° CITY OF EDMONDS
+. 121 5TH AVENUE NORTH - EDMONDS, WA 98020
o PHONE: (425) 771-0220 - FAX: (425) 771-0221
°c. 189
Expiration Date: 8/22/2012
Parcel No: 2703 3 600106 100
GRE EDMONDS WAY LLC STUDIO MENG STRAZZARA VENTURE GENERAL CONTRACTING INC
2801 ALASKAN WAY SUITE 310 CHRIS DAVIDSON 2801 ALASKAN WAY SUITE 310
SEATTLE, WA 98121 2001 WESTERN AVE SUITE 200 SEATTLE, WA 98121
SEATTLE, WA 998121
(206) 215-9734 EXT: (206) 587-3797 EXT: (206) 834-6402 EXT:
LICENSE t{: VENTUGC899LZ EXP:6/9/2013
INSTALLATION OF SPREAD FOOTINGS, WALL FOUNDATIONS, CONCRETE SHEAR WALLS, CONCRETE COLUMNS,
SLAB -ON -GRADE, CONCRETE RETAINING WALLS, AND ELEVATED PT SLABS. INSTALLATION OF SITE PAVING
AND ROW WORK.
VALUATION: $566,361.00
PERMIT TYPE: Commercial
PERMIT GROUP: 32 - Foundation
GRADING: N CYDS: 0
TYPE OF CONSTRUCTION:
RETAINING WALL ROCKERY: N
OCCUPANT GROUP:
OCCUPANT LOAD:
FENCE: N ( 0 X 0 FT.)
CODE: 09
OTHER: N ---- OTHER DESC:
ZONE:
NUMBER OF STORIES: 0
VESTED DATE:
NUMBER OF DWELLING UNITS: 0
LOT #:
BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0
BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0
3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
FRONTSETBACK SIDE SETBACK REAR SETBACK
REQUIRED: PROPOSED: RE UIRED: PROPOSED: RE TIRED: PROPOSED:
HEIGHT ALLOWED:O PROPOSED:O REQUIRED: PROPOSED:
SETBACK NOTES:
1 AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO
PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S
COMPENSATION INSURANCE AND RCW 18:27.
THIS AUt7feA'r NPERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND -ALL FEES ARE PAID.
—22
ATTENTION
IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF
OCCUPANCY HAS BEEN GRANTED. UBC109/ IBCI 10/ IRCI 10.
= ONLINE = APPLICANT = ASSESSOR ® OTHER
STATUS: ISSUED
BLD20110469
• Special inspections have been called for on this project and are noted on the approved construction plans and building permit.
It is the owner and/or contractors responsibility to assure that reports are provided to the City on a weekly basis. Be advised --
if special inspection reports are not forthcoming, the Building Official may issue a "Stop Work" and no City inspections will
be provided until such time as the reporting agency has complied and reports are reviewed and approved by the City.
• Submit all special inspection reports to the City Building Inspector on a weekly basis.
• Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of
the building or structure. Check the job card for all required City inspections including final project approval and final
occupancy inspections.
• Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from
adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing
fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable.
• Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been
specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision
of city code or state law does not approve any items not to code specification.
• Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits
of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and I0:00am and 6:00pm on Saturdays,
excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must
comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
• SPECIAL INSPECTIONS ARE REQUIRED FOR THE FOLLOWING:
• Excavation, Grading, and Site Preparation
• Placement of Structural Fill and Compaction
• Soil Bearing Verification
• Foundation Drainage Installation
• Retaining Wall Construction and Drainage Installation
• General Site Monitoring during wet Weather Construction
• Concrete Construction, Including Reinforcement
• Concrete Anchor Installation
• Shearwall Nailing, Floor and Roof diaphragm Nailing
• Structural Masonry
• Structural Steel Fabrication and Erection, Including High -Strength Bolting and Welding (Welders Must Be WABO
Certified)
• Suspended Ceiling System Installation
• Seismic Anchoring of Mechanical/Electrical Equipment
• Structural Observation by Structural Engineer of Record
• Prior to Final Inspection by the Building Division, Final Special Inspection Reports are Required From All Special
Inspectors.
