Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
BLD20110497.pdf
lllll�l�l �y of Eo,y�ti CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 7'1c. I A9U PHONE: (425) 771-0220 - FAX: (425) 771-0221 STATUS: ISSUED 8/2/2011I Permit #: BLD201104971 --BUILDING JERMIT Expiration Date: 8/2/2012 Project Addlr6s 9730 216TH PL SW, EDMUNDS; Parcel No: 00559700200100 TOM PETERSON HANSON DESIGN OWNER EXEMPTION 9730 216TH PL SW KRISTIN HANSON EDMONDS, WA 98020 652 ALDER ST EDMONDS, WA 98020 (425) 218-9335 EXT: (425) 218-9335 EXT: ( ) - EXT: LICENSE #: EXP: DEMOLISH EXISTING CARPORT (LEAVE SLAB) AND BUILD NEW 667 SQ FT GARAGE. AL 2 REM mT 371 SQ FT ADDITION ON EAST SIDE OF HOUSE. VALUATION: $79,085.20 COMFLE ED PERMIT TYPE: Residential PERMIT GROUP: 02 - Addition GRADING: N CYDS: 40 TYPE OF CONSTRUCTION: RETAINING WALL ROCKERY: N OCCUPANT GROUP: OCCUPANT LOAD: FENCE: N ( 0 X 0 FT.) CODE: 2009 OTHER: N ------ OTHER DESC: ZONE: RS -8 NUMBER OF STORIES: 0 1 VESTED DATE: NUMBER OF DWELLING UNITS: 1 LOT #: BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 BASEMENT: 0 1 ST FLOOR: 371 2ND FLOOR: 0 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 13RD FLOOR: 0 GARAGE: 667 DECK: 0 OTHER: I 1 FRONT SETBACK i tE UIRED: N 25 PROPOSED: 25.5 REQUIRED: S 7.5 PROPOSED: 11 RE UIRED: W 25 PROPOSED: 25.5 {EIGHT ALLOWED:25 PROPOSED:20.1 I REQUIRED: E 7.5 PROPOSED: 42.5 ;ETBACK NOTES: 1 AG EE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO P RSOZ BE EMPLOYED rNVIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27.IS LICATNOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPk6TA AND ALL FEES ARE PAID. i Print ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109/ IBCI 10/ IRCI 10. ONLINE APPLICANT ASSESSOR y " OTHER __01; , STATUS: ISSUED BLD20110497 • Installer shall provide the manufacturer's installation, operating instructions, and a whole house ventilation system operation description. A label shall be affixed to the whole house timer control that reads "Whole House Ventilation" (see operating instructions). • Lot line stakes must be in place at the time of foundation/setback inspection. • Approval of this foundation design is conditional subject to inspection of existing site soil conditions. • Retaining Walls must be designed and constructed to resist the lateral pressure of the retained material. • Provisions must be made for the control and drainage of surface water around buildings. • Hose Bibbs (exterior faucets) are required to have a permanently affixed anti -siphon device installed. • Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309 • Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted. • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City """"s ability to enforce any ordinance provision. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) BUILDING (425) 771-0220 EXT. 1333 1 ENGINEERING (425) 771-0220 EXT. 1326 1 FIRE (425) 775-7720 1 PUBLIC WORKS 425) 771-0235 1 PRE-TREATMENT 425 672-5755 1 RECYCLING 425) 275-4801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Prefereed and whether you prefer morning or afternoon. • E -Erosion ControlMtobilization • E -Engineering Final • B -Setbacks • B -Footings • B -Foundation Wall • B -Foundation Drainage • B -Isolated Footings/Piers • B -First Floor Framing • B -Plumb Rough In • B-Gas Test/Pipe • B-Mechanical Rough In • B-Exterior Wall Sheathing • B-Roof Sheathing • B-Shear Nailing • B-Framing • B-Wall Insulation/Caulk • B-Insulation/Energy • B-Sheetrock Nail • B-Building Final °F E°Mo Inspection Comments BLD20110497 02 - Addition Applied: 06/28/2011 Issued: 08/02/2011 Expires: 08/02/2012 Address: 9730 216TH PL SW, EDMONDS INSPECTION DATE INSPECTOR ACTION 1001 - E -Erosion Control/Mobilization 08/08/2011 LAMBERTJ PAR Comment: TESC Adequate at this time. 1001 - E -Erosion Control/Mobilization 01/05/2012 LAMBERTJ CMP Comment: Final Approved - instructed homeowner to install a barrier (i.e. straw wattles, etc) along 216th to prevent any runoff until they completed their landscaping in the spring - it doesn't appear that water will runoff - but requested to be on the safe side. 1034 - E -Water Service Line 10/20/2011 ZULAUF CMP Comment: ok to backfill 1077 - E -Engineering Final 12/22/2011 MCCONNELL COM Comment: Spoke with Mr. Peterson at front counter. He would like to put pavers in the ROW and is aware an encroachment permit is required should he choose to go that route. 