2011 Laboratory Testing CASCADE TESTING LABORATORY. INC. TFrSM C3 6 NBPECTIC M / EMMs reFES 'le9Mq Ka 129TH P . C e 9eo� 1aC91 o Project No: 0911-28 Nick Averill Soil Description Loamy sand TP -2 Atterberg Limits PL= LL= PI= Coefficients D85= 0.317 D60= 0.184 D50= 0.144 DSO= 0.0757 D1 5= 0.0221 D10= 0.0115 Cu= 16.00 Cc= 2.71 Classification USCS= AASHTO= Remarks (no specification provided) Sample No.: 9728 Source of Sample: Priest Residence - 11-004 Date: 3-14-2011 Location: -TP- ElevJDepth: 4.01 Client: Lui &Associates Project: 2011 Laboratory Testing CASCADE TESTING LABORATORY. INC. TFrSM C3 6 NBPECTIC M / EMMs reFES 'le9Mq Ka 129TH P . C e 9eo� 1aC91 o Project No: 0911-28 Nick Averill BioLsAmme2 a Textural Triangle D IOOX clay. MN • v vv av sv �0 20 10 100X tl� M*—PNteM mod Shaded area is applicable for design of infiltration BMPs Figure 3.27 USDA Textural Triangle Source: U.S. Department of Agriculture 3-74 Volume 111– Hydrologic Analysis and Flow Control BMPs February 2005 I Textural Triangle D IOOX clay. •1 ® 1 -® / 1 1 .s ® 1 to601 ,�. . �® ♦► 20, .< .-�.�.�.. B 1 �'nc� 'alp$ A0, . lQ3N:mCa7tia'.k i�i,G. 1..�Y�"l�P>• � MN • v vv av sv �0 20 10 100X tl� M*—PNteM mod Shaded area is applicable for design of infiltration BMPs Figure 3.27 USDA Textural Triangle Source: U.S. Department of Agriculture 3-74 Volume 111– Hydrologic Analysis and Flow Control BMPs February 2005 I