Loading...
bld20110931_Chang-2.doc City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check : Date: # BLD20110931 December 5, 2011 rd Project Name/Address: Chang Demo SFR 17306 73 Ave W Contact Person/Address/Fax: Wallace Chang 425-894-0879 gnahc@uw.edu Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.ci.edmonds.wa.us by clicking City Government / City Department / Public Works / Engineering Division: 1. Please include details of each proposed erosion control measure that is consistent with City of Edmonds standard details. (Adding C of E details directly to the plan set is fine). 12/1/11 A Rockery is not considered an erosion control measure. Erosion control measures are methods used during construction to prevent erosion, dirt and silt from leaving the site. Discharges from sites caused by construction entering the storm system or nearby water sources, streams etc. is considered an illicit discharge violation resulting in fines, from the City and possibly the Dept of Ecology. If you plan to construct a rockery, a separate permit is required. 2. Show location and extent of each measure to be installed on the site plan. 12/1/11 Please see the attached details. Please include the details you choose to use with your plans and show where they will be installed on your site plan. Keep in mind when choosing your control measures that erosion sediment control will be required with your house construction as well. Depending on the slope of the property and the distance between the construction and the edge of property, sometimes vegetation will also be an effective erosion sediment control measure. If you choose to use existing vegetation in some areas, please note distance between construction and property line, and approximate slope on plans. Please note that the details I have attached are only some of the possible erosion control measures that are available. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 7/13/2017 PAGE ___ OF __ 11