Loading...
BLD20110567.pdfGly OF E� p �N _ ° CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 enc. I gcO STATUS: ISSUED 11/2/2011 Expiration Date: 11/2/2012 Parcel No: 27033600106000 i Project Address_2302U EUNIO Nll5;WAY, L+ 1 �.__ _._. .S GRE EDMONDS WAY, LLC - 60 UNITS STUE510 MENG STRAZZARA VENTURE GENERAL CONTRCTNG LLC 2801 ALASKAN WAY SUITE 310 CHRIS DAVIDSON 2801 Alaskan Way SEATTLE, WA 98121 2001 WESTERN AVE, SUITE 200 SUITE 310 SEATTLE, WA 98121 Seattle, WA 98121 (206)215-9734 (206)587-3797 (206)834-6402 LICENSE #: VENTUGC899LZ EXP:6/9/2013 CONSTRUCT (1) 4 -LEVEL MIXED-USE BUILDING WITH 60 DWELLING UNITS. MIXED USE SPACE ON GROUND LEVEL, APARTMENTS ABOVE. VALUATION: $5,775,448.70 COMPLETED PERMIT TYPE: Commercial PERMIT GROUP: 06 - Apartment/Cundo New GRADING: N CYDS: 6000 TYPE OF CONSTRUCTION: VA,IA RETAINING WALL ROCKERY: N OCCUPANT GROUP: R-2, B, S-2 OCCUPANT LOAD: 405 FENCE: N ( 0 X 0 FT.) CODE: 09 OTHER: N ---OTHER DESC: ZONE: BC -EW NUMBER OF STORIES: 4 VESTED DATE: NUMBER OF DWELLING UNITS: 60 ILOT #: BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 BASEMENT: 6238 1 ST FLOOR: 14725 2ND FLOOR: 14725 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 13RD FLOOR: 14725 GARAGE: 23392 DECK: 0 OTHER: 0 FRONTSETBACK SIDE SETBACK REAR SETBACK REQUIRED: E 0 PROPOSED: 5 REQUIRED: W 15 PROPOSED: 15 RE UIRED: S 0 PROPOSED: 5 .-IEIGHT ALLOWEDA5 PROPOSED -45 I REQUIRED- N 0 PROPOSED: 14 SETBACK NOTES: Step back provided. I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTYAND ALL FEES ARE PAID. Signature Print Name Date Released 'Date— ' ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC 109/ IBC 10/ IRC I 10. ONLINE APPLICANT ASSESSOR XOTHER,,,,� STATUS: ISSUED BLD20110567 • Separate Permit Required For: electrical, elevator, plumbing, mechanical,fire sprinkler and alarm • Special inspections have been called for on this project and are noted on the approved construction plans and building permit. It is the owner and/or contractors responsibility to assure that reports are provided to the City on a weekly basis. Be advised -- if special inspection reports are not forthcoming, the Building Official may issue a "Stop Work" and no City inspections will be provided until such time as the reporting agency has complied and reports are reviewed and approved by the City. • Hose Bibbs (exterior faucets) are required to have a permanently affixed anti -siphon device installed. • In addition to the required pressure/relief valve, an approved listed expansion tank shall be installed on all hot water tanks. Per UPC 608. • Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309 • Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted. • Submit all special inspection reports to the City Building Inspector on a weekly basis. • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the water shutoff. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City """"s ability to enforce any ordinance provision. • New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible from the street or road fronting the property. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be legible from the public way, at least 4 inches high with a % inch min. stroke width on a contrasting background. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) CALL FOR INSPECTIONS BUILDING 425 771-0220 EXT. 1333 1 ENGINEERING 425 771-0220 EXT. 1326 FIRE 425 775-7720 PUBLIC WORKS 425) 771-0235 1 PRE-TREATMENT 425) 672-5755 1 RECYCLING 425) 275-4801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon. • E -Engineering Final • B -Setbacks • B -Slab Insulation • B -Pre -Rock (Beam/Col Wrap, Shafts) • B -Exterior Wall Sheathing • B-Roof Sheathing • B-Exterior Gypsum Sheathing • B-Shear Nailing • B-Ceiling Grid • B-Height Verification • B-Fire Stopping • B-Framing • B-Wall Insulation/Caulk • B-Insulation/Energy • B-Sheetrock Nail B-Building Final F-Fire Safety and Evacuation Plan • F-Addressing Visibility • F-Fire Final • P-Planning Final 9 (9M. EA OD cN .� M ,M mem tOa m =r o m mv00 m r'T +Ic xz3 000Z) =20 ?}gin Ci mM>ig vm�3 Z o od �y N nixCo D O. n ;. �r'-0 n OO kl y m v v = 2 c -n ,M _c,) a D m =r o m r'T +Ic ?