bld20120017_KeyBank-1.doc
City of Edmonds
TH
121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORKS DEPARTMENT
Engineering Division
Plan Review Corrections
Plan Check : Date:
# BLD20120017 January 11, 2012
Project Name/Address:
Key Bank Demo 9930 Edmonds Way
Contact Person/Address/Email:
Darren M. 425-252-5800 DarrenM@Clearcreek.com
Reviewer: JoAnne ZulaufDivision:Engineering
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts and Standard Details referred to in these
comments can be accessed at our website: www.edmondswa.gov.
1. Please provide a temporary erosion and sediment control plan.
2. Please show on plan where all measures will be installed.
3. include details of each proposed erosion control measure to be used. All details must be
consistent with City of Edmonds standard details. City of Edmonds details can be
accessed on our website by choosing Government/Departments, under Public Works
choose Engineering Standards then click the link “Edmonds Standard Details” found within
the introduction paragraph. Section 1 shows our Erosion Control standards. Other
measures not found on our website can be used. Please include a detail of any other
measures used.
4. If concrete/pavement will remain for 20ft into the site then it can be considered a
construction entrance for this work.
5. Please include notes stating that trucks will enter and exit on Edmonds Way and that the
haul route will be Edmonds Way to Highway 99 or I-5 (or both).
6. If there is to be a closure of any traffic lanes or sidewalks, you must submit for a Right of
Way permit and include a traffic and sidewalk control plan. See Handout E#81 (available
on our website).
7. Please show on plans where utilities will be capped and show that hose bib will be
installed.
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.
DATE FAXED/E-MAILED 7/2/2017 PAGE ___ OF __
11