DATE: March 27, 2012
TO: Joel Howitt, Barghausen Engineers: jhowitt@barghausen.com
RE: Planning Division comments for file BLD20111031 -- Key Bank
Greetings,
Thank you for submitting a building permit application for a drive-through bank at 9930 Edmonds Way
in the BN zone. I have reviewed the above building permit application for the Planning Division and it
was found that the following information, corrections, or clarifications will need to be addressed before
the Planning Division review can continue.
1.Landscape Bid: Please provide a cost estimate bid for all of the landscaping materials and labor,
including irrigation. This will be used to create your bond and your planning inspection fee.
2.Street Tree Caliper: Please revise the landscape plan to show 3” caliper street trees (2” shown).
Redlining the originals here at our office is acceptable.
3.Hearing Examiner Condition #5: FYI… Thank you for submitting a revised TIA for this proposal,
dated March 4, 2012. Our Transportation Engineer has reviewed the updated report and has
determined that it adequately addresses the traffic issues that were raised during the public
hearing, and therefore, condition #5 has been satisfied (see attached memo).
Please submit a written response to the above, along with any revised plans to your Permit
Coordinator: Marie Harrison. All code citations can be found at: www.ci.edmonds.wa.us. If you have
any questions, please do not hesitate to contact me. I look forward to working with you on this project.
Sincerely,
gina coccia:: associate planner
City of Edmonds Development Services Department
th
121 5Avenue North, Edmonds WA 98020
425.771.0220 x 1778 | coccia@ci.edmonds.wa.us
cc: BLD20111031
1 | Page
MEMORANDUM
Date:
March 27, 2012
To:
Gina Coccia
From:
JoAnne Zulauf
Subject:
Key Bank ADB/CUP
HE Condition #5:Traffic Impact Analysis
Key Bank provided a revised Traffic Impact Analysisprepared by Jake Traffic Engineering,
Inc.dated March 4,2012. The analysis included a a letter addressing the interconnecting
access between the Key Bank property and the adjacent Ivar’s property. The letter and
analysis has been reviewed by the City Transportation Engineer, Bertrand Hauss. It is his
opinion that the revised report adequately addresses the concerns of HE Condition #5.
Thank you.