Loading...
BLD20110469.pdfVyoF EyO�� ° CITY OF EDMONDS +. 121 5TH AVENUE NORTH - EDMONDS, WA 98020 o PHONE: (425) 771-0220 - FAX: (425) 771-0221 °c. 189 Expiration Date: 8/22/2012 Parcel No: 2703 3 600106 100 GRE EDMONDS WAY LLC STUDIO MENG STRAZZARA VENTURE GENERAL CONTRACTING INC 2801 ALASKAN WAY SUITE 310 CHRIS DAVIDSON 2801 ALASKAN WAY SUITE 310 SEATTLE, WA 98121 2001 WESTERN AVE SUITE 200 SEATTLE, WA 98121 SEATTLE, WA 998121 (206) 215-9734 EXT: (206) 587-3797 EXT: (206) 834-6402 EXT: LICENSE t{: VENTUGC899LZ EXP:6/9/2013 INSTALLATION OF SPREAD FOOTINGS, WALL FOUNDATIONS, CONCRETE SHEAR WALLS, CONCRETE COLUMNS, SLAB -ON -GRADE, CONCRETE RETAINING WALLS, AND ELEVATED PT SLABS. INSTALLATION OF SITE PAVING AND ROW WORK. VALUATION: $566,361.00 PERMIT TYPE: Commercial PERMIT GROUP: 32 - Foundation GRADING: N CYDS: 0 TYPE OF CONSTRUCTION: RETAINING WALL ROCKERY: N OCCUPANT GROUP: OCCUPANT LOAD: FENCE: N ( 0 X 0 FT.) CODE: 09 OTHER: N ---- OTHER DESC: ZONE: NUMBER OF STORIES: 0 VESTED DATE: NUMBER OF DWELLING UNITS: 0 LOT #: BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 FRONTSETBACK SIDE SETBACK REAR SETBACK REQUIRED: PROPOSED: RE UIRED: PROPOSED: RE TIRED: PROPOSED: HEIGHT ALLOWED:O PROPOSED:O REQUIRED: PROPOSED: SETBACK NOTES: 1 AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. THIS AUt7feA'r NPERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND -ALL FEES ARE PAID. —22 ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109/ IBCI 10/ IRCI 10. = ONLINE = APPLICANT = ASSESSOR ® OTHER STATUS: ISSUED BLD20110469 • Special inspections have been called for on this project and are noted on the approved construction plans and building permit. It is the owner and/or contractors responsibility to assure that reports are provided to the City on a weekly basis. Be advised -- if special inspection reports are not forthcoming, the Building Official may issue a "Stop Work" and no City inspections will be provided until such time as the reporting agency has complied and reports are reviewed and approved by the City. • Submit all special inspection reports to the City Building Inspector on a weekly basis. • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and I0:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • SPECIAL INSPECTIONS ARE REQUIRED FOR THE FOLLOWING: • Excavation, Grading, and Site Preparation • Placement of Structural Fill and Compaction • Soil Bearing Verification • Foundation Drainage Installation • Retaining Wall Construction and Drainage Installation • General Site Monitoring during wet Weather Construction • Concrete Construction, Including Reinforcement • Concrete Anchor Installation • Shearwall Nailing, Floor and Roof diaphragm Nailing • Structural Masonry • Structural Steel Fabrication and Erection, Including High -Strength Bolting and Welding (Welders Must Be WABO Certified) • Suspended Ceiling System Installation • Seismic Anchoring of Mechanical/Electrical Equipment • Structural Observation by Structural Engineer of Record • Prior to Final Inspection by the Building Division, Final Special Inspection Reports are Required From All Special Inspectors. • Submit Special Inspection Field reports on a weekly basis to the City Building Department. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) CALL FOR INSPECTIONS BUILDING 425) 771-0220 EXT. 1333 ENGINEERING 425) 771-0220 EXT. 1326 FIRE (425) 775-7720 PUBLIC WORKS 425 771-0235 1 PRE-TREATMENT 425) 672-5755 1 RECYCLING 425) 275-4801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon. 9 • • E -Erosion Control/Mobilization • E -Pavement Striping • E -Trash Enclosure • E -Engineering Final • B-Preconstruction meeting B -Footings • B -Foundation Wall • B -Foundation Drainage • B -Isolated Footings/Piers • B -Slab Insulation • B -Building Final ��OV E°"'�ti Inspection Comments v"� 6 @4bjJ' BLD20110469 32 - Foundation Applied: 06/20/2011 Issued: 08/22/2011 Expires: 08/22/2012 enc. 1890 Address: 23020 EDMONDS WAY, EDMONDS _ ;INSPECTION DATE INSPECTOR ACTION- ^_ 1001 - E -Erosion Control/Mobilization 07/13/2012 MCCONNELL CMP Comment: Project finaled 1051 - E -Pavement Striping 07/13/2012 MCCONNELL CMP Comment: Approved 1075 - E -Trash Enclosure 07/13/2012 MCCONNELL CMP Comment: Approved 1077 - E -Engineering Final 07/13/2012 MCCONNELL CMP Comment: Project finaled. 1101 - B-Preconstruction meeting 08/09/2012 MCCONNELL CMP Comment: 1108 - B -Footings 09/15/2011 STEINIKE PAR Comment: See job site inspection card. 1108 - B -Footings 09/27/2011 STEINIKE PAR Comment: See job site card for specific location, for forms and steel on retaining wall. 1108 - B -Footings 09/29/2011 LAWLER PAR Comment: Grid lines 1 and 5, see job site card 1108 - B -Footings 10/03/2011 STEINIKE COM Comment: Not ready. 1108 - B -Footings 10/04/2011 STEINIKE PAR Comment: See job site card for locations. 1108 - B -Footings 10/10/2011 LAWLER PAR Comment: see job card for locations 1108 - B -Footings 11/03/2011 LAWLER COM Comment: all now approved except one pier footing 1108 - B -Footings 07/13/2012 LAWLER CMP Comment: 1110 - B -Foundation Wall 10/24/2011 LAWLER COR Comment: not ready 1110 - B -Foundation Wall 10/25/2011 STEINIKE PAR Comment: See job site card for locations. 1110 - B -Foundation Wall 07/13/2012 LAWLER CMP Comment: 1112 - B -Foundation Drainage 07/13/2012 LAWLER CMP Comment: 9/7/2012 11:22:30 AM 121 5th Ave, Edmonds Washington -Phone: (425) 771-0220 Page 1 of 2 !INSPECTION DATE INSPECTOR ACTION 1114 - B -Isolated Footings/Piers 07/13/2012 LAWLER CMP Comment: 1118 - B -Slab Insulation 07/13/2012 LAWLER CMP Comment: 1158 - B -Building Final 07/13/2012 LAWLER CMP Comment: 3000 - PT -Slab 10/19/2011 LAWLER PAR Comment: PT slab -reinforcing for parking structure pending RFI for 18 tendon VS 23 tendons at north longitudinal run. 3000 - PT -Slab 11/14/2011 LAWLER COM Comment: see correction notice. min lap splices 3000 - PT -Slab 12/14/2011 LAWLER CMP Comment: J 9/7/2012 11:22:30 AM 121 5th Ave, Edmonds Washington - Phone:,(425) 771-0220 Page2 of 2