bld20110474_ENG1-Acess_Struct.pdf
City of EdmondsBLD20110474
TH
121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORK DEPARTMENT
Planning • Building • Engineering
Engineering Plan Review Comments
PermitApplication:Date:
#BLD20110474July 12, 2011
Project Name/Address:
Aldercrest Health & Rehab
Contact Person/Address, Fax or E-mail:
John Hunt –johnhunt@hunteng.com
Reviewer: JENNIFERLAMBERTDivision:
ENGINEERING
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at
our website: www.ci.edmonds.wa.usunder City Government / Development Services Department /
Engineering Division then scroll down to Handouts:
1)
Please add the impervious surface chart (provided in the E72 Handout), asshown below, to the Site
Plan.
LineTypeArea (square feet)
1.Non-Regulated
ExemptRegulated
2.Replaced
3.New (Post 1977)+
Total Regulated Impervious Area
=
4.
Mitigation required if in excess of 2000sf
-
5.Total Area Mitigated by Existing Stormwater Management System(s)
=
6.Regulated Area Not Yet Mitigated
=
7.Area Proposed to be Mitigated by Low Impact Development Techniques
=
8.Area Proposed to be Mitigated through Conventional SWM Techniques
2)
Please showon the Site Planthe year of construction for all impervious surfaces.
3)
Although the new structure is to be placed on existing impervious surfaces, the new structure will be
considered new impervious surface. Please revise the impervioussurface calculations accordingly.
4)
Please show anystorm system that is on the property (i.e. catch basins, storm line, etc).
5)
Please show the water service line from the building to the water meter.
DATE E-MAILED7/13/2011PAGE(1)
City of EdmondsBLD20110474
TH
121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORK DEPARTMENT
Planning • Building • Engineering
Engineering Plan Review Comments
6)
Please show the side sewer from the main to the building.
a.
Please include the grease interceptor (see attached).
**Items 3, 4, 5 are to verify that the new structure is not built over the utilities. ***
Please resubmit 3 copies of the revised siteplansand associated documents with a written response to
each item to a Permit Coordinator. Please contact me at 425-771-0220ext 1321or by e-mail at
jennifer.lambert@ci.edmonds.wa.usif you have specific questions regarding these plan corrections.
DATE E-MAILED7/13/2011PAGE(1)