Plan Review Corrections
Plan Check : Date:
# BLD20110669 September 20, 2011
Project Name/Address:
Trieu SFR 7109 Lake Ballinger Way
Contact Person/Address/Fax:
Brian Thaete 206-240-9459 brianthaete@hotmail.com
Reviewer: JoAnne ZulaufDivision:Engineering
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts and Standard Details referred to in these
comments can be accessed at our website: www.ci.edmonds.wa.us by clicking City Government / City
Department / Public Works / Engineering Division:
Please Note: Building Handouts do not include updated Engineering Division Requirements. Refer to
Engineering Handouts for all Engineering Requirements.
General:
1. Please provide 3 drawings for review as noted under requirements for submittal in the
Single Family Handout #B73: plot plan (site plan), grading/tesc plan and a
stormwater/utility plan. Please review the requirements for each plan in the handout in
sections 4, 5, and 6. I have added some additional notes below regarding each plan.
Plot Plan:
2. The plot or site plan needs to show the location of all the utilities and stormwater system
but does not need to include the details (length, size, etc.). I have attached an example.
3. The impervious surface calculation box from the Stormwater Management Handout #E72
Worksheet must be included on this plan.
Grading/Tesc Plan
4. The grading and erosion control plan should only show an outline of the house to be
demolished and an outline of the proposed house to show the areas of grade change. No
other details of the structure or driveway etc. are needed on this plan unless they are to
remain. Please note the square footage, material and year of its construction on any
areas that are to remain.
DATE FAXED/E-MAILED 9/20/2011 PAGE _1__ OF _2_
5. All erosion and sediment control measures shall be shown on the plan. Details of each
type of measure used shall be included with the plan. All details shall be consistent with
City of Edmonds standard details.
Stormwater/Utility Plan:
6. The stormwater system shall be sized in one of two ways:
a. The simplified sizing chart located in the Stormwater Handout E72A. If you choose
to use the simplified sizing chart, please review the section Design and
Construction Requirements. A system detail shall be provided consistent with the
example shown in handout.
b. If you choose to use a detention size not listed on the chart, the system must be
designed by a Civil Engineer. Calculations and a detail of the system are required.
7. All stormwater catch basins, yard drains etc. shall be noted with rim and invert elevations.
8. All regulated impervious surface must be connected to the detention system. See
Stormwater Management Handout Worksheet (# E72)to determined the regulated
impervious surface on the property.
9. Impervious surface calculations from worksheet are required on this plan.
10. All pipe, storm and other utilities, shall be noted with size, length and material.
11. All storm and utilities shall be shown from connection to City systems to connection at
residence.
12. Sewer shall have a 4 cleanout at house and a 6 cleanout at property or easement line.
13. Invert elevations shall be called out for Sewer cleanouts to verify slope.
14. Label any existing utilities or connections as existing.
DATE FAXED/E-MAILED 9/20/2011 PAGE _2__ OF _2_