Loading...
BLD20111031_KeyBank.pdf CITY OF EDMONDS th 121 5Avenue North,Edmonds WA 98020 Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.EdmondsWA.gov DEVELOPMENT SERVICES DEPARTMENT•PLANNING DIVISION DATE: March 27, 2012 TO: Joel Howitt, Barghausen Engineers: jhowitt@barghausen.com RE: Planning Division comments for file BLD20111031 -- Key Bank Greetings, Thank you for submitting a building permit application for a drive-through bank at 9930 Edmonds Way in the BN zone. I have reviewed the above building permit application for the Planning Division and it was found that the following information, corrections, or clarifications will need to be addressed before the Planning Division review can continue. 1.Landscape Bid: Please provide a cost estimate bid for all of the landscaping materials and labor, including irrigation. This will be used to create your bond and your planning inspection fee. 2.Street Tree Caliper: Please revise the landscape plan to show 3” caliper street trees (2” shown). Redlining the originals here at our office is acceptable. 3.Hearing Examiner Condition #5: FYI… Thank you for submitting a revised TIA for this proposal, dated March 4, 2012. Our Transportation Engineer has reviewed the updated report and has determined that it adequately addresses the traffic issues that were raised during the public hearing, and therefore, condition #5 has been satisfied (see attached memo). Please submit a written response to the above, along with any revised plans to your Permit Coordinator: Marie Harrison. All code citations can be found at: www.ci.edmonds.wa.us. If you have any questions, please do not hesitate to contact me. I look forward to working with you on this project. Sincerely, gina coccia:: associate planner City of Edmonds Development Services Department th 121 5Avenue North, Edmonds WA 98020 425.771.0220 x 1778 | coccia@ci.edmonds.wa.us cc: BLD20111031 1 | Page MEMORANDUM Date: March 27, 2012 To: Gina Coccia From: JoAnne Zulauf Subject: Key Bank ADB/CUP HE Condition #5:Traffic Impact Analysis Key Bank provided a revised Traffic Impact Analysisprepared by Jake Traffic Engineering, Inc.dated March 4,2012. The analysis included a a letter addressing the interconnecting access between the Key Bank property and the adjacent Ivar’s property. The letter and analysis has been reviewed by the City Transportation Engineer, Bertrand Hauss. It is his opinion that the revised report adequately addresses the concerns of HE Condition #5. Thank you. City of Edmonds