1077 - E -Engineering Final 01/05/2012 LAMBERT) CMP Comment: Final approved - see note under erosion control 1106 - B -Setbacks 08/11/2011 STEINIKE CMP Comment: 1108 - B -Footings 08/11/2011 STEINIKE CMP Comment: 1110 - B -Foundation Wall 08/11/2011 STEINIKE CMP Comment: 1122 - B -First Floor Framing 08/19/2011 LAWLER CMP Comment: 1126 - B -Plumb Rough In 09/23/2011 STEINIKE CMP Comment: 1132 - B -Exterior Wall Sheathing 09/09/2011 LAWLER CMP Comment: 1136 - B -Shear Nailing 09/07/2011 STEINIKE PAR Comment: Hold-downs ok. 1136 - B -Shear Nailing 10/04/2011 STEINIKE CMP Comment: 1142 - B -Framing 09/29/2011 LAWLER COR Comment: see correction notice 5/8/2012 1:40:03 PM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 1 of 3 INSPECTION DATE INSPECTOR ACTION 1142 - B -Framing 10/03/2011 STEINIKE COM Comment: item #1 still not corrected, provide hanger for new header in lower level (bath/utility room) Mechanical system not approved, or complete at time of inspection. Complete and re -call. Also for Insulation low wall in basement adjacent to crawl space needs to show that it was insulated. (remove osb) 1142 - B -Framing 10/04/2011 STEINIKE CMP Comment: 1144 - B -Wall Insulation/Caulk 10/03/2011 STEINIKE COR Comment: See framing correction notice from 10/03/2011. 1144 - B -Wall Insulation/Caulk 10/04/2011 STEINIKE CMP Comment: 1146 - B-Insulation/Energy 12/21/2011 LAWLER COM Comment: Re -string and replace altered insulation in crawl space, ensure baffles are located at vents, remove board covering existing vent. 1146 - B-Insulation/Energy 12/28/2011 LAWLER CMP Comment: 1150 - B-Sheetrock Nail 10/07/2011 LAWLER PAR Comment: all except garage and master shower area 1150 - B-Sheetrock Nail 11/02/2011 STEINIKE COM Comment: Shower approved but still need garage fire wall inspection. 1150 - B-Sheetrock Nail 11/16/2011 STEINIKE CMP Comment: 1158 - B -Building Final 11/16/2011 STEINIKE COM Comment: Relocate opener and fill in with 5/8". 1158 - B -Building Final 12/21/2011 LAWLER COR Comment: Obtain engineering and electrical finals. Remove socks from sly smoke alarms Install hammer arrestors at clothes washer, dishwasher, and refrigerator supplies. Strap support expansion tank Caulk exterior wall penetrations Seal annular space at garage membrane penetration Repair insulation in crawl space 1158 - B -Building Final 12/28/2011 LAWLER COR Comment: all okay once engineering finals after approach completed. 1158 - B -Building Final 05/07/2012 LAWLER CMP Comment: 3024 - E-Drywell 08/16/2011 ZULAUF COM Comment: Added drywell to connect t/1 -wanted to get water away from foundation -no drainage requirements for this project. 5/8/2012 1:40:03 PM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 2 of 3 1INSPECTION DATE INSPECTOR ACTION 3024 - E-Drywell 01/06/2012 LAMBERTJ CMP Comment: Inspected by J.Zulauf - Final Approved 5/8/2012 1:40:03 PM 121 5th Ave, Edmonds Washington - Phone:'(425) 771-0220 Page 3 of 3 CUIZ5 -73. D w e r 34I - O" wST i M m ,- n� 0 o m N - m m D "ocm G:O mrm m Li m m �o - c,/i O Z W z C:) N D r T� N V , � V T N r $4b-4Ln h ♦A N N N o A �► i -no C) z M m �C') � co z Z? i Q �M cn �o D cr i m 21,—& 11 1 &U � N cD � m 7m0C~O N = < 0 t7 mC X X m C) O n W D r C + W 0 D m .. M m ,- n� 0 o m N - m m D "ocm G:O mrm m Li m m �o - c,/i O Z W z C:) N D r T� N V , � V T N r $4b-4Ln h ♦A N N N o A �► i -no C) z M m �C') � co z Z? i Q �M cn �o D cr i m 21,—& 11 1 &U � N cD � m 7m0C~O N = < 0 t7 mC X X m C) O n W D r C + W 0 D m .. lNi+� pp F+ o N �-A 0 II tD A Am0W°, r,��in�Q� T- y ( fl lN0 a to C ? T V V V V ISI 3 CL m Ln 1••� C1 t0 N = O 000 poo m vtv A D o LQ m 1 '0 CD X O m _ 0 0 4 Cl) N w O G. O vo N cD r► � -Z ve cn 0 SCC � C) ri ma V\ Sl �• en t1. 0 CA 0 Si a� T- y CD F 18` � 0 z 0 .0 ... Oi 3 CL " I m m o d. V) LA mDm00 OIZIC g m 9 .0 m -r-I z m m -nw 10"I v A�oo �o p m ,� V r N < .. + *<o o a N m m v c< O a .c A 0 cn 0 com. C) rn ' C')u Sl �• en cOm CA 0 Si a� T- y L) 18` � 0 z 0 .0 ... Oi 3 CL " D �- m m o d. m 0 TA 3 m _ 0 o -P Cl) 0 CL , LA mDm00 OIZIC g m 9 .0 m -r-I z m m -nw 10"I v A�oo �o p m ,� V r N < .. + *<o o a N m m v c< O cn 0 cn C) rn ' C')u o fi cOm CA T- sToRr1 L) 18` I• iz' LA mDm00 OIZIC g m 9 .0 m -r-I z m m -nw 10"I v A�oo �o p m ,� V r N < .. + *<o o a N m m v c< O 0 ZO d m cOm Z ii.•77 sToRr1 wa�r�� © r U'e V hr's LA mDm00 OIZIC g m 9 .0 m -r-I z m m -nw 10"I v A�oo �o p m ,� V r N < .. + *<o o a N m m v c< O