Loading...
bld20120024_Chelioudakis_ENG1.pdf City of EdmondsBLD20120024 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments PermitApplication:Date: #BLD20120024March 28, 2012 nd Project Name/Address: Chelioudakis –10018–242Pl SW Contact Person/Address, Fax or E-mail: Reviewer: JENNIFERLAMBERTDivision: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.ci.edmonds.wa.usunder City Government / Development Services Department / Engineering Division then scroll down to Handouts: 1)Please add a note that all disturbed soils will be compost amended (see attached handout E72C). 2)Please show the location of the sewer fromthe main to the house (see attached as-built). 3)Please show the water service line from the meter to the house. 4)Please add the impervious surface chart(provided in the E72 Handout),asshown below, to the Site Plan. LineTypeArea (square feet) 1.Non-Regulated ExemptRegulated 2.Replaced 3.New (Post 1977)+ Total Regulated Impervious Area = 4. Mitigation required if in excess of 2000sf - 5.Total Area Mitigated by Existing Stormwater Management System(s) = 6.Regulated Area Not Yet Mitigated = 7.Area Proposed to be Mitigated by Low Impact Development Techniques = 8.Area Proposed to be Mitigated through Conventional SWM Techniques 5)Please show clearly show and label allimpervious surfaces(asphalt,concrete, gravel, etc) on the Site Plan. DATE E-MAILED3/28/2012PAGE(1) City of EdmondsBLD20120024 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments 6)Please show the year of construction for all impervious surfaces(asphalt, concrete, gravel, etc). 7)Please show the Driveway on the Site Plan. 8)Please show the roof lines on the Site Plan. a.Please clearly distinguish between existing roof line and proposed (new). 9)Please add a note to the plans stating what material the patio is and when it was constructed. 10)Please show any fences, retaining walls, and rockeries on the Site Plan. 11)Please show the property lines on the Site Plan. **Due to the lack of information on the Site Plan, Engineering is unable to complete a full review at this time. Once the revised Site Plan is submitted addressing the above comments, Engineering will continue the review.*** Please resubmit 3 copies of the revised plansand associated documents with a written response to each item to a Permit Coordinator. Please contact me at 425-771-0220ext 1321or by e-mail at jennifer.lambert@ci.edmonds.wa.usif you have specific questions regarding these plan corrections. DATE E-MAILED3/28/2012PAGE(2)