Loading...
bld20110808-MacDonald.pdf City of Edmonds TH 121 5AVENUE NORTH •EDMONDS, WA 98020 • (425) 771-0220 FAX (425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT EngineeringDivision Plan Review Corrections Plan Check :Date: #BLD2011 0808November 4, 2011 Project Name/Address: MacDonald –9921Water St Contact Person/Address/Fax: Ron Johnson –ronmaile@comcast.net Reviewer:Jennifer LambertDivision:Engineering During review of the subject submittal,it was found that the following information, corrections, or clarifications wouldneed to be addressed. Our handouts can be found online at the City of Edmonds web site www.ci.edmonds.wa.usunder City Government/Development Services/Engineering Division. ***Please note that the single family will not receive an engineering final until all short plat improvements have been complete. *** Site and Grading Plan 1.Remove the title at the top of sheet. 2.Please remove all short plat date. 3.What does the note ‘Exist’g ridge of demetries house @ 55.75’’ mean? DATE MAILED/FAXED11/22/2011PAGE ____ OF ___ 14 4.Please add the impervious surface chart (provided in the E72 Handout), as shown below, to theSite Plan. LineTypeArea (square feet) 1.Non-Regulated ExemptRegulated 2.Replaced 3.New (Post 1977)+ Total Regulated Impervious Area = 4. Mitigation required if in excess of 2000sf - 5.Total Area Mitigated by Existing Stormwater Management System(s) = 6.Regulated Area Not Yet Mitigated = 7.Area Proposed to be Mitigated by Low Impact Development Techniques = 8.Area Proposed to be Mitigated through Conventional SWM Techniques 5.Please remove the note of ‘2917 sq ft existing structures to be removed’listed in the impervious areas. The 2917 sqft of impervious surfaces will not be remaining; therefore, it has no impact on the impervious surface calculations. 6.During the short plat improvements, Phase I, a portion of Water St was widened and a storm line was installed. Please show these improvements as installed underthe short plat. 7.Please remove all proposed utilities from the site and show them on the Drainage Plan. 8.Please remove any driveways, structures, impervious surfaces thatare to be removedfrom the Site Plan. The Site Plan should show only what is intended to remain onsite once the project is finaled. 9.Please indicate removal of the existing driveway approach on the Site Plan. 10.Please show the frontage improvements to be completed as approved under the short plat. 11.Please label the material to be used for the driveway. 12.Portions of the driveway within the right-of-way shall be asphalt. Please show asphalt from the property line to the edge of the paved road. 13.Show all existing and proposedprivate and/or public easements on the Site Plan. 14.If there are anyproposed fences, rockeries, or retaining walls, pleaseshowthemon the site plan. Storm Drain Plan 1.Please revise the title to ‘Drainage, Utility, TESCPlan’. 2.Please remove the title of detail, ‘Stormwater Detention Plan’. 3.Please remove the remaining portion of the title (also removed on the Site & Grading Plan) at the top of the page. DATE MAILED/FAXED11/22/2011PAGE ____ OF ___ 24 4.Please note that all new utilities must gounderground. 5.Please show the sewer from the house to the main. a.If the sewer main is to be extended, please submit drawings and associated details for review and approval . 6.Please show a 6” cleanout at the property line with a 12” cast iron lamphole cover with ½” hexbolts. 7.Please show a cleanout within 2’ of the house and any additional cleanouts that are required. 8.Please provide invert elevations for all cleanouts. 9.Please provide the elevation where the side sewer will connect to the city sewer main line. 10.It is unclear if the water service line from the house to meter is being shown. Please revise plans so that they water service line is clearly shown. 11.Please add a noteofthe size and propsed pipe material of the water service line. 12.Please noteon the plans that the water service line will be a minimum of 160 PSI, with minimum of 18” of cover, with a 12 gauge tracer wire grounded at house and meter. 13.Please show the proposed location of the water meter with the backside of the water meter at the property line. 14.Please add a note to the plans that the water meter will berelocated to the property line by the City of Emdonds, Water Department. 15.Please show the additional utilities from the property line to the house. This is to verify that power/gas/cable, etc maintains a 5’ separation from sewer and water. 16.During the short plat improvements, Phase I, a portion of Water St was widened and a storm line was installed. Please show the extension of the storm main as approved under the short plat. 17.Please provide rim and invert elevations for all pipe connections toeach catch basin. 18.Please provide invert elevations for tightline (at house) to verify coverage and slope. 19.Please provide invert elevations for the footing drains (at house & connection point) to verify coverage and slope. 20.Please add the impervious surface chart (as requested above) to the Drainage and Utility Plan. 21.Per the impervious surface calculations, the total impervious area is 4827 sq ft. The pipe proposed 32’ of 30” diameter pipe. This proposed system is designed for up to 4500 sq ft of impervious surface water runoff. Please refer to Handout #E72A for pipe sizing requirements and revise plans accordingly. 22.There is a note on the plans that states the following; ‘Provide drainage swale near property line to not allow water to flow onto adjacent property’. a.What is the use of the swale intended for (i.e. erosion control, storm system, etc)? b.Please show the location of the swale on the plans. c.Please show a detail of the swale. d.Please note where the water in the swale will be released to. DATE MAILED/FAXED11/22/2011PAGE ____ OF ___ 34 23.Please remove any driveways, structures, impervious surfaces that is not proposed from the Drainage and Utility Plan. The Drainage and Utility Plan should show only what is intended to remainonsite once the project is finaled. 24.Please remove the existing driveway approach from the Drainage and Utility Plan. Please resubmit 3 copies of the revised plans/documents to a Development Services Permit Coordinator. Please contact meat 425-771-0220ext, 1321if you have specific questions regarding these plan corrections. DATE MAILED/FAXED11/22/2011PAGE ____ OF ___ 44