}gin c� D� z vo v ' N_ 2 O� z o m ; Om 00 o c c X Mm D3 Z <� DN z v -n x= mm 0 4mo," ar. m m -1 m z O n ca F c v_ z Q N cr ux AM s ACV v m • N a N N O Q Cmc ✓ � 3 art 3 cc ' 0 m N � O C o N d a E3w ry -1 Com q m 9 m 3 n a m d a p N a 0 D r mem C M Q 00 ;0:4 ow x � 3 000 CD mmD� 0X 3 mn= c. v—N cn 0z�� cr-X< C3 CD F- DCQ'r�\ ♦ I oD0) <ze::; NG)= O ca m Wm cN'—'Nz a Fn a voz Q s O W y �mN Im 0 lo 1� 0-4 0D Q - m -a- Vl m 0 d � 7 N 0 < }31 ..40 N xD c M cn OO 0 icC r D< a� vG = m v cn x D co O� Z o x i o m N I; i Om 00 o X D9 Z m < � DN z0 C) -n xx mm Ln 0 s O- c �0/ 1 L CD ..h W cr N CD -f, CL o ar o ^N CCD Y O n CD W C W N r m ♦,. v N m 0 0 m a •• V m W 0 qm*` v m v r� m z O T W c O Z D CA car Uk F ' Inspection Comments s BLD20110567 06 - Apartment/Condo New n r, IR9� Applied: 07/21/2011 Issued: 11/02/2011 Expires: 11/02/2012 Address: 23020 EDMONDS WAY, EDMONDS INSPECTION DATE INSPECTOR ACTION 1077 - E -Engineering Final 08/19/2011 MCCONNELL COM Comment: Gutters and downspouts connected to the appropriate storm drainage systems? 1077 - E -Engineering Final 05/29/2012 MCCONNELL COM Comment: Inspection was called in, but JM contacted contractor and they still had some items to work on. 1077 - E -Engineering Final 07/11/2012 MCCONNELL COM Comment: Final inspection requested, but rain garden info still not recieved. JM contacted contractor. 1077 - E -Engineering Final 07/13/2012 MCCONNELL PAR Comment: Site construction approved. Working with Bruce and Lonnie on easements 1077 - E -Engineering Final 08/09/2012 MCCONNELL COM Comment: 8/14 - Easements scheduled for PPP Committee 8/21 - Easements scheduled for Council Approval 1077 - E -Engineering Final 10/01/2012 MCCONNELL CMP Comment: Recorded easements attached. Okay to final. 1106 - B -Setbacks 03/15/2012 LAWLER CMP Comment: As per Hansen Surveying letter dated March 7, 2012 1124 -.B-Pre-Rock (Beam/Col Wrap, Shafts) 03/13/2012 LAWLER PAR Comment: Okay to one side intumescent painted wood framing first floor framing pending approved special inspection 1124 - B -Pre -Rock (Beam/Col Wrap, Shafts) 05/03/2012 LAWLER CMP Comment: 1130 - B -Mechanical Rough In 05/03/2012 LAWLER CMP Comment: 1132 - B -Exterior Wall Sheathing 02/22/2012 LAWLER CMP Comment: 1133 - B -Roof Sheathing 02/02/2012 LAWLER PAR Comment: Area under cricket 1133 - 13 -Roof Sheathing 02/06/2012 LAWLER PAR Comment: Over framing at first cricket, sheathing gridlines 4.5-10' B-H 1133 - B -Roof Sheathing 02/07/2012 LAWLER PAR Comment: All except cricket north side 1133 - B -Roof Sheathing 02/10/2012 LAWLER CMP Comment: 1134 - B -Exterior Gypsum Sheathing 02/21/2012 LAWLER PAR Comment: South and s segment of W walls 2/5/2013 8:25:20 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 1 of 4 INSPECTION DATE s ACTION 1134 - B -Exterior Gypsum Sheathing 02/22/2012 _INSPECTOR:! LAWLER CMP Comment: 1136 - B -Shear Nailing 04/12/2012 LAWLER CMP Comment: 1138 - B -Ceiling Grid 04/19/2012 LAWLER COM Comment: Meant ceiling insulation, not complete 1138 - B -Ceiling Grid 06/29/2012 LAWLER CMP Comment: 1140 - B -Height Verification 03/15/2012 LAWLER CMP Comment: As per Hansen Surveying letter dated 3.7.12 1141 - B -Fire Stopping 03/15/2012 LAWLER COR Comment: Preliminary second floor missing low voltage firestopping 1141 - B -Fire Stopping 04/10/2012 LAWLER PAR Comment: Electrical penetrations PT slab 1141 - B -Fire Stopping 04/18/2012 LAWLER COR Comment: corridor electrical penetrations 1141 - B -Fire Stopping 05/02/2012 LAWLER COR Comment: Firestop stairwell ceiling membrane penetrations 1141 - B -Fire Stopping 06/29/2012 LAWLER CMP Comment: 1142 - B -Framing 02/27/2012 LAWLER COM Comment: Discussed intumescent paint as possibility. 1142 - B -Framing 03/06/2012 LAWLER COM Comment: Discussed with Bruce Moe about intumscent paint submittal, and inspected a mechanical room wall. One sided drywall will be removed if the paint is approved in leiu of fire treated wood. 1142 - B -Framing 03/14/2012 BJORBACK COR Comment: Ist floor Amenity area framing: 1) Provide City -approved plans for revised layout 2) Provide certification and documentation for spray applied Fire Cote on wood framing. 