Loading...
bld20110816-Premier_Ortho-TI-E2.pdf DATE: December 6, 2011 TO: Scott Shanks scott@fwdsinc.com FROM: Jeanie McConnell, Engineering Program Manager RE: Application #: bld20110816 Tenant Improvement Project: Premier Orthopedic Group – nd Project Address: 21401 72 Ave W During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit three (3) sets of revised plans/documents with a written response to each of the items below to Marie Harrison. City of Edmonds handouts, standard details and development code can be referenced on the City website. NOTE: Shell & Core, Civils were reviewed under separate permit - #bld20110815. Review 1 – November 16, 2011 Review 2 – December 6, 2011 A0.3 – REFERENCE SITE PLAN ok 1. ok 2. P01 – LEGEND, SCHEDULES & GENERAL NOTES ok 1. 2.12/6/2011 – Thank you for adding the vent piping to the plans. You are correct that the backwater valve is not required, however, in this location installation would be appropriate and beneficial to the owner. Please confirm that the owner does not desire a backwater valve. 11/16/11 comment - Detail 1.1 shows a 2” vent on the 4” waste outlet pipe. In lieu of the vent installation of a backwater valve seems appropriate. This would prevent any sewer backup from entering the parking garage through this structure. bld20110816-Premier_Ortho-TI-E2.doc Page 1 of 2 P02 – FOUNDATION PLAN – WASTE AND VENT ok 1. ok 2. ok 3. 12/6/2011 – If a backwater valve is installed per comment 2 above, please show on the 4. plans. 11/16/11 comment - Please show location of backwater valve on the outlet side of the oil/water separator should you choose to install one. 12/6/2011 – Please show all floor drain locations. Will they be D5 drains? If so, please 5. indicate as such on the plans. 11/16/11 comment - The oil/water separator is the only drainage basin that has been shown on this plan sheet. There are other locations throughout the garage where it appears as though catch basins should be/could be installed … please clarify and add basins where necessary. P03 – LEVEL 1 FLOOR PLAN – WASTE AND VENT 1.ok 12/6/2011 – For clarification a note has been added to the plan. 2. 11/16/11 comment - The oil/water separator is shown on this plan sheet, but it is not at the level of the waste lines that are shown. Please grey out/dash line type. P04 – LEVEL 2 FLOOR PLAN – WASTE AND VENT ok 1. Please contact me at 425-771-0220 or by e-mail at mcconnell@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. bld20110816-Premier_Ortho-TI-E2.doc Page 2 of 2