• Submit Special Inspection Field reports on a weekly basis to the City Building Department.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE
PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION.
PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6)
CALL FOR INSPECTIONS
BUILDING 425) 771-0220 EXT. 1333 ENGINEERING 425) 771-0220 EXT. 1326 FIRE (425) 775-7720
PUBLIC WORKS 425 771-0235 1 PRE-TREATMENT 425) 672-5755 1 RECYCLING 425) 275-4801
When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection
being requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon.
9 •
• E -Erosion Control/Mobilization
• E -Pavement Striping
• E -Trash Enclosure
• E -Engineering Final
• B-Preconstruction meeting
B -Footings
• B -Foundation Wall
• B -Foundation Drainage
• B -Isolated Footings/Piers
• B -Slab Insulation
• B -Building Final
��OV E°"'�ti Inspection Comments
v"� 6
@4bjJ' BLD20110469 32 - Foundation
Applied: 06/20/2011 Issued: 08/22/2011 Expires: 08/22/2012
enc. 1890
Address: 23020 EDMONDS WAY, EDMONDS
_
;INSPECTION
DATE
INSPECTOR
ACTION-
^_
1001 - E -Erosion Control/Mobilization
07/13/2012
MCCONNELL
CMP
Comment: Project finaled
1051 - E -Pavement Striping
07/13/2012
MCCONNELL
CMP
Comment: Approved
1075 - E -Trash Enclosure
07/13/2012
MCCONNELL
CMP
Comment: Approved
1077 - E -Engineering Final
07/13/2012
MCCONNELL
CMP
Comment: Project finaled.
1101 - B-Preconstruction meeting
08/09/2012
MCCONNELL
CMP
Comment:
1108 - B -Footings
09/15/2011
STEINIKE
PAR
Comment: See job site inspection card.
1108 - B -Footings
09/27/2011
STEINIKE
PAR
Comment: See job site card for specific location, for forms and steel on retaining wall.
1108 - B -Footings
09/29/2011
LAWLER
PAR
Comment: Grid lines 1 and 5, see job site card
1108 - B -Footings
10/03/2011
STEINIKE
COM
Comment: Not ready.
1108 - B -Footings
10/04/2011
STEINIKE
PAR
Comment: See job site card for locations.
1108 - B -Footings
10/10/2011
LAWLER
PAR
Comment: see job card for locations
1108 - B -Footings
11/03/2011
LAWLER
COM
Comment: all now approved except one pier footing
1108 - B -Footings
07/13/2012
LAWLER
CMP
Comment:
1110 - B -Foundation Wall
10/24/2011
LAWLER
COR
Comment: not ready
1110 - B -Foundation Wall
10/25/2011
STEINIKE
PAR
Comment: See job site card for locations.
1110 - B -Foundation Wall
07/13/2012
LAWLER
CMP
Comment:
1112 - B -Foundation Drainage
07/13/2012
LAWLER
CMP
Comment:
9/7/2012 11:22:30 AM 121 5th Ave, Edmonds
Washington -Phone: (425) 771-0220
Page 1 of 2
!INSPECTION
DATE
INSPECTOR
ACTION
1114 - B -Isolated Footings/Piers
07/13/2012
LAWLER
CMP
Comment:
1118 - B -Slab Insulation
07/13/2012
LAWLER
CMP
Comment:
1158 - B -Building Final
07/13/2012
LAWLER
CMP
Comment:
3000 - PT -Slab
10/19/2011
LAWLER
PAR
Comment: PT slab -reinforcing for parking structure pending RFI for 18 tendon
VS 23 tendons at north longitudinal
run.
3000 - PT -Slab
11/14/2011
LAWLER
COM
Comment: see correction notice. min lap splices
3000 - PT -Slab
12/14/2011
LAWLER
CMP
Comment:
J