Loading...
BLD20110816.pdfw G`1 OF E� CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 �"c. 1890 PHONE: (425) 771-0220 - FAX: (425) 771-0221 STATUS: ISSUED 1/12/2012 r Permit #: BLD20110816' BUILDING ll'I"11MIT Expiration Date: 1/12/2013 Project Address: 21401 72ND AVE W, EDMONDS Parcel No: 00580700002208 PREMIER ORTHOPEDIC GROUP- EDMONDS FIRST WESTERN DEVELOPMENT SRVS. PENNON CONSTRUCTION CO INC MEDICAL SCOTT SHANKS 5303 1 St Ave South Ste 100 8129 LAKE BALLINGER WAY 8129 LAKE BALLINGER WAY Seattle, WA 98108 EDMONDS, WA 98026 EDMONDS, WA 98026 (425)329-0848 (425)329-0848 (206)418-0235 LICENSE #: PENNOCC013Q3 EXP:6/3/2012 TENANT IMPROVEMENT FOR A MEDICAL CLINIC. WORK WILL INCLUDE EXAM ROOMS, BUSINESS AREAS, THREE OPERATING ROOMS, MRI, PHYSICAL THERAPY, AND WAITING AREAS. MECHANICAL AND PLUMBING INCLUDED. VALUATION: $748,821.44 PERMIT TYPE: Commercial PERMIT GROUP: 71 - Tenant Improvement GRADING: N CYDS: 0 TYPE OF CONSTRUCTION: 11-B RETAINING WALL ROCKERY: N OCCUPANT GROUP: B FENCE: N ( 0 X 0 FT.) OTHER: N -----OTHER DESC: NUMBER OF STORIES: 0 OCCUPANT LOAD: 286 CODE: 09 nu P ZONE: CG 2 1 VESTED DATE: NUMBER OF DWELLING UNITS: 0 LOT #: BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 IBASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 3RD FLOOR: 26146 GARAGE: 0 DECK: 0 OTHER: 0 13PD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 FRONTSETBACK SIDE SETBACK REAR SETBA REQUIRED: See Below PROPOSED: RE UIRED: PROPOSED: RE UIRED: PROPOSED: HEIGHT ALLOWED:O PROPOSED:O I REQUIRED: PROPOSED: SETBACK NOTES: Tenant improvement for interior changes only, so no change proposed to setbacks and height approved under BLD201 10815. 1 AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. THIS ALICATI N IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY ND ALL FEES ARE PAID. i — A _ Ian ame Released ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC 109/ IBC 10/ IRC110. = ONLINE = APPLICANT = ASSESSOR ® OTHER STATUS: ISSUED BLD20110816 • If visible from 72nd Ave. W, the rooftop equipment shall be screened from view or painted to match the building in a color approved by the Planning Division. • Final Locations of illuminated exit signs & emergency lighting subject to field inspection by the Building Inspector and Fire Marshal. • Separate Permit Required For: Shell and Core permit 2011-0815. See separate permits listed under shell permit. • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the water shutoff. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has.been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City """"s ability to enforce any ordinance provision. • Installation, use and maintenance of equipment and components shall be per manufacturer's specifications, installation instructions, and applicable state codes. Provide manufacture's installation instructions on site for Building Inspector. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) BUILDING (425) 771-0220 EXT. 1333 1 ENGINEERING (425) 771-0220 EXT. 1326 1 FIRE (425) 775-7720 J PUBLIC WORKS 425 771-0235 1 PRE-TREATMENT 425 672-5755 1 RECYCLING 425) 275-4801 When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being reauested. Contact Name and Phone Number, Date Prefereed, and whether you prefer morning or afternoon. • B -Plumb Ground Work B -Plumb Rough In • B -Gas Test/Pipe • B -Mechanical Rough In • B -Curb Attachments • B -Duct Seal • B -Refrigeration Lines • B-Hydronics • B -Ceiling Grid • B -Fire Stopping • B -Framing • B-Sheetrock Nail • B -Plumbing Final • B -Mechanical Final • B -Building Final • F -Fire Safety and Evacuation Plan • F -Fire Final P -Planning Final in c� z_ J m LL 0 z LU F- IL y� 7 N 0 C z Z N Lol j CI W 0 N WW xx LL� oZ y Q z V zZ Wa Lua W 0' D.U Ci O W LL MO W Z x H o N H > O z Z-4 w ice' _N � 2z�- m U COQ V OL m dU4 oo as — O ozN ar- WO W O Z.x �_a L: dwW 3 O LL x 0CLou ° o� m �wU. J Q CIO a9 f �a �DE r a oal '9I - llI 61 IlI T TT, • - o w �o n a N 00'16'25" e 206.73' 23( w I'e I frnwl — R MEMO M C N x O ;0 v? ►ri o �. Ea o CD CD CD y (� Z Nmm �Mc) m w' i�Cy JI rTy Yi 00 Z (� I rr N Z 1 0 0 � z � `0 CA, N N J ® {IyO � po � ssos� Gss N V 9`y'yt�TJI,TC`c, N 0 O2 T L 'PF, �/ ctdo S JL Iv�17 dr1l V 0) �cC M e z "t7 Zf/ CEJ ARr�. JJ -�N O 3 • ocn 1 d V B N A rt, o o m � V iii .; 1� � N e O (r, z o ��' Lbw (� � • M n li11j° Permit Submittal - Tenant Improvements o aPremier Orthopedic Group 21401 72nd Avenue West Edmonds. WA 98026 rz o013 >zq Mot Z , p,�, , r ,. 0 ,^ LL n C x �i•Z n A I Z N �Im Sr �n Ll D O SR\99 �Ri�wgr � oy Mot Z , p,�, , I'm, C. ,. ,^ LL n C x �i•Z N Z I Z N z w C0 N f w N O SCTURAL � o� ERKS� °F E°Moti Inspection Comments d V N BLD20110816 71 - Tenant Improvement Applied: 09/26/2011 Issued: 01/12/2012 Expires: 01/12/2013 I R90 Address: 21401 72ND AVE W, EDMONDS INSPECTION DATE INSPECTOR ACTION 1120 - B -Plumb Ground Work 02/13/2012 LAWLER PAR Comment: Groundwork east trench gridlines 3-(10') past 6 1120 - B -Plumb Ground Work 02/15/2012 LAWLER PAR Comment: West trench GL 3-12' past 6 1120 - B -Plumb Ground Work 02/21/2012 LAWLER PAR Comment: DWV line 71 C to G 1120 - B -Plumb Ground Work 02/24/2012 LAWLER COM Comment: Oil/Water separator 1120 - B -Plumb Ground Work 02/29/2012 LAWLER PAR Comment: Partial to sprinkler riser room 1120 - B -Plumb Ground Work 08/15/2012 LAWLER CMP Comment: 1124 - 13 -Refrigeration Line Test 11/08/2012 LAWLER CMP Comment: 1126 - B -Plumb Rough In 12/13/2011 MCCONNELL COM Comment: Inspection includes floor drains with oil/water separator and connection to sanitary sewer. 1126 - B -Plumb Rough In 07/13/2012 LAWLER PAR Comment: Zone 1 and rooms 326,7,8 1126 - B -Plumb Rough In 07/26/2012 LAWLER PAR Comment: PT zone level 2 and 3 1126 - B -Plumb Rough In 08/13/2012 LAWLER COM Comment: All DWV and water for level III, except recovery and OR zone 1126 - B -Plumb Rough In 10/31/2012 LAWLER CMP Comment: 1128 - B -Gas Test/Pipe 08/23/2012 LAWLER PAR Comment: Both gas and diesel lines 1128 - B -Gas Test/Pipe 08/29/2012 LAWLER PAR Comment: N2O and 02 at 150 psi, vacuum at 60 psi 1128 - B -Gas Test/Pipe 08/30/2012 LAWLER CMP Comment: All med gas, vacuum, and air held test 1128 - B -Gas Test/Pipe 10/31/2012 LAWLER CMP Comment: 1130 - B -Mechanical Rough In 06/29/2012 LAWLER PAR Comment: RTU1 curb attachment per Drawing A-27033-5-1 12/7/2012 9:22:47 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 1 of 4 INSPECTION A T DATE INSPECTOR''._ �=ACTIONS; 1130 - B-Mechanical Rough In 10/31/2012 LAWLER CMP Comment: 1132 - B-Curb Attachments 10/31/2012 LAWLER CMP Comment: 1133 - B-Duct Seal 07/11/2012 LAWLER PAR Comment: Zone 1 exam area 1133 - B-Duct Seal 08/01/2012 LAWLER PAR Comment: OR area 1133 - B-Duct Seal 08/10/2012 LAWLER PAR Comment: Stair three duct insulation 1133 - B-Duct Seal 08/23/2012 LAWLER PAR Comment: OR HEPA ductwork 1133 - B-Duct Seal 10/31/2012 LAWLER CMP Comment: 1134 - B-Refrigeration Lines 08/14/2012 LAWLER PAR Comment: Split system at Second level server room 1134 - B-Refrigeration Lines 10/31/2012 LAWLER CMP Comment: 1136 - B-Hydronics 08/13/2012 LAWLER PAR Comment: Level III, chiller 1 1136 - B-Hydronics 10/31/2012 LAWLER CMP Comment: 1138 - B-Ceiling Grid 09/04/2012 LAWLER COR Comment: Install perimeter wires at all walls, and slack wires on electrical fixtures 1138 - B-Ceiling Grid 09/06/2012 LAWLER COR Comment: Perimeter wires to structure, not just drywall 1138 - B-Ceiling Grid 09/07/2012 LAWLER PAR Comment: Exam zone 1138 - B-Ceiling Grid 09/19/2012 LAWLER PAR Comment: PT, lobby, and Entry. Interior furring framing at MRI room. 1138 - B-Ceiling Grid 09/26/2012 LAWLER PAR Comment: Clerestory and stair 1 1138 - B-Ceiling Grid 09/28/2012 LAWLER PAR Comment: Stair one entry complete 1138 - B-Ceiling Grid 10/05/2012 LAWLER COR Comment: Missing perimeter wires multiple locations 1138 - B-Ceiling Grid 10/09/2012 LAWLER PAR Comment: All except third floor lobby and parking level 12/7/2012 9:22:47 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 2 of 4 JINSPECTION DATE INSPECTOR ACTION ; 1138 - B -Ceiling Grid 10/30/2012 LAWLER PAR Comment: Third floor lobby 4x4 grid 1138 - B -Ceiling Grid 11/08/2012 LAWLER PAR Comment: parking strucure 1138 - B -Ceiling Grid 11/16/2012 LAWLER CMP Comment: MRI 1141 - B -Fire Stopping 09/27/2012 LAWLER PAR Comment: Dropped off maintainable bond requirements from Marie. 1141 - B -Fire Stopping .10/31/2012 LAWLER CMP Comment: 1142 - B -Framing 07/09/2012 LAWLER PAR Comment: Dropped off approved fueling station plans. Generator SOG approved pending special inspection. 1142 - B -Framing 07/16/2012 LAWLER COR Comment: 1.) fireblock stud cavities with rigid insulation 2.) install top of wall bracing at 8'oc intervals max spacing 1142 - B -Framing 07/19/2012 LAWLER COR Comment: Complete fire blocking with no air spaces 1142 - B -Framing 07/20/2012 LAWLER PAR Comment: Exam Zone 1142 - B -Framing 07/30/2012 LAWLER PAR Comment: PT/lobby zone cover 1142 - B -Framing 08/29/2012 LAWLER PAR Comment: One hour wall firestopping behind furred wall at GL31 1142 - B -Framing 10/31/2012 LAWLER CMP Comment: 1150 - B-Sheetrock Nail 07/24/2012 LAWLER PAR Comment: Exam rooms 1150 - B-Sheetrock Nail 07/26/2012 LAWLER PAR Comment: completion of exam zone 1150 - B-Sheetrock Nail 08/15/2012 LAWLER PAR Comment: Lead shielding at X-ray room 1150 - B-Sheetrock Nail 08/17/2012 LAWLER PAR Comment: Level III ACC restroom area 1150 - B-Sheetrock Nail 09/18/2012 MILLERC PAR Comment: Observed GWB attachment - Stair 1 - ok to cover tape mud - verified fuel station enclosure construction 1150 - B-Sheetrock Nail 10/31/2012 LAWLER CMP Comment: 12/7/2012 9:22:47 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 3 of 4 INSPECTION DATE INSPECTOR;' ACTION. 1152 - B -Plumbing Final 11/08/2012 LAWLER COR Comment: 1.) Install RPBA at ice maker 2.) Complete sink installations 3.) Listing for solids trap 1152 - B -Plumbing Final 11/26/2012 LAWLER CMP Comment: 1156 - B -Mechanical Final 11/14/2012 LAWLER PAR Comment: Just an observation 1156 - B -Mechanical Final 11/26/2012 LAWLER CMP Comment: 1158 - B -Building Final 12/03/2012 LAWLER COR Comment: See correction notice 1158 - B -Building Final 12/04/2012 LAWLER CMP Comment: 1950 - F -Fire Safety and Evacuation Plan 12/03/2012 SMITHM CMP Comment: APPROVED 1985 - F -Fire Final 12/03/2012 SMITHM CMP Comment: APPROVED 2000 - P -Planning Final 12/03/2012 MACHUGA CMP Comment: All exterior improvements done under Permit No. BLD20110815. No Planning inspection necessary for the interior improvements under this permit. Planning Division signs off 12/3/12. 12/7/2012 9:22:47 AM 121 5th Ave, Edmonds Washington - Phone: (425) 771-0220 Page 4 of 4