3) OK to insulate 1142 - B -Framing 03/20/2012 LAWLER PAR Comment: Preliminary walk thru, Jason made notes 1142 - B -Framing 03/21/2012 LAWLER PAR Comment: Second level corridor and 204,6,8,10,13,14,15,16,17,18,and 19 1142 - B -Framing 03/22/2012 LAWLER PAR Comment: second level framing 1142 - 113 -Framing 03/23/2012 LAWLER COM Comment: all second floor units except 200-207 & 209 1142 - B -Framing 03/26/2012 MILLERC PAR Comment: all framing approved - 200 level only 2/5/2013 8:25:20 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 2 of 4 INSPECTION DATE` INSPECTOR ACTION:' 1142 - B-Framing _ 03/30/2012 LAWLERyW COM Comment: Units 312-319 1142 - B-Framing 04/02/2012 LAWLER PAR Comment: Third floor okay to insulate 1142 - B-Framing 04/11/2012 LAWLER PAR Comment: preliminary fourth floor 1142 - B-Framing 04/12/2012 LAWLER PAR Comment: Fourth floor:complete two hour shafts to roof deck and misc. 1142 - B-Framing 04/13/2012 LAWLER PAR Comment: Third floor complete, forth floor okay pending Fire approval 1142 - B-Framing 04/18/2012 LAWLER PAR Comment: Fourth floor complete 1142 - B-Framing 05/02/2012 LAWLER CMP Comment: Stairwells 1144 - B-Wall Insulation/Caulk 02/28/2012 LAWLER PAR Comment: At elevator shaft 1144 - B-Wall Insulation/Caulk 03/07/2012 LAWLER PAR Comment: Second floor ceiling sound ins, 1144 - B-Wall Insulation/Caulk 03/16/2012 LAWLER PAR Comment:' Amenity area wall insulation approved pending revision approval, proceed at own risk 1144 - B-Wall Insulation/Caulk 03/26/2012 MILLERC PAR Comment: All insulation approved - 200 level only 1144 - B-Wall Insulation/Caulk 04/04/2012 LAWLER COM Comment: Level three complete 1144 - B-Wall Insulation/Caulk 05/03/2012 LAWLER COM Comment: level four and stairwells complete 1144 - B-Wall Insulation/Caulk 06/29/2012 LAWLER CMP Comment: 1146 - B-Insulation/Energy 04/17/2012 LAWLER PAR Comment: Attic to six inches below top chord, one third complete 1146 - B-Insulation/Energy 04/20/2012 LAWLER COM Comment: Cancelled 1146 - B-Insulation/Energy 04/23/2012 LAWLER PAR Comment: All residential units including corridor 1146 - B-Insulation/Energy 05/03/2012 LAWLER PAR Comment: stairwells 1146 - B-Insulation/Energy 05/24/2012 LAWLER CMP Comment: 2/5/2013 8:25:20 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 3 of 4 INSPECTION::, - DATE` INSPECTOR ACTION ' 1150 - B-Sheetrock Nail 03/07/2012 LAWLER PAR Comment: SRN trash chute and elevator shaft 1150 - B-Sheetrock Nail 03/29/2012 LAWLER PAR Comment: Units 214,15,17,18,19 1150 - B-Sheetrock Nail 04/06/2012 LAWLER COM Comment: second floor complete except units 207, 216, and stairwell 1150 - B-Sheetrock Nail 04/26/2012 LAWLER PAR Comment: units 400-413 1150 - B-Sheetrock Nail 04/30/2012 LAWLER PAR Comment: Fourth floor except stairwells 1150 - B-Sheetrock Nail 06/29/2012 LAWLER CMP Comment: 1158 - B-Building Final 05/25/2012 LAWLER PAR Comment: Final partial occupancy approved for recreation and office spaces rooms 104, 107,108,109,110 and 111 1158 - B-Building Final 06/29/2012 LAWLER COR Comment: Level 2: 1.) Elevator final 2.) Parking lot striping and signage 3.) Complete dishasher connections 4.) Deck Guards 1158 - B-Building Final 07/10/2012 LAWLER COR Comment: 1.) obtain final approvals from engineering, fire, OVWD 2.) functionality of CO detector in parking structure 3.) install ADA parking signage 4.) evidence of RPBA testing for all devices 1158 - B-Building Final 07/11/2012 LAWLER COR Comment: For complete final. 1,) Lnl final approval 2.) handrails both sides of exterior stairs NW corner of building 3.) install grab bars in one bathroom of type A units 4.) engineering final approval 1158 - B-Building Final 07/13/2012 LAWLER CMP Comment: 1950 - F-Fire Safety and Evacuation Plan 07/17/2012 SMITHM CMP Comment: APPROVED 1980 - F-Addressing Visibility 07/10/2012 SMITHM CMP Comment: APPROVED 1980 - F-Addressing Visibility 07/12/2012 SMITHM CMP Comment: APPROVED 1985 - F-Fire Final 07/17/2012 SMITHM CMP Comment: APPROVED 2000 - P-Planning Final 07/16/2012 JANICEK CMP Comment: Looks good. 2/5/2013 8:25:20 AM 121 .5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 4 of 4