Loading...
bld20111064_Simpson-1.doc City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Plan Review Corrections Plan Check : Date: # BLD20111064/1065 January 5, 2012 Project Name/Address: Simpson Demo SFR/Grading 626 Maple St Contact Person/Address/Fax: Scot Simpson 425-280-8920 scotsimpson@comcast.net Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.ci.edmonds.wa.us by clicking City Government / City Department / Public Works / Engineering Division: Bld20111064 Demolition 1. Please provide a Demolition Plan without the fill and grading that was done later. Show all structures that originally existed on the property and any driveways, walkways etc that were removed. 2. Show the location of the utilities on the Demolition Plan. The location you have stubbed them to is fine. 3. Show on the Demolition Plan the temporary erosion control measures that should have been in place when demolishing the structure. Bld20111065 Grading/Fill 1. Please show actual elevations using a permanent fixed point (datum). The sidewalk is not considered a permanent fixed point since if it is removed, the replacement may be at a different elevation. See the Building Handout B41 for more information about how to choose a datum point. If you have any additional questions, please contact the Building Division. 2. Show how soils are to be stabilized. The stabilization must be a permanent method since there will be no construction on this lot at this time. Soils must be compost amended per City of Edmonds Handout E72 C, and stabilized using hydro-seeding, landscape planting, or other permanent method to stabilize soil. DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 12 Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